November 18, 2020
SUBJECT:
BRAIDWOOD GENERATING STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000456/2020012 AND 05000457/2020012
Dear Mr. Hanson:
On October 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Generating Station and discussed the results of this inspection with Mr. J. Keenan, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000456 and 05000457
License Numbers:
Report Numbers:
05000456/2020012 and 05000457/2020012
Enterprise Identifier: I-2020-012-0019
Licensee:
Exelon Generation Company, LLC
Facility:
Braidwood Generating Station
Location:
Braceville, IL
Inspection Dates:
October 05, 2020 to October 23, 2020
Inspectors:
J. Benjamin, Senior Reactor Inspector
I. Hafeez, Reactor Inspector
E. Sanchez Santiago, Senior Reactor Inspector
Approved By:
Karla K. Stoedter, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Braidwood Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. Regional based inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. For the inspection documented below portions of the IP were completed remotely as well as on site and all the objectives and requirements for completion of the IP were met.
REACTOR SAFETY
71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03)
The inspectors:
a.
Determined whether the sampled power operated valves (POVs) listed below are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.
b.
Determined whether the sampled POVs are capable of performing their design-basis functions.
c.
Determined whether testing of the sampled POVs is adequate to demonstrate the capability of the POVs to perform their safety functions under design-basis conditions.
d.
Evaluate maintenance activities including a walkdown of the sampled POVs (if accessible).
- (1) 2RY455A, Pressurizer Power Operated Relief Valve
- (2) 1MS001B, Steam Generator Main Steam Isolation Valve
- (3) 1RH8716A, Residual Heat Removal Pump Discharge Crosstie Isolation Valve
- (4) 1CC685, Component Cooling from Reactor Coolant Pumps Thermal Barrier Isolation Valve
- (5) 1RH8701B, Reactor Coolant Loop 1A to Residual Heat Removal Pump 1A Isolation Valve
- (6) 1SX007, Essential Service Water Supply Valve to Common Component Cooling Heat Exchanger
- (7) 2SD002B, Steam Generator Blowdown Upper/Lower Isolation Valve
- (8) 2RC014C, Reactor Head Vent Isolation Valve
- (9) 1SI8801B, Charging to Cold Leg Injection Valve
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 23, 2020, the inspectors presented the design basis assurance inspection (programs) inspection results to Mr. J. Keenan, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.02 Calculations
10.2.117
Copes Vulcan Air Operated Control Valves Design Report
BRW-01-0153-E
Environmental Parameters of EQ Zones
BRW-01-0153-E
/BYR0l-068
Environmental Parameters of EQ Zones
BRW-95-059
Braidwood 1&2 CC System MOV Differential Pressure
Calculation
BRW-97-0821-M
Safety Injection MOV Differential Pressure Calculation
BRW-98-0392-M
Residual Heat Removal System (RHR) MOV Differential
Pressure Calculation
BRW-98-0596-E
Generic Thermal Overload Heater Sizing Calculation for
Motor Operated Valves
2/05/1998
BRW-98-0718-E
Motor Operated Valves (MOV) Actuator Motor Terminal
Voltage & Thermal Overload Sizing
Calculation - Component Cooling (CC) System
BRW-98-0721-E
Motor Operated Valves (MOV) Actuator Motor Terminal
Voltage and Thermal Overload Sizing Calculation-Residual
Heat Removal (RH) System
2/23/1999
BRW-98-0723-E
Motor Operated Valves Actuator Motor Terminal Voltage
and Thermal Overload Sizing Calculation
BRW-98-0724E
Motor Operated Valve (MOV) Actuator Motor Terminal
Voltage and Thermal Overload Sizing Calculation-SX
System
CQD-012298
