May 20, 2021
SUBJECT:
BRAIDWOOD GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2021401 AND 05000457/2021401
Dear Mr. Rhoades:
On May 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Generating Station and discussed the results of this inspection with Mr. J. Keenan and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000456 and 05000457
License Numbers:
Report Numbers:
05000456/2021401 and 05000457/2021401
Enterprise Identifier: I-2021-401-0111
Licensee:
Exelon Generation Company, LLC
Facility:
Braidwood Generating Station
Location:
Braceville, IL
Inspection Dates:
January 12, 2021 to May 07, 2021
Inspectors:
A. Anderson, Physical Security Inspector
G. Bonano, Physical Security Inspector
J. Gilliam, Project Engineer
J. Kutlesa, Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
(1)
- Tier I: All
- Tier II: 02.05; 02.06
- Tier III: N/A
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All
- Tier II: 02.06; 02.08 (d-f)
- Tier III:
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 7, 2021, the inspectors presented the security baseline inspection results to Mr. J. Keenan and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Access
Authorization
Files
100 Files Reviewed
Various
Procedures
Access Authorization Program
Review Criteria for Determining Trustworthiness and Reliability
Procedures
Control and Classification of Safeguards Information (SGI) and
Sensitive Unclassified Non-Safeguards Information (SUNSI)
SY-AA-101-112-
1004
Protected Area Search Processes
SY-AA-101-112-
1005
Owner Controlled Area Inspection Processes