Cyber Security Inspection Report 05000456/2022402 and 05000457/2022402
ML22181A144
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/30/2022
From: Richard Skokowski
Engineering Branch 3
To: Rhoades D
Exelon Generation Co LLC, Exelon Nuclear
References
IR 2022402
Download: ML22181A144 (3)


Text

SUBJECT:

BRAIDWOOD STATION - CYBER SECURITY INSPECTION REPORT 05000456/2022402 AND 05000457/2022402

Dear Mr. Rhoades:

On May 23, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Station and discussed the results of this inspection with Bart Keller and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Braidwood Station.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.7] - Documentation.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Braidwood Station.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

June 30, 2022 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Richard A. Skokowski, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77 Enclosure:

As stated cc: M. Knott, Braidwood Station Security Manager A. Khayyat, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV Signed by Skokowski, Richard on 06/30/22

ML22181A144 Entire Report:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIII RIII NAME JGilliam:mb RSkokowski DATE 06/30/2022 06/30/2022