Letter Sequence Withholding Request Acceptance |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 11 01 Market Street, LP 3R-C Chattanooga, TN 37402-2801 May 16, 2016
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NOS. MF6741, MF6742, AND MF6743)
Dear Mr. Shea:
By letter dated September 21, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15282A154), Tennessee Valley Authority (the licensee) submitted affidavits dated March 12, March 25, May 5, August 11, August 11, August 12, August 12, August12, August 19, August 19,August 19,August 19,August20,August20,and October 9, 2015, to the U.S. Nuclear Regulatory Commission (NRG), executed by Mr. Alan B. Meginnis, Manager, AREVA, Inc. (AREVA), requesting that the information contained in the following proprietary documents (Attachments 30, 32, 28, 16, 18, 34, 26, 24, 10, 12, 14, 8, 20, 37, and 22, respectively of the letter dated September 21, 2015) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR),
Part 2, Section 2.390:
- 1. ANP-3327P, Revision 1, "Evaluation of AREVA Fuel Thermal-hydraulic Performance for Browns Ferry at EPU [Extended Power Uprate]," March 2015 (Attachment 30 of the LAR [license amendment request]).
- 2. FS1-0019629, Revision 1, "Browns Ferry Unit 3 Cycle 19 MCPR [Minimum Critical Power Ratio] Safety Limit Analysis With SAFLIM3D Methodology," March 2015 (Attachment 32 of the LAR).
- 3. ANP-3388P, Revision 0, "Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate," May 2015 (Attachment 28 of the LAR).
- 4. ANP-3342P, Revision 1, "Browns Ferry EPU (120% OLTP [Original Licensed Thermal Power]) Equilibrium Fuel Cycle Design," August 2015 (Attachment 16 of the LAR).
- 5. ANP-3372P, Revision 1, "Browns Ferry Unit 3 Cycle 19 EPU (120% OL TP) LAR Reference Fuel Cycle Design," August 2015 (Attachment 18 of the LAR).
- 6. ANP-2860P, Revision 2, Supplement 2P Revision 1, "Browns Ferry Unit 1 -
Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 10XM Fuel for Extended Power Uprate," August 2015 (Attachment 34 of the LAR).
- 7. ANP-3385P, Revision 1, "Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report," August 2015 (Attachment 26 of the LAR).
- 8. ANP-3386P, Revision 1, "Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM 1 OXM Fuel Assemblies, Licensing Report," August 2015 (Attachment 24 of the LAR).
J.Shea 9. ANP-3377P, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA [Loss-of-Coolant Accident] Break Spectrum Analysis for ATRIUM-10XM Fuel (EPU)," August 2015 (Attachment 1 O of the LAA).
- 10. ANP-3378P, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS
[Emergency Core Cooling system] Analysis MAPLHGR [Maximum Average Planar Linear Heat Generation Rate] Limits for ATRIUM 10XM Fuel (EPU),"
August 2015 (Attachment 12 of the LAA).
- 11. ANP-3384P, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU)," August 2015 (Attachment 14 of the LAA).
- 12. ANP-3403P, Revision 2, "Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3," August 2015 (Attachment 8 of the LAA).
- 13. ANP-3404P, Revision 2, "Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate," August 2015 (Attachment 20 of the LAA).
- 14. ANP-3409P, Revision 2, "Fuel-Related Emergent Regulatory Issues,"
August 2015 (Attachment 37 of the LAA).
- 15. ANP-3343P, Revision 0, "Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel," October 2014 (Attachment 22 of the LAA).
Nonproprietary copies of the following documents (Attachments 31, 33, 29, 17, 19, 35, 27, 25, 11, 13, 15, 9, 21, 38, and 23, respectively of the letter dated September 21, 2015) have been placed in the NRC's Public Document Room and added to the NRC Library in the ADAMS.
- 1. ANP-3327NP, Revision 1, "Evaluation of AREVA Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU," March 2015 (non-proprietary)
(Attachment 31 of the LAA) (ADAMS Accession No. ML15282A221 ).
