ML093020470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML093020470
| number = ML093020470
| issue date = 10/30/2009
| issue date = 10/30/2009
| title = Correction to Distribution of September 14, 2009, Letter - Request for Withholding Information from Public Disclosure (TAC Nos. MD5262, MD5263, and MD5264)
| title = Correction to Distribution of September 14, 2009, Letter - Request for Withholding Information from Public Disclosure
| author name = Brown E
| author name = Brown E
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2

Latest revision as of 22:54, 21 March 2020

Correction to Distribution of September 14, 2009, Letter - Request for Withholding Information from Public Disclosure
ML093020470
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/30/2009
From: Ellen Brown
Plant Licensing Branch II
To: Swafford P
Tennessee Valley Authority
Brown E, NRR/DORL, 415-2315
References
TAC MD5262, TAC MD5263, TAC MD5264
Download: ML093020470 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 30, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - CORRECTION TO DISTRIBUTION OF SEPTEMBER 14, 2009, LEITER - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MD5262, MD5263, AND MD5264)

Dear Mr. Swafford:

As result of an administrative oversight, some recipients of the letter dated September 14, 2009, to you from Ms. Eva Brown did not receive page 2 of the letter (Agencywide Documents Access and Management System No. ML092430207). To ensure that all recipients receive the complete letter, we are including it as an enclosure.

We apologize for any inconvenience this may have caused.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

As stated cc w/encl: Milton E. Teske and Barbara A. Agans Continuum Dynamics, Inc.

34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via Listserv

ENCLOSURE BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 14, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BROWNS FERRY NUCLEAR PLANT (TAC NOS. MD5262, MD5263, AND MD5264)

Dear Mr. Swafford:

By letters dated September 2 and December 8, 2008, January 16, January 23, and February 18, 2009, the Tennessee Valley Authority (TVA) submitted affidavits dated August 29 and December 2, 2008, January 15, January 22, and February 5, 2009, respectively, executed on behalf of Continuum Dynamics, Incorporated (COl), requesting that information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:

Enclosure 1 to a letter dated September 2,2008 - Response to Round 19 Request for Additional Information (RAI);

Enclosure 1 to a letter dated December 8, 2008 - COl Report No. 07-11 P, Dynamics of BWR Steam Dryer Components; Enclosure 1 to a letter dated January 16, 2009 - Response to Round 23 Request for Additional Information (RAI) Regarding Steam Dryer Analysis Submodeling; Enclosure 1 to a letter dated January 23, 2009 - Response to Round 23 Request for Additional Information (RAI) EMCB.203/164 Regarding Steam Dryer Signal Processing; Enclosure 1 to a letter dated February 18, 2009 - Response to Round 23 Request for Additional Information (RAI) EMCB.204/168 Regarding Steam Dryer Analyses;

P. Swafford -2 Non-proprietary copies of these documents have been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

Affidavits dated August 29, 2008, and January 15, January 22 and February 5, 2009, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by COl's competitors without license from COl constitutes a competitive economic advantage over other companies.

(b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

(c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

The affidavit dated December 2, 2008, stated that the submitted information should be considered exempt from mandatory public disclosure for reasons (a) and (b) above.

We have reviewed your applications and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination

P. Swafford -3 adverse to the above, you will be notified in advance of any pUblic disclosure. If you have any questions regarding this matter, I may be reached at 301-415-2315.

Sincerely, Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 cc: Milton E. Teske and Barbara A. Agans Continuum Dynamics, Inc.

34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via Listserv

October 30, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - CORRECTION TO DISTRIBUTION OF SEPTEMBER 14, 2009, LETrER - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MD5262, MD5263, AND MD5264)

Dear Mr. Swafford:

As result of an administrative oversight, some recipients of the letter dated September 14, 2009, to you from Ms. Eva Brown did not receive page 2 of the letter (Agencywide Documents Access and Management System No. ML092430207). To ensure that all recipients receive the complete letter, we are including it as an enclosure.

We apologize for any inconvenience this may have caused.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

As stated cc w/encl: Milton E. Teske and Barbara A. Agans Continuum Dynamics, Inc.

34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via Listserv NRC Distribution: See next page ADAMS Accession Number' ML093020470 NRR-084 OFFICE LPL2-2/PM LPL2-2/LA LPL-2-2/BC NAME EBrown BClayton TBoyce DATE 10/29/09 10/29/09 10/30109 OFFICIAL RECORD COP