MONTHYEARIR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 IR 05000457/20214202023-03-22022 March 2023 Reissued - Braidwood Generating Station, Unit 1 and 2, Security Inspection Report Cover Letter 05000456 and 05000457-2021420 IR 05000456/20220062023-03-0101 March 2023 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2022006 and 05000457/2022006) IR 05000456/20220042023-01-26026 January 2023 Integrated Inspection Report 05000456/2022004 and 05000457/2022004 ML22269A4992022-11-0808 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report IR 05000456/20220032022-10-25025 October 2022 Integrated Inspection Report 05000456/2022003 and 05000457/2022003 and Exercise of Enforcement Discretion IR 05000456/20224202022-10-24024 October 2022 Cover Letter Braidwood Station Units 1 and 2 Security Baseline Inspection Report 05000456/2022420 and 05000457/2022420 IR 05000456/20224032022-08-23023 August 2022 Material Control and Accounting Program Inspection Report 05000456/2022403 and 05000457/2022403 IR 05000456/20220052022-08-22022 August 2022 Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2022005; 05000457/2022005) IR 05000456/20220022022-07-26026 July 2022 Integrated Inspection Report 05000456/2022002; 05000457/2022002; and 07200073/2022001 IR 05000456/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000456/2022011 and 05000457/2022011 IR 05000456/20224012022-07-13013 July 2022 Security Baseline Inspection Report 05000456/2022401 and 05000457/2022401 IR 05000456/20220102022-06-22022 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000456/2022010 and 05000457/2022010 IR 05000456/20220012022-05-0303 May 2022 Integrated Inspection Report 05000456/2022001 and 05000457/2022001 IR 05000456/20223012022-04-0606 April 2022 NRC Initial License Examination Report 05000456/2022301 and 05000457/2022301 IR 05000456/20225012022-03-21021 March 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000456/2022501 and 05000457/2022501 IR 05000456/20210062022-03-0202 March 2022 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2021006 and 05000457/2021006) IR 05000456/20224022022-02-0404 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 IR 05000456/20210042022-01-28028 January 2022 Integrated Inspection Report 05000456/2021004 and 05000457/2021004 IR 05000456/20210032021-10-26026 October 2021 Integrated Inspection Report 05000456/2021003 and 05000457/2021003 IR 05000456/20214022021-09-16016 September 2021 Security Baseline Inspection Report 05000456/2021402 and 05000457/2021402 IR 05000456/20210052021-09-0101 September 2021 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2021005 and 05000457/2021005) IR 05000456/20210022021-07-22022 July 2021 Integrated Inspection Report 05000456/2021002 and 05000457/2021002 IR 05000456/20210102021-07-19019 July 2021 Triennial Fire Protection Inspection Report 05000456/2021010 and 05000457/2021010 IR 05000456/20214012021-05-20020 May 2021 Security Baseline Inspection Report 05000456/2021401 and 05000457/2021401 IR 05000456/20210012021-04-16016 April 2021 Integrated Inspection Report 05000456/2021001 and 05000457/2021001 IR 05000456/20200062021-03-0404 March 2021 Annual Assessment Letter for Braidwood Station (Report 05000456/2020006 and 05000457/2020006) IR 05000456/20200042021-01-26026 January 2021 Integrated Inspection Report 05000456/2020004; 05000457/2020004; and 07200073/2020001 IR 05000456/20200122020-11-18018 November 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000456/2020012 and 05000457/2020012 IR 05000456/20200032020-11-10010 November 2020 Integrated Inspection Report 05000456/2020003 and 05000457/2020003 IR 05000456/20204022020-10-0202 October 2020 Security Baseline Inspection Report 05000456/2020402 and 05000457/2020402 2024-09-12
[Table view] Category:Letter
MONTHYEARRS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23
[Table view] |
Text
November 18, 2020
SUBJECT:
BRAIDWOOD GENERATING STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000456/2020012 AND 05000457/2020012
Dear Mr. Hanson:
On October 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Generating Station and discussed the results of this inspection with Mr. J. Keenan, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000456 and 05000457 License Numbers: NPF-72 and NPF-77 Report Numbers: 05000456/2020012 and 05000457/2020012 Enterprise Identifier: I-2020-012-0019 Licensee: Exelon Generation Company, LLC Facility: Braidwood Generating Station Location: Braceville, IL Inspection Dates: October 05, 2020 to October 23, 2020 Inspectors: J. Benjamin, Senior Reactor Inspector I. Hafeez, Reactor Inspector E. Sanchez Santiago, Senior Reactor Inspector Approved By: Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Braidwood Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. Regional based inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. For the inspection documented below portions of the IP were completed remotely as well as on site and all the objectives and requirements for completion of the IP were met.