- 2. FS1-0019630, Revision 1, "Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis With SAFLIM3D Methodology," March 2015 (non-proprietary)
(Attachment 33 of the LAA) (ADAMS Accession No. ML15282A222).
- 3. ANP-3388NP, Revision 0, "Fuel Rod Thermal-Mechanical Evaluation for Browns Ferry Extended Power Uprate," May 2015 (non-proprietary) (Attachment 29 of the LAA) (ADAMS Accession No. ML15282A194).
- 4. ANP-3342NP, Revision 1, "Browns Ferry EPU (120% OL TP) Equilibrium Fuel Cycle Design," August 2015 (non-proprietary) (Attachment 17 of the LAA)
(ADAMS Accession No. ML15282A188).
- 5. ANP-3372NP, Revision 1, "Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP)
LAA Reference Fuel Cycle Design," August 2015 (non-proprietary)
(Attachment 19 of the LAA) (ADAMS Accession No. ML15282A189).
- 6. ANP-2860NP, Revision 2, Supplement 2NP Revision 1, "Browns Ferry Unit 1 -
Summary of Responses to Request for Additional Information, Extension for Use of ATRIUM 1 OXM Fuel for Extended Power Uprate," August 2015 (non-proprietary) (Attachment 35 of the LAA) (ADAMS Accession No. ML15282A223).
- 7. ANP-3385NP, Revision 1, "Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report," August 2015 (non-proprietary) (Attachment 27 of the LAA) (ADAMS Accession No. ML15282A193).
J.Shea 8. ANP-3386NP, Revision 1, "Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM 10XM Fuel Assemblies, Licensing Report," August 2015 (non-proprietary) (Attachment 25 of the LAR)
(ADAMS Accession No. ML15282A192).
- 9. ANP-3377NP, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA Break Spectrum Analysis for ATRIUM-10XM Fuel (EPU)," August 2015 (non-proprietary) (Attachment 11 of the LAR) (ADAMS Accession No. ML15282A184).
- 10. ANP-3378NP, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel (EPU)," August 2015 (non-proprietary)
(Attachment 13 of the LAR) (ADAMS Accession No. ML15282A185).
- 11. ANP-3384NP, Revision 3, "Browns Ferry Units 1, 2, and 3 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (EPU)," August 2015 (non-proprietary)
(Attachment 15 of the LAR) (ADAMS Accession No. ML15282A187).
- 12. ANP-3403NP, Revision 2, "Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3," August 2015 (non-proprietary) (Attachment 9 of the LAR)
(ADAMS Accession No. ML15282A182).
- 13. ANP-3404NP, Revision 2, "Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate," August 2015 (non-proprietary)
(Attachment 21 of the LAR) (ADAMS Accession No. ML15282A190).
- 14. ANP-3409NP, Revision 2, "Fuel-Related Emergent Regulatory Issues,"
August 2015 (non-proprietary) (Attachment 38 of the LAR) (ADAMS Accession No. ML15282A225).
- 15. ANP-3343NP, Revision 0, "Nuclear Fuel Design Report Browns Ferry EPU (120% OLTP) Equilibrium Cycle ATRIUM 10XM Fuel," October2014 (non-proprietary) (Attachment 23 of the LAR) (ADAMS Accession No. ML15282A191 ).
The AREVA affidavits dated March 12, March 25, May 5, August 11, August 11, August 12, August 12, August 12, August 19, August 19, August 19, August 19, August 20, August 20, and October 9, 2015, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(b)
Use of the Information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
(d)
The Information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
(e)
The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the
J.Shea submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296 cc: Mr. Alan 8. Meginnis Manager, Product Licensing AREVA NP Inc.
3315 Old Forest Road Lynchburg, VA 24501 Additional Distribution via Listserv Sincerely,
~
(f. ~
-f.:i Farideh E. Saba, Senior Project Manager Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML16123A335 OFFICE NRR/DORL/LPL4-1/PM NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME Sling am FSaba (Slingam for)
BClayton DATE 5/16/2016 5/16/2016 5/12/2016 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME BBeasley FSaba (Slingam for)
DATE 5/16/2016 5/16/2016