Line 37: |
Line 37: |
| We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf | | We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf |
|
| |
|
| In 2011, based on years of inspection results and assessment insights associated with the site- | | In 2011, based on years of inspection results and assessment insights associated with the site- wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate. |
| wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate. | |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC | | In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC |
Line 45: |
Line 44: |
| Please contact me at 610-337-5069 with any questions you have regarding this letter. | | Please contact me at 610-337-5069 with any questions you have regarding this letter. |
|
| |
|
| Sincerely,/RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64 | | Sincerely, |
| | /RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64 |
|
| |
|
| ===Enclosure:===
| | Enclosure: Indian Point 2 & 3 Inspection / Activity Plan |
| Indian Point 2 & 3 Inspection / Activity Plan | |
|
| |
|
| ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl | | ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl |
|
---|
Category:Inspection Plan
MONTHYEARML22347A2502022-12-21021 December 2022 Security Inspection Plan ML21208A2112021-07-27027 July 2021 Decommissioning Inspection Plan for Indian Point Generating Unit 3 - 2021 IR 05000286/20200062021-03-0303 March 2021 Annual Assessment Letter for Indian Point Energy Center, Unit 3 (Report 05000286/2020006) IR 05000286/20200052020-08-31031 August 2020 Updated Inspection Plan for Indian Point Energy Center, Unit 3 (Inspection Report 05000286/2020005) IR 05000247/20190062020-03-0303 March 2020 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2019006 and 05000286/2019006) IR 05000247/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000247/2019005 and 05000286/2019005) IR 05000247/20180062019-03-0404 March 2019 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Reports 05000247/2018006 and 05000286/2018006) IR 05000247/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) ML18240A1612018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) IR 05000247/20170062018-02-28028 February 2018 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2017006 and 05000286/2017006, Report 05000247/2017402 and 05000286/2017402, Report 05000247/2017501 and 05000286/2017501) IR 05000247/20170052017-08-28028 August 2017 Updated Inspection Plan for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2017005 and 05000286/2017005) IR 05000247/20160062017-03-0101 March 2017 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2016006 and 05000286/2016006) IR 05000247/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2016005 and 05000286/2016005) IR 05000247/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2015006 and 05000286/2015006) IR 05000247/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2015005 and 05000286/2015005) ML15061A4012015-03-0404 March 2015 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan) IR 05000247/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-14-006 and 05000286-14-006) IR 05000247/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2013001 and 05000286/2013001)(w/Inspection Plan) ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan IR 05000247/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-13-006 and 05000286-13-006) IR 05000247/20120012013-03-0404 March 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-12-001 and 05000286-12-001) ML12297A0062012-10-22022 October 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12244A3542012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Indian Point Nuclear Generating Units 2 and 3 IR 05000247/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000247/2011001 and 05000286/2011001) ML1124208362011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Indian Point Nuclear Generating Units 2 and 3 ML1106204642011-03-0404 March 2011 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Reports 05000247/2010001 and 05000286/2010001) ML1024402362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Indian Point Nuclear Generating Units 2 and 3 ML1006208632010-03-0303 March 2010 Annual Assessment Letter (Report 05000247-10-001 & 05000286-10-001) ML0924401932009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Stations Units 2 and 3, Dated 09/01/09 IR 05000247/20090012009-03-0404 March 2009 IR 05000247-09-001 and 05000286-09-001, on 02/10/2009, Indian Point Nuclear Generating Units 1 & 2, Annual Assessment Letter, Dated March 4, 2009 ML0824703162008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Indian Point, Units 2 and 3 ML0904105262008-06-0202 June 2008 Inspection Plan - Indian Point 2; Station Blackout Diesel Generator Modification & 50.59; IR No. 50-247-08-012 IR 05000247/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Indian Point Energy Center (05000247-08-001, 05000286-08-001) ML0734709592007-12-13013 December 2007 ROP8 - Indian Point 2 and 3 - Change to Inspection Plan, 12/13/07 ML0724309422007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0706106032007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Indian Point Station Units 2 & 3 (05-247/2007001 and 05-286/2007001) ML0708806212006-12-26026 December 2006 E-Mail from Mclaughlin to Alp@Nyserda.Org, NRC Reactor Inspection Schedule for 1Q07 ML0624306582006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0613805862006-05-18018 May 2006 Inspection/Activity Plan, 05/01/2006 - 09/30/2007 ML0621406102006-05-18018 May 2006 Inspection / Activity Plan 05/01/2006 - 09/30/2007 ML0606201072006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3 (Reports 05-247/2006001 & 05-286/2006001) ML0526400032005-09-20020 September 2005 Memo Special Inspection Charter - Indian Point, Unit No. 2 ML0524207132005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Indian Point 2 & 3 ML0506105932005-03-0202 March 2005 Annual Assessment Letter 2005001 - Indian Point 2 & 3 ML0424400842004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Indian Point 2 and 3 ML0406305552004-03-0303 March 2004 2003-04 Annual Assessment Letter - Indian Point IR 05000286/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Indian Point Nuclear Generating Unit 2 (Report 50-286/2003001) ML0224100642002-08-28028 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Unit 2 ML0223803962002-08-26026 August 2002 2002 Indian Point 3 Mid-Cycle Performance Review and Inspection Plan IR 05000247/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Indian Point 2 (Report 50-247/02-01) 2022-12-21
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 March 4, 2013 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2012001 AND 05000286/2012001)
Dear Mr. Ventosa:
On February 13, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Indian Point operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to the baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," and TI-182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to di scuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We have also scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include a review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf
In 2011, based on years of inspection results and assessment insights associated with the site- wide organization at Indian Point, the NRC determined that it was appropriate to modify the inspection program at Indian Point to more closely resemble other dual-unit sites. On January 1, 2012, the NRC implemented a modified inspection program that performed major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Effective January 1, 2013, the NRC modified the inspection requirements for the resident baseline inspection program. The modified inspection program has reduced inspection samples compared to previous years but main tains an increased NRC inspection effort, when compared to similar plants in the U.S. The NRC will accordingly change resident staffing from four to three permanent resident inspectors in the next several months. The three resident inspectors at Indian Point are necessary to complete the modified inspection program requirements. The NRC will periodically evaluate the implementation of the baseline inspection program at Indian Point and make adjustments as appropriate.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/ Arthur L. Burritt, Chief Projects Branch 2 Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64
Enclosure: Indian Point 2 & 3 Inspection / Activity Plan
ML13060A402 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME BBickett PCataldo/via email SStewart via email ABurritt DATE 02/25/13 02/25/13 02/26/13 03/04/13 Distribution w/encl
- (via email)
W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Layton, DRP C. Miller, DRS J. Clifford, DRS A. Burritt, DRP
B. Bickett, DRP S. McCarver, DRP S. Stewart, DRP, SRI, Unit 2 K. Dunham, DRP, RI, Units 2
P. Cataldo, DRP, SRI, Unit 3
A. Patel, DRP, RI, Unit 3 D. Hochmuth, DRP, AA J. Cassidy, RI OEDO DRS Branch Chiefs 6)
D. Screnci, PAO,
N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO RidsNrrPMIndianPoint Resource
RidsNrrDorlLpl1-1 Resource
ROPreport Resource ROPassessment Resource RidsNrrDirslpabResource