ML24180A003

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072)
ML24180A003
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 06/28/2024
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Zurawski L
Exelon Generation Co
References
L-2024-LLA-0072
Download: ML24180A003 (2)


Text

From: Joel Wiebe Sent: Friday, June 28, 2024 5:59 AM To: Zurawski, Lisa M:(Constellation Nuclear)

Subject:

NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome GAIA Fuel (L-2024-LLA-0072)

Hi Lisa,

By letter dated May 28, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24149A125), Constellation Energy Generation, LLC (Constellation) submitted a request for amendment for Byron and Braidwood Stations. Specifically, Constellation requested to revise the Technical Specifications (TS) to allow the use of Framatome GAIA fuel. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> to complete. The NRC staff expects to complete this review by June 18, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606 or Joel.Wiebe@nrc.gov.

Joel

Hearing Identifier: NRR_DRMA Email Number: 2540

Mail Envelope Properties (SA9PR09MB4976B1481764DE45D93C356F8BD02)

Subject:

NRC Acceptance Review of ByronBraidwood Amendment for Transition to Framatome GAIA Fuel (L-2024-LLA-0072)

Sent Date: 6/28/2024 5:58:57 AM Received Date: 6/28/2024 5:58:00 AM From: Joel Wiebe

Created By: Joel.Wiebe@nrc.gov

Recipients:

"Zurawski, Lisa M:(Constellation Nuclear)" <lisa.zurawski@constellation.com>

Tracking Status: None

Post Office: SA9PR09MB4976.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2338 6/28/2024 5:58:00 AM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: