MONTHYEARML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24306A0072024-06-26026 June 2024 NRR E-mail Capture - Verbal Relief for Byron, Unit 2, Three Specific Air-operated Valves in the Essential Service Water System (L-2024-LLR-0042) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24108A1352024-05-20020 May 2024 Email to Christian Williams Re Decision on the Exemption Request for Calvert Cliffs ML24108A1312024-05-15015 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Calvert Cliffs Exemption ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) NRC-2024-0085, Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request2024-05-0909 May 2024 Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24131A1212024-04-29029 April 2024 Email to State of MD Requesting Review of the EA for Calvert Cliffs Exemption Request ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML24039A0412024-01-30030 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Braidwood Request for Alternative (I4R-18) ML24030A0022024-01-30030 January 2024 NRR E-mail Capture - NRC Acceptance Review for Braidwood Station, Units 1 and 2, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request – ISFSI Docket No. Reference ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request – ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation – R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22339A0032022-09-28028 September 2022 R. E. Ginna Nuclear Power Plant - Ginna: Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report ML22269A4522022-09-22022 September 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report (COLR) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) 2024-09-06
[Table view] |
Text
From: Wiebe, Joel Sent: Wednesday, March 2, 2022 8:38 AM To: Henderson, Phillip A:(Exelon Nuclear); Lisa Simpson (Lisa.Simpson@constellation.com)
Subject:
Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5, "CORE OPERATING
Hi Phil/Lisa,
The reasons for non-acceptance are described below. Let me know when you are ready to discuss the two sufficiency items below. LIC-109 requires a conference call within 5 working days of the date of this e-mail.
Joel
By letter dated January 24, 2022, Exelon Generation, LLC, proposed to revise the Technical Specifications (TSs) for Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Calvert Cliffs Station, Units 1 and 2, and Ginna Station as necessary to add a reference to the topical report SSP-14-P01/028-TR-P-A, Generic Application of the Studsvik Scandpower Core Management System to Pressurized Water Reactors to TS 5.6.5.b, the Core Operating Limits Report (COLR) references (Agencywide Document Access and Management System (ADAMS)
Package Accession No. ML ML22025A235). On February 1, 2022 (ADAMS Accession No. ML22032A333), Exelon Generation Company, LLC was renamed Constellation Energy Generation, LLC.
The topical report, SSP-14-P01/028-TR-P-A, includes the NRC staffs safety evaluation report that provides generic approval of the CMS5 system of codes, consisting of CASMO5, CMSLINK5, and SIMULATE5. By virtue of the generic approval, the topical report addresses primarily theory, numerics, and qualification, and does not address the plant-specific implementation of these codes, or compliance with an individual plants licensing basis requirements.
The NRCs Standard Review Plan (NUREG-0800), Section 4.3 Nuclear Design covers the areas of review for nuclear design methodologies. Much of the required areas of review have already been addressed during the review of the generic topical report; however, the plant-specific application of the method and incorporation into a plants licensing basis remain to be addressed during the review of the license amendment request (LAR). Specifically, the SRP 4.3 Acceptance Criteria state:
The acceptance criteria in the area of power distribution are that the information presented should satisfactorily demonstrate that:
[]
B. A reasonable probability exists that in normal operation the design limits will not be exceeded, based on consideration of [] the accuracy of design calculations used in developing correlations when primary variables are not directly measured; [and] the uncertainty analyses for the information and processing system []
These acceptance criteria tie directly into GDC 10 and the associated design criteria for pre-GDC plants.
Without the sufficiency items below it is not possible to evaluate whether there is reasonable assurance that GDC 10 would be satisfied.
Sufficiency Items:
In accordance with Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-109, Acceptance Review Procedures for Licensing Basis Changes, the NRC staff performed a review to determine whether the proposed incorporation of SSP-14-P01/028-TR-P-A includes sufficient information to begin a detailed technical review. Using the guidance provided in Appendix B, Guide for Performing Acceptance Reviews, of LIC-109, the NRC staff determined that the proposed license amendment does not contain sufficient information to initiate its review, as described below:
- 1. Completeness of Scope: SSP-14-P01/028-TR-P-A provides generic Nuclear Uncertainty Factors (NUFs) and the associated Nuclear Reliability Factors (NRFs), but also provides a method to calculate plant-specific NUFs. The licensees January 24, 2022, letter does not contain a summary of the analysis used to formulate the NUFs for each unit, including whether generic or plant-specific factors are used.
- 2. Sufficiency of Information: LIC-109 states:
The information provided should support a comparison of the RLA to the licensees existing processes or programs, if applicable, with justification for the change. If significant, obvious problems are identified, the RLA should be considered unacceptable.
The LAR, as submitted, does not contain a description of how SSP-14-P01/028-TR-P-A impacts downstream safety analyses. Please describe what quantities or parameter limits Constellation intends to calculate using CMS5 and explain how they are used in downstream cycle-specific analyses. Also, explain whether SSP-14-P01/028-TR-P-A will replace or supplement the existing methods used by Constellation to generate the COLR for each facility. For each type of quantity that is associated with a regulatory requirement (e.g., to determine local power as input to a critical heat flux calculation),
provide an analysis or evaluation demonstrating that the applicable regulatory requirements (e.g., GDC 10) are satisfied. As an example, a summary that maximum peaking factors predicted for one plant using CMS5 are reasonably comparable to those calculated using the existing methodology, could be an acceptable amount of information to provide.
Hearing Identifier: NRR_DRMA Email Number: 1576
Mail Envelope Properties (MN2PR09MB49714D0C0CCB6FA70E28E8A88B039)
Subject:
Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5, "CORE OPERATING Sent Date: 3/2/2022 8:37:54 AM Received Date: 3/2/2022 8:37:00 AM From: Wiebe, Joel
Created By: Joel.Wiebe@nrc.gov
Recipients:
"Henderson, Phillip A:(Exelon Nuclear)" <Phillip.Henderson@constellation.com>
Tracking Status: None "Lisa Simpson (Lisa.Simpson@constellation.com)" <lisa.simpson@constellation.com>
Tracking Status: None