Line 37: Line 37:
We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf
We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf


In 2011, based on years of inspection results and assessment insights associated with the site-
In 2011, based on years of inspection results and assessment insights associated with the site- wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate.
wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate.


In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC
Line 45: Line 44:
Please contact me at 610-337-5069 with any questions you have regarding this letter.
Please contact me at 610-337-5069 with any questions you have regarding this letter.


Sincerely,/RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64  
Sincerely,
/RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64  


===Enclosure:===
Enclosure: Indian Point 2 & 3 Inspection / Activity Plan  
Indian Point 2 & 3 Inspection / Activity Plan  


ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl
ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl

Revision as of 23:22, 11 May 2019

Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-12-001 and 05000286-12-001)
ML13060A402
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2013
From: Burritt A L
Division Reactor Projects I
To: Ventosa J
Entergy Nuclear Operations
References
IR-12-001
Download: ML13060A402 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 March 4, 2013 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2012001 AND 05000286/2012001)

Dear Mr. Ventosa:

On February 13, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to the baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," and TI-182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to di scuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf

In 2011, based on years of inspection results and assessment insights associated with the site- wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64

Enclosure: Indian Point 2 & 3 Inspection / Activity Plan

ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl

(via email)

W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Layton, DRP C. Miller, DRS J. Clifford, DRS A. Burritt, DRP

B. Bickett, DRP S. McCarver, DRP S. Stewart, DRP, SRI, Unit 2 K. Dunham, DRP, RI, Units 2

P. Cataldo, DRP, SRI, Unit 3

A. Patel, DRP, RI, Unit 3 D. Hochmuth, DRP, AA J. Cassidy, RI OEDO DRS Branch Chiefs 6)

D. Screnci, PAO,

N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO RidsNrrPMIndianPoint Resource

RidsNrrDorlLpl1-1 Resource

ROPreport Resource ROPassessment Resource RidsNrrDirslpabResource