IR 05000456/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000456/2021401 and 05000457/2021401
ML21140A033
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/20/2021
From: Steven Orth
Plant Support Branch II
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021401
Download: ML21140A033 (7)


Text

May 20, 2021

SUBJECT:

BRAIDWOOD GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2021401 AND 05000457/2021401

Dear Mr. Rhoades:

On May 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Generating Station and discussed the results of this inspection with Mr. J. Keenan and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000456 and 05000457

License Numbers:

NPF-72 and NPF-77

Report Numbers:

05000456/2021401 and 05000457/2021401

Enterprise Identifier: I-2021-401-0111

Licensee:

Exelon Generation Company, LLC

Facility:

Braidwood Generating Station

Location:

Braceville, IL

Inspection Dates:

January 12, 2021 to May 07, 2021

Inspectors:

A. Anderson, Physical Security Inspector

G. Bonano, Physical Security Inspector

J. Gilliam, Project Engineer

J. Kutlesa, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1)

  • Tier I: All
  • Tier II: 02.05; 02.06
  • Tier III: N/A

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All
  • Tier II: 02.06; 02.08 (d-f)
  • Tier III:

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 7, 2021, the inspectors presented the security baseline inspection results to Mr. J. Keenan and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Miscellaneous

Access

Authorization

Files

100 Files Reviewed

Various

Procedures

SY-AA-103-500

Access Authorization Program

SY-AA-103-507

Review Criteria for Determining Trustworthiness and Reliability

71130.02

Procedures

SY-AA-101-106

Control and Classification of Safeguards Information (SGI) and

Sensitive Unclassified Non-Safeguards Information (SUNSI)

SY-AA-101-112-

1004

Protected Area Search Processes

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

2