REACTOR SAFETY
Main article: IP 71111.21
The inspectors:
a.
Determined whether the sampled power operated valves (POVs) listed below are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.
b.
Determined whether the sampled POVs are capable of performing their design-basis functions.
c.
Determined whether testing of the sampled POVs is adequate to demonstrate the capability of the POVs to perform their safety functions under design-basis conditions.
d.
Evaluate maintenance activities including a walkdown of the sampled POVs (if accessible).
- (1) 2RY455A, Pressurizer Power Operated Relief Valve
- (2) 1MS001B, Steam Generator Main Steam Isolation Valve
- (3) 1RH8716A, Residual Heat Removal Pump Discharge Crosstie Isolation Valve
- (4) 1CC685, Component Cooling from Reactor Coolant Pumps Thermal Barrier Isolation Valve
- (5) 1RH8701B, Reactor Coolant Loop 1A to Residual Heat Removal Pump 1A Isolation Valve
- (6) 1SX007, Essential Service Water Supply Valve to Common Component Cooling Heat Exchanger
- (7) 2SD002B, Steam Generator Blowdown Upper/Lower Isolation Valve
- (8) 2RC014C, Reactor Head Vent Isolation Valve
- (9) 1SI8801B, Charging to Cold Leg Injection Valve
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 23, 2020, the inspectors presented the design basis assurance inspection (programs) inspection results to Mr. J. Keenan, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.02 Calculations 10.2.117 Copes Vulcan Air Operated Control Valves Design Report 9
BRW-01-0153-E Environmental Parameters of EQ Zones 2
BRW-01-0153-E Environmental Parameters of EQ Zones 2
/BYR0l-068
BRW-95-059 Braidwood 1&2 CC System MOV Differential Pressure 1
Calculation
BRW-97-0821-M Safety Injection MOV Differential Pressure Calculation 0
BRW-98-0392-M Residual Heat Removal System (RHR) MOV Differential 0
Pressure Calculation
BRW-98-0596-E Generic Thermal Overload Heater Sizing Calculation for 12/05/1998
Motor Operated Valves
BRW-98-0718-E Motor Operated Valves (MOV) Actuator Motor Terminal 0
Voltage & Thermal Overload Sizing
Calculation - Component Cooling (CC) System
BRW-98-0721-E Motor Operated Valves (MOV) Actuator Motor Terminal 02/23/1999
Voltage and Thermal Overload Sizing Calculation-Residual
Heat Removal (RH) System
BRW-98-0723-E Motor Operated Valves Actuator Motor Terminal Voltage 0
and Thermal Overload Sizing Calculation
BRW-98-0724E Motor Operated Valve (MOV) Actuator Motor Terminal 0
Voltage and Thermal Overload Sizing Calculation-SX
System
CQD-012298 Review of Seismic Qualification Test Report for 1" Solenoid 0
Valves (1&2RC014A-F)
EMD-030608 Review of a Stress Analysis Report for a Valcor 1-inch 1
Solenoid Valve for Braidwood Station
ENC-QE-51.D Seismic Qualification Reevaluation of the Safety Injection 2
Motor Operated Valves
EQ-BB-027 Limitorque MOV Actuators Outside Containment 10
EQ-BB-047 Environmental Qualification of Borg Warner Valves 7
EQ-BB-084 Limitorque Motor Operators (RH Insulation) 6
EQ-GEN023 Environmental Qualification of Namco Control Limit Switch 15
Inspection Type Designation Description or Title Revision or
Procedure Date
Series
EQ-GEN023 Environmental Qualification of Namco Control Limit Switch 15A
Series
EQ-GEN040 Environmental Qualification of Valcor V526 Series Solenoid 7
Valves
EQDP-MECH Westinghouse - Environmental Qualification of Pumps and 11
Valves
F-2756 Main Steam Isolation Valves 1
