ML20065F276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ - _ . . _ _ _ . - . - -                        - _ _ _ _ _ _ _ . _ _ . _                    _ . - - _ . . _ . .._                                                    m            _.    ,
{{#Wiki_filter:}}
5  . l          <
JAMts P. O'llANLON -                                                                                                                ' innsbrook Technical Cente
] lb                                      . Vice President - Nuclear Operations                                                                                                  5000 Dominion Boulentd ,
Glen Allen, Virginia 2J060 806 273 2101
}
l l                                                                                                                                                                                                                :
h April 5, 1994 3
[                                        Mr. R. W. Crisp                                                                                        Serial No. F93-018 j                                        LRegional Director .                                                                                                                                                    !
;                                        Federal Energy Regulatory Commission                                                                                                                                  '
i 3125 Presidential Parkway, Suite 300 f                                        Atlanta,. Georgia 30340 i                                                                                                                                                                                                            'i
 
==Dear Mr. Crisp:==
 
[
4                                                                                                                                                                                                            -1 i
PROJECT NO. 6335-VA                                                                                                                            "
j                                        NORTH ANNA HYDROELECTRIC PROJECT
!-                                        TEN-YEAR SURVEY OF REFERENCE MONUMENTS AT MAIN DAM V
l                                        Currently, the survey between the North Anna main dam's reference monuments and the United States Coast and' Geological (USC&G) Survey monuments is.
]                                        performed once every ten years to verify the locations of the reference monuments.
: j.                                        We have determined that the survey.between the monuments does not provide j                                        significant information relative to settlement'or horizontal movement of.the dam.                                                                                  a  '
:                                        We have discussed this with Mr. J. C. Lyon, Jr. of your office.
!                                        The bases-for our determination are the stability ~of the main dam's reference
.                                        monuments and the relative distance between the main dam's monuments and I                                        those of the USC&G. The main dam's reference monuments are founded in rock                                                                                            ,
!                                        and therefore are inherently more stable than the USC&G Survey monuments which are founded in soil. - Additionally, the distance between the main dam's
:                                          reference monuments and the USC&G Survey monuments'used for horizontal j                                          measurements (4?r miles) can induce a relatively large degree of error compared to
                                        . the accuracy of the annual survey (between the main dam's reference monuments i-                                        and the dam's alignment settlement markers) an_d the Indicated movement over the
!                                          past twenty years. For vertical measurements, the distance between the USC&G monuments and the reference monuments (1!r miles)'also potentially induces a j                                          relatively large error compared to the results of the annual surveys of the alignment
;                                          settlement markers.
j'                                        Discussions with Mr. J; C. Lyon,.Jr. of your office indicated agreement that the
;                                          distances between the North Anna main dam's reference monuments and the i                                          USC&G _ Survey monuments could induce'slgnificant survey errors which might                                                                                          i
]~
tend to' mask any actual movement of the dam's alignment settlement markers.                                                                                          !
Therefore, we propose to discontinue these surveys. _ Relative movement of the
^
dam will continue to be monitored annually through the' performance of surveys between the hydroelectric project's reference monuments and the suivey blocks along the main dam.                                                                                                                                                  ,
                                                  ~
                                                                                          ~
                                  ^ M o'4110295 940405
!                                  'PDR        ADOCK 05ooo338
[                                    p                                        PDR                                                                                                          '          I s        ..
7
    ._                        _      -        ,                  ;__            . - - . _ , . . - - . . . ~ . _ . . _ . . . _ . . _ _ - _ . _ . . _ _ . ~ . _ _ _ - . - . . . - - _ .
 
jy::  ~                                                                                          ;
i=
l if 'you have any questions, please contact us.
1
!                Very truly yours,                                                              ,
0                  ~
J. P. O'Hanlon .                                                              .
1 cc:      United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Docket Nos. 50-338 and 50-339-Ucense Nos. NPF-4 and NPF-7 United States Nuclear Regulatory Commission                          ,
                          . Region II -                                                        ,
101 Marietta Street, N.W.                                            ;
                          - Suite 2900 -
Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector .
North Anna Power Station i
I
                                                                                            -}}

Revision as of 02:24, 31 March 2020

Proposes to Discontinue Survey Between North Anna Main Dam Ref Monuments & Us Coast & Geological Survey Monuments Performed Once Every 10 Yrs to Verify Locations of Ref Monuments
ML20065F276
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/05/1994
From: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Crisp R
FEDERAL ENERGY REGULATORY COMMISSION
References
F93-018, F93-18, NUDOCS 9404110295
Download: ML20065F276 (2)


Text