November 5, 2012

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT;

NRC INTEGRATED INSPECTION REPORT 05000263/2012004

Dear Mr. Schimmel:

On September 30, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the inspection findings, which were discussed on October 10, 2012, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One NRC-identified finding and one self-revealed finding of very low safety significance were identified during this inspection.

One of these findings was determined to involve a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, - Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Monticello Nuclear Generating Plant. In addition, if you disagree with a cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects

Docket No. 50-263 License No. DPR-22

Enclosure:

Inspection Report 05000263/2012004; w/Attachment: Supplemental Information

REGION III==

Docket No:

50-263 License No:

DPR-22 Report No:

0000263/2012004 Licensee:

Northern States Power Company, Minnesota Facility:

Monticello Nuclear Generating Plant Location:

Monticello, MN Dates:

July 1 through September 30, 2012 Inspectors:

S. Thomas, Senior Resident Inspector

P. Voss, Resident Inspector

K. Stoedter, Prairie Island Senior Resident Inspector

M. Phalen, Senior Health Physicist

S. Bell, Health Physicist

Approved by:

K. Riemer, Branch Chief Branch 2 Division of Reactor Projects

Enclosure

SUMMARY

OF

PLANT STATUS

REACTOR SAFETY

....................................................................................................... 3

1R01 Adverse Weather Protection

............................................................. 3

1R04 Equipment Alignment

........................................................................ 4

1R05 Fire Protection

................................................................................... 5

1R06 Flooding

............................................................................................. 5

1R11 Licensed Operator Requalification Program

...................................... 7

1R12 Maintenance Effectiveness

............................................................... 8

1R13 Maintenance Risk Assessments and Emergent Work Control

.......... 9

1R15 Operability Determinations and Functional Assessments

............... 11

1R18 Plant Modifications

.......................................................................... 12

1R19 Post-Maintenance Testing

............................................................... 13

1R20 Outage Activities

............................................................................. 13

1R22 Surveillance Testing

........................................................................ 15

1EP6 Drill Evaluation

RADIATION SAFETY

................................................................................................... 16

2RS2 Occupational As-Low-As-Is-Reasonably-Achievable Planning and Controls

OTHER ACTIVITIES

.................................................................................................... 18

4OA1 Performance Indicator Verification

....................................................... 18

4OA2 Identification and Resolution of Problems

............................................ 21

4OA3 Follow-Up of Events and Notices of Enforcement Discretion

............... 23

4OA5 Other Activities................................................................................................... 26

4OA6 Management Meetings...................................................................................... 28

4OA7 Licensee-Identified Violations............................................................................ 28

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

........................................................................................................ 1

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED............................................................. 2

LIST OF DOCUMENTS REVIEWED

............................................................................................ 3