Review of Seismic Qualification Test Report for 1" Solenoid
Valves (1&2RC014A-F)
EMD-030608
Review of a Stress Analysis Report for a Valcor 1-inch
Solenoid Valve for Braidwood Station
ENC-QE-51.D
Seismic Qualification Reevaluation of the Safety Injection
Motor Operated Valves
EQ-BB-027
Limitorque MOV Actuators Outside Containment
EQ-BB-047
Environmental Qualification of Borg Warner Valves
EQ-BB-084
Limitorque Motor Operators (RH Insulation)
EQ-GEN023
Environmental Qualification of Namco Control Limit Switch
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Series
EQ-GEN023
Environmental Qualification of Namco Control Limit Switch
Series
15A
EQ-GEN040
Environmental Qualification of Valcor V526 Series Solenoid
Valves
EQDP-MECH
Westinghouse - Environmental Qualification of Pumps and
Valves
F-2756
Corrective Action
Documents
2479735
OSP-R Degraded Grease Conditions Noted in 1RH8701B
04/04/2015
2567440
OSP-A Valve Dual Indication When Open (2SD002D)
10/08/2015
4004530
OSP-P MLB 4 GRP3 12.2 2SD002F Status Light Not
Working
04/30/2017
4183361
OSP-R 2SI8801A Mechanical Grease Inspection Grade 3
10/14/2018
219454
Stem Adapter Replacement on 1SX005
2/12/2019
4304505
Leak off the 2SD002H Valve
2/17/2019
Corrective Action
Documents
Resulting from
Inspection
4375109
NRC ID - POV Inspection W/D - 1SX005
10/07/2020
4378979
Braidwood DBAI Power Operated Valves - Observations
10/23/2020
Drawings
2000003
Air Cylinder Assembly Spring Loaded Fail Closed 2 Inch
C
Relaying & Metering Diagram 4160V ESF Switchgear Bus
141
X
Relaying & Metering Diagram 480V ESF Switchgear Bus
131X
K
4030CC04
Schematic Diagram CCW From Reactor Coolant Pumps
Thermal Barrier Isolation Valves 1CC9438 & 1CC685
N
4030EH06
Schematic Diagram Residual Heat Removal Heat
Exchanger 1A & 1B Crosstie Valves 1RH8716A &
1RH8716B
03/31/1978
4030RH04
Schematic Diagram RC Loop 1A to RHR Pump Isolation
Valves 1RH8701A & RH88701B
Q
20E-1-4030SI06
Schematic Diagram Boron Injection Tank Discharge
Isolation Valves 1SI8801A & 1SI8801B
L
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
External Wiring Diagram 480V Auxiliary Building ESF MCC
2X4 Section D
K
External Wiring Diagram 480V Auxiliary Building ESF MCC
2X5 1AP32E
N
Internal-External Wiring Diagram Motor Operated Valves
System SI
L
4030MS02
Schematic Diagram Main Steam Isolation Valve 1MS001B
06/16/1981
8376D49
4in - 1525lb Motor Operated Gate Valve 4-GM78FN
D-268832
Spec.# L-2700220 Model D-100-160 Actuator 3" Class
1500 Valve Assembly
01/30/1984
M-135
Diagram of Reactor Coolant Loop -1 Unit 2
BG
M-35
Diagram of Main Steam
07/19/1976
M-48
Diagram of Waste Disposal Steam Generator Blowdown
M-61
Diagram of Safety Injection
AJ
M-62
Diagram of Residual Heat Removal
05/05/1976
Miscellaneous
1RH8701B
Rising STEM Motor Operated Valve Datasheet (RSMDS)
EQ-BB-027
Valve Operator, Class RH Motors, Inside Containment
EQ-BB-084
Motor Operators (RH Insulation)
EQ-BB-104
Environmental Qualification of Limitorque Motor Operators
(LR Insulation)
F-2702 SO 386
Receipt Log
F-2702 Shop Order 386 Construction F-2802.0386 PO
130631 Westinghouse Receipt Log Electrical System
01/01/1960
Instruction Manual for Main Steam Isolation Valves
05/01/1987
Valcor - Operation and Maintenance Manual
MOV-DB-BRW-
Component Cooling Water System
Procedures
1BWEP ES1.3
Transfer to Cold Leg Recirculation Unit 1
301
2BWOA SEC-4
Loss of Instrument Air Unit 2
107
Motor-Operated Valve Program Administrative Procedure
ER-AA-300-1001 MOV Program Performance Indicators
Motor-Operated Valve Program Engineering Procedure
ER-AA-302-1001 MOV Rising Stem Motor Operated Valve Thrust and
Torque Sizing and Set-Up Window Determination