Corrective Action 2479735 OSP-R Degraded Grease Conditions Noted in 1RH8701B 04/04/2015
Documents 2567440 OSP-A Valve Dual Indication When Open (2SD002D) 10/08/2015
4004530 OSP-P MLB 4 GRP3 12.2 2SD002F Status Light Not 04/30/2017
Working
4183361 OSP-R 2SI8801A Mechanical Grease Inspection Grade 3 10/14/2018
219454 Stem Adapter Replacement on 1SX005 02/12/2019
4304505 Leak off the 2SD002H Valve 12/17/2019
Corrective Action 4375109 NRC ID - POV Inspection W/D - 1SX005 10/07/2020
Documents 4378979 Braidwood DBAI Power Operated Valves - Observations 10/23/2020
Resulting from
Inspection
Drawings 2000003 Air Cylinder Assembly Spring Loaded Fail Closed 2 Inch C
Globe Valve
20E-1-4018A Relaying & Metering Diagram 4160V ESF Switchgear Bus X
141
20E-1-4019A Relaying & Metering Diagram 480V ESF Switchgear Bus K
131X
20E-1- Schematic Diagram CCW From Reactor Coolant Pumps N
4030CC04 Thermal Barrier Isolation Valves 1CC9438 & 1CC685
20E-1- Schematic Diagram Residual Heat Removal Heat 03/31/1978
4030EH06 Exchanger 1A & 1B Crosstie Valves 1RH8716A &
1RH8716B
20E-1- Schematic Diagram RC Loop 1A to RHR Pump Isolation Q
4030RH04 Valves 1RH8701A & RH88701B
20E-1-4030SI06 Schematic Diagram Boron Injection Tank Discharge L
Isolation Valves 1SI8801A & 1SI8801B
Inspection Type Designation Description or Title Revision or
Procedure Date
20E-1-4687D External Wiring Diagram 480V Auxiliary Building ESF MCC K
2X4 Section D
20E-1-4689A External Wiring Diagram 480V Auxiliary Building ESF MCC N
2X5 1AP32E
20E-1-4883 Internal-External Wiring Diagram Motor Operated Valves L
System SI
4030MS02 Schematic Diagram Main Steam Isolation Valve 1MS001B 06/16/1981
8376D49 4in - 1525lb Motor Operated Gate Valve 4-GM78FN 3
D-268832 Spec.# L-2700220 Model D-100-160 Actuator 3" Class 01/30/1984
1500 Valve Assembly
M-135 Diagram of Reactor Coolant Loop -1 Unit 2 BG
M-35 Diagram of Main Steam 07/19/1976
M-48 Diagram of Waste Disposal Steam Generator Blowdown AU
M-61 Diagram of Safety Injection AJ
M-62 Diagram of Residual Heat Removal 05/05/1976
Miscellaneous 1RH8701B Rising STEM Motor Operated Valve Datasheet (RSMDS) 4
EQ-BB-027 Valve Operator, Class RH Motors, Inside Containment 10
EQ-BB-084 Motor Operators (RH Insulation) 6
EQ-BB-104 Environmental Qualification of Limitorque Motor Operators 6
(LR Insulation)
F-2702 SO 386 F-2702 Shop Order 386 Construction F-2802.0386 PO 01/01/1960
Receipt Log 130631 Westinghouse Receipt Log Electrical System
L-0352 Instruction Manual for Main Steam Isolation Valves 05/01/1987
L-0785 Valcor - Operation and Maintenance Manual 1
MOV-DB-BRW- Component Cooling Water System 2
CC
Procedures 1BWEP ES1.3 Transfer to Cold Leg Recirculation Unit 1 301
2BWOA SEC-4 Loss of Instrument Air Unit 2 107
ER-AA-300 Motor-Operated Valve Program Administrative Procedure 12
ER-AA-300-1001 MOV Program Performance Indicators 14
ER-AA-302 Motor-Operated Valve Program Engineering Procedure 7
ER-AA-302-1001 MOV Rising Stem Motor Operated Valve Thrust and 11
Torque Sizing and Set-Up Window Determination
Inspection Type Designation Description or Title Revision or
Procedure Date
Methodology
ER-AA-302-1003 MOV Margin Analysis and Periodic Verification Test 10
Intervals
ER-AA-302-1004 Motor-Operated Valve Performance Trending 13
ER-AA-302-1006 Motor-Operated Valve Maintenance and Testing 19
Guidelines
ER-AA-321 Administrative Requirements for Inservice Testing 13
ER-AA-321-1006 Inservice Testing of Motor Operated Valves 4
