IR 05000456/2020402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000456/2020402 and 05000457/2020402
ML20276A195
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/02/2020
From: Steven Orth
Plant Support Branch II
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020402
Download: ML20276A195 (8)


Text

October 2, 2020

SUBJECT:

BRAIDWOOD GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2020402 AND 05000457/2020402

Dear Mr. Hanson:

On August 25, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Generating Station and discussed the results of this inspection with Mr. J. Keenan, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000456 and 05000457

License Numbers:

NPF-72 and NPF-77

Report Numbers:

05000456/2020402 and 05000457/2020402

Enterprise Identifier: I-2020-402-0021

Licensee:

Exelon Generating Company, LLC

Facility:

Braidwood Generating Station

Location:

Braceville, IL

Inspection Dates:

June 22, 2020 to August 21, 2020

Inspectors:

J. Gilliam, Physical Security Inspector

J. Kutlesa, Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All
  • Tier II: 02.09(a); 02.11(a, b, d); 02.12
  • Tier III: 02.14; 02.15

71130.05 - Protective Strategy Evaluation

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 02.07(a, e)
  • Tier III: 02.09(a); 02.10(a); 02.11(a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision(s) 16 to 17 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 25, 2020, the inspectors presented the security baseline inspection results to Mr. J. Keenan, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Engineering

Changes

EC 630081

IVMS Dreambox Upgrade

Miscellaneous

Excel

Spreadsheet

Annual, Semi-Annual and Quarterly Maintenance Completion 08/13/2020

NRC Semi-

Annual Dates

Weapons Maintenance Records

08/12/2020

Procedures

SY-AA-101-122

Testing Security Equipment

SY-AA-101-122-

1001

Performance of Security Systems Tests

SY-AA-150-103

Firearms Maintenance, Testing, And Accountability

SY-BR-101-103

Braidwood Observation and Inspection of the Vehicle Barrier

System

SY-BR-101-122-

1001

Braidwood Security Equipment Testing

SY-BR-1015

Braidwood Armory Process and Equipment Inventory

Work Orders

04957850

Security Diesel Generator Periodic Surveillance (Loaded

Run)

03/25/2020

71130.05

Calculations

BRW-04-0061-S

Lake Screen House Evaluation

BRW-10-0122-S

Lake Screen House Calculation

09/28/2010

BRW-10-0163-S

Blast Effect Evaluation of Vital Structures for DBT Vehicle

Payloads

10/21/2010

Corrective Action

Documents

IR #s 4036129 -

4049808 Specific

Samples

Performance Evaluation Program Issue Reports

Various

Miscellaneous

LMS Reports

Learning Management System Reports for: Adversary

Training; Controller; PFT; Tactical Response Drill

Participation

Various

Procedures

SY-AA-101-102

Compensating for Security System Failures

SY-AA-101-106-

F-06

Conducting Patrols

SY-AA-101-132

Security Assessment and Response to Unusual Activity

SY-AA-101-133

Integrated Response Plan with Offsite Response Agencies

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-133-

F-01

Supporting Law Enforcement Agency Response Capability

06/07/2020

SY-AA-150

Nuclear Security Training Program

SY-AA-150-1006-

F-01

Personnel Timeline Worksheet

SY-AA-150-1007

Exelon Nuclear Security Adversary Force

SY-AA-150-102

Security Drills and Exercises

SY-BR-101-502

Braidwood Nuclear Generating Station Target Sets

71130.09

Miscellaneous

Braidwood Avert Baseline Modification Analysis for

Defensive Strategy optimization Project with Juliet

09/24/2019

Braidwood Avert Baseline Modification Analysis for

Defensive Strategy optimization Project without Juliet

11/19/2019

SY-AA-101-104-

F-01

Screening Evaluation for Revisions to the Physical Security

Plan

10/08/2019

SY-AA-101-104-

F-02

Procedure/T&RM revision Summary for: SY-BR-101-102-

1001 Security System Component Degradation

Compensatory Measures

SY-AA-101-104-

F-02

Procedure/T&RM revision Summary for: SY-BR-101-102-

1001 Full Compensatory Measures

Procedures

Physical Security

Plan

Braidwood Station Security Plan

SY-AA-101-109

Response to Contingency Events

SY-BR-101-501

Supplemental Security Contingency Plan

6