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Methodology
ER-AA-302-1003 MOV Margin Analysis and Periodic Verification Test
Intervals
ER-AA-302-1004 Motor-Operated Valve Performance Trending
ER-AA-302-1006 Motor-Operated Valve Maintenance and Testing
Guidelines
Administrative Requirements for Inservice Testing
ER-AA-321-1006 Inservice Testing of Motor Operated Valves
Air Operated Valve Categorization
ER-AA-410-1000 Air Operated Valve Design Basis Review and Setpoint
Control
ER-AA-410-1002 Air Operated Valve Testing Requirements
ER-AA-410-1003 Air Operated Valve Tracking and Trending Requirements
ER-AA-410-1004 Air Operated Valve Program Performance Indicators
Work Orders
1061054
1RH8716A Perform Grease/Mech Inspection
08/15/2008
1098849
1SX007 Perform Grease/Mech Inspection
218481
Perform Grease Inspection on Gearcase & Gearbox
27459
1RH8716A MOV Age Related Inspection & T Drain Plug
01/26/2013
1369261
EQ Overhaul
09/26/2011
1381327
Replace 1B MSIV Actuator Hydraulic Air Filter, Air, Oil
Pump
09/04/2011
1395294
1RH8716A Lubricate Valve Stem
09/04/2011
22495
EQ Replacement of Air Operator Diaphragm
07/31/2012
20796
1SI8801B Motor Operated Valve Diagnostic Test
09/01/2013
21152
1RH8716A Motor Oprtd Vlv Diag Test
01/26/2013
21183
1TIS-PS120 Sec Cooling Loop Outlet Temp of Sec
Analysis Sys
2/09/2013
1657661
IST-STT-2RY455A/456 PORV Vlv Stroke
04/18/2014
1674294
1SI8801B ODEN Breaker 1AP32E Tripped OOT
09/05/2014
1739095
IST-PIT-2SD002A-GH Containment Isolation Valves
Operability
03/22/2016
1740805
IST-LT-2SD02B-H U2 LLRT of Lower S/G B/D
09/22/2015
22275
IST-SIT-1SI8801B/SI8802B/SI8809B/RH8716N-U1 Train B
07/03/2015
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SI SVAG
23250
IST-1SI8801A/8802A/1RH8716A-SI Svag Vlv Stk Qtrly
09/16/2016
25073
IST-PIT-8801B-U1 Train B SI Isolation Valve Indication
Test
10/10/2016
26736
U1 Main Steam Isol 1MS001A/B/C/F Valve Indication 18
MO
09/22/2016
1837043
IST-1MS001A-D MSIV Full Stroke
09/19/2016
1838870
MVR-Degraded Grease Conditions Noted in 1RH8701B
10/22/2019
1873657
IST-PIT-2SD002A-H Containment Isolation Valves
Operability
08/23/2017
1880981
IST-STT-PIT 2RC014A Stroke Test
2/11/2016
1957684
U1 Train B Safety Injection System SVAG Valve Stroke
2/30/2016
1957951
1SI8801 Indication Test
03/29/2018
1959023
IST-1SI8801A/8802A/8809A/1RH8716A-SI Svag Vlv Stk
Qtrly
04/03/2018
1959319
IST-PIT-8701A/8701B/8716A-1A Rh Suct & Disch Xtie Vlvs 04/03/2018
1963132
IST-1MS001A-D MSIV Full Stroke
04/02/2018
1965829
IST-PIT-1MS001A/B/C/D CNMT Isolation Valve Indication
04/05/2018
4643566
IST_STT-PTT-2RC014A Stroke Test
09/09/2017
4774634
IST-1SI8801A/8802A/8809A/1RH8716A-Si Svag Valve
Stroke Quarterly Su
10/04/2019
4774638
U1 Train B Safety Injection System SVAG Valve Stroke
07/10/2018
4777315
1SI8801B Indication Test
09/01/2019
4851953
IST-STT-PIT 2RC014A Stroke Test
05/06/2020
4853291
IST-LT-2SO002B/D/F/H - U2 LLRT OF LOWER S/G B/O,
W: 2BWOSR 5.5.8.SD-1B
05/06/2020
4893081
IST-STT-2SD002A-H & 2SD005A-D -S/G B/D CNMT ISOL
VALVES
06/20/2019
506783
1SX007 Perform Insp and Prvny MNT on LMTTQ VLV
OPRTR
559424
1MS001B MMD 5YR EQ Overhaul
03/27/2006
559482
1SI8801 Motor Operated Valve Diagnostic Test
07/24/2004
559523
1RH8716A SRV for Age Related Degrd
03/16/2004
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
631306
Fab and Install Valve Assembly
03/17/2011
743303
1CC685 Tech Spec Therm O.L. Surv 1AP28E MCC
2X4, Cub D4
900411
1CC685 SRV for Age Rltd Degradation
918421
1SX007 Motor Oprtd VLV Diag Test
958396
Rebuild Actuator, Replace Elastomers and Solenoid Check
Valves
11/28/2007
970005436
1RH8716A Motor Oprtd Valve Diag Test
04/15/1997
98100280
1RH8716A Motor Oprtd Vlv Diag Test
05/07/2004