ER-AA-410 Air Operated Valve Categorization 6
ER-AA-410-1000 Air Operated Valve Design Basis Review and Setpoint 2
Control
ER-AA-410-1002 Air Operated Valve Testing Requirements 3
ER-AA-410-1003 Air Operated Valve Tracking and Trending Requirements 3
ER-AA-410-1004 Air Operated Valve Program Performance Indicators 11
Work Orders 1061054 1RH8716A Perform Grease/Mech Inspection 08/15/2008
1098849 1SX007 Perform Grease/Mech Inspection 01
218481 Perform Grease Inspection on Gearcase & Gearbox 01
27459 1RH8716A MOV Age Related Inspection & T Drain Plug 01/26/2013
1369261 EQ Overhaul 09/26/2011
1381327 Replace 1B MSIV Actuator Hydraulic Air Filter, Air, Oil 09/04/2011
Pump
1395294 1RH8716A Lubricate Valve Stem 09/04/2011
22495 EQ Replacement of Air Operator Diaphragm 07/31/2012
20796 1SI8801B Motor Operated Valve Diagnostic Test 09/01/2013
21152 1RH8716A Motor Oprtd Vlv Diag Test 01/26/2013
21183 1TIS-PS120 Sec Cooling Loop Outlet Temp of Sec 02/09/2013
Analysis Sys
1657661 IST-STT-2RY455A/456 PORV Vlv Stroke 04/18/2014
1674294 1SI8801B ODEN Breaker 1AP32E Tripped OOT 09/05/2014
1739095 IST-PIT-2SD002A-GH Containment Isolation Valves 03/22/2016
Operability
1740805 IST-LT-2SD02B-H U2 LLRT of Lower S/G B/D 09/22/2015
22275 IST-SIT-1SI8801B/SI8802B/SI8809B/RH8716N-U1 Train B 07/03/2015
Inspection Type Designation Description or Title Revision or
Procedure Date
SI SVAG
23250 IST-1SI8801A/8802A/1RH8716A-SI Svag Vlv Stk Qtrly 09/16/2016
25073 IST-PIT-8801B-U1 Train B SI Isolation Valve Indication 10/10/2016
Test
26736 U1 Main Steam Isol 1MS001A/B/C/F Valve Indication 18 09/22/2016
MO
1837043 IST-1MS001A-D MSIV Full Stroke 09/19/2016
1838870 MVR-Degraded Grease Conditions Noted in 1RH8701B 10/22/2019
1873657 IST-PIT-2SD002A-H Containment Isolation Valves 08/23/2017
Operability
1880981 IST-STT-PIT 2RC014A Stroke Test 02/11/2016
1957684 U1 Train B Safety Injection System SVAG Valve Stroke 12/30/2016
1957951 1SI8801 Indication Test 03/29/2018
1959023 IST-1SI8801A/8802A/8809A/1RH8716A-SI Svag Vlv Stk 04/03/2018
Qtrly
1959319 IST-PIT-8701A/8701B/8716A-1A Rh Suct & Disch Xtie Vlvs 04/03/2018
1963132 IST-1MS001A-D MSIV Full Stroke 04/02/2018
1965829 IST-PIT-1MS001A/B/C/D CNMT Isolation Valve Indication 04/05/2018
4643566 IST_STT-PTT-2RC014A Stroke Test 09/09/2017
4774634 IST-1SI8801A/8802A/8809A/1RH8716A-Si Svag Valve 10/04/2019
Stroke Quarterly Su
4774638 U1 Train B Safety Injection System SVAG Valve Stroke 07/10/2018
4777315 1SI8801B Indication Test 09/01/2019
4851953 IST-STT-PIT 2RC014A Stroke Test 05/06/2020
4853291 IST-LT-2SO002B/D/F/H - U2 LLRT OF LOWER S/G B/O, 05/06/2020
W: 2BWOSR 5.5.8.SD-1B
4893081 IST-STT-2SD002A-H & 2SD005A-D -S/G B/D CNMT ISOL 06/20/2019
VALVES
506783 1SX007 Perform Insp and Prvny MNT on LMTTQ VLV 01
OPRTR
559424 1MS001B MMD 5YR EQ Overhaul 03/27/2006
559482 1SI8801 Motor Operated Valve Diagnostic Test 07/24/2004
559523 1RH8716A SRV for Age Related Degrd 03/16/2004
Inspection Type Designation Description or Title Revision or
Procedure Date
631306 Fab and Install Valve Assembly 03/17/2011
743303 1CC685 Tech Spec Therm O.L. Surv 1AP28E MCC 01
2X4, Cub D4
900411 1CC685 SRV for Age Rltd Degradation 01
918421 1SX007 Motor Oprtd VLV Diag Test 01
958396 Rebuild Actuator, Replace Elastomers and Solenoid Check 11/28/2007
Valves
970005436 1RH8716A Motor Oprtd Valve Diag Test 04/15/1997
98100280 1RH8716A Motor Oprtd Vlv Diag Test 05/07/2004
10