In our opinion IE Bulletin 79-01B is a major expansion beyond the intent of the original bulletin. We are evaluating our instrumentation in this light and estimate that this evaluation will be complete in six months.
In our opinion IE Bulletin 79-01B is a major expansion beyond the intent of the original bulletin. We are evaluating our instrumentation in this light and estimate that this evaluation will be complete in six months.
Sincerely, E. R. Math ws, Vice President Power Supply & Engineering snf Subscribed and Sworn to Before Me This 11_tb Day of    March            1980
Sincerely, E. R. Math ws, Vice President Power Supply & Engineering snf Subscribed and Sworn to Before Me This 11_tb Day of    March            1980
       @dd Notary Public, St(dte of Wisconsin                                MAR / 31sso
       @dd Notary Public, St(dte of Wisconsin                                MAR / 31sso My Comm!ssion Expiros se - 9/- RJ 8004100'105'.}}
                                                                        .    ;
My Comm!ssion Expiros se - 9/- RJ 8004100'105'.}}

Latest revision as of 20:43, 21 February 2020

Responds to IE Bulletin 79-01B.Consistent W/Intent of IE Circular 78-08,IE Bulletin 79-01 & 79-01A,review of Class IE Instrumentation Comparing Qualifications W/Design Specs or FSAR Requirements Shows Addl Requirements Were Met
ML19309D511
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/11/1980
From: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-01, IEB-79-01A, IEB-79-01B, IEB-79-1, IEB-79-1A, IEB-79-1B, NUDOCS 8004100405
Download: ML19309D511 (1)


Text

- ;

. m0 .

1 WISCONSIN PUBLIC S ERVICE CO R PO R ATIO N P.O. Box 1200, Green Bay, Wisconsin 54305 March 11, 1980 Mr. J. G. Keppler, Regional Director Of fice of Inspection and Enforcement Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Docket 50-305 Operating License DPR-43 IE Bulletin 79-01B, Et.vironmental Qualification of Class IE Equipment Consistent with the intent of IE Circular 78-08, and IE Bulletins 79-01 and 79-01 A, we have reviewed the qualifications of all Class IE instrumentation at the Kewaunee Plant, comparing their qualifications with their respective design specifications or the requirements specified in the Kewaunee FSAR, as applicable. Our review showed that in all cases, the original design specifi-cations or FSAR requirements were met. Our review was inspected and approved by representatives of your office. The applicable inspection reports are 50-305/78-20, 50-305/ 79-01 and 50-305/79-11.

In our opinion IE Bulletin 79-01B is a major expansion beyond the intent of the original bulletin. We are evaluating our instrumentation in this light and estimate that this evaluation will be complete in six months.

Sincerely, E. R. Math ws, Vice President Power Supply & Engineering snf Subscribed and Sworn to Before Me This 11_tb Day of March 1980

@dd Notary Public, St(dte of Wisconsin MAR / 31sso My Comm!ssion Expiros se - 9/- RJ 8004100'105'.