NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9
ML23103A469
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/12/2023
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Seawright B
Constellation Energy Generation
References
Download: ML23103A469 (2)


Text

From: Joel Wiebe Sent: Wednesday, April 12, 2023 11:33 AM To: Seawright, Brian A:(Constellation Nuclear)

Subject:

NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 Hi Brian, By letter dated March 24, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23083B941), Constellation Energy Generation, LLC (Constellation) submitted a proposed license amendment to revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, "Ultimate Heat Sink," until September 30, 2023. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 2 months from the date of this acceptance, which is June 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel

Hearing Identifier: NRR_DRMA Email Number: 2038 Mail Envelope Properties (MN2PR09MB4971860E45E6FEE2791281AD8B9B9)

Subject:

NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 Sent Date: 4/12/2023 11:32:34 AM Received Date: 4/12/2023 11:32:00 AM From: Joel Wiebe Created By: Joel.Wiebe@nrc.gov Recipients: