Letter Sequence Withholding Request Acceptance |
---|
EPID:L-2018-LLA-0048, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information (Open) |
|
MONTHYEARCNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 Project stage: Supplement ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant Project stage: Meeting CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results Project stage: Supplement ML18268A0212018-09-27027 September 2018 Regulatory Audit Plan in Support of Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Other ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary Project stage: RAI ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) Project stage: RAI CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 42018-12-13013 December 2018 Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4 Project stage: Supplement CNL-18-139, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information2018-12-14014 December 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information Project stage: Request CNL-19-011, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results2019-01-16016 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results Project stage: Supplement CNL-19-007, Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus2019-01-16016 January 2019 Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information2019-01-25025 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information Project stage: Supplement ML19067A0262019-03-0707 March 2019 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) and General Electric-Hitachi (Geh), Regarding Maximum Extended Load Line Limit Analysis Plus (Mella+) License Amendment Request (LAR) for Browns Ferry Nuclear Plant, Project stage: Meeting CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information2019-03-13013 March 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information Project stage: Supplement CNL-19-045, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ...2019-04-24024 April 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 9, Additional Information Regarding Anticipate Transient Without Scram with ... Project stage: Supplement ML19121A2242019-06-0606 June 2019 Non-Proprietary - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Summary Report for the Audits in Support of License Amendment Request for Operation in the Expand Maximum Extended Load Line Limit Analysis Plus Operating Domain Project stage: Other ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus Project stage: Meeting ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure Project stage: RAI ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19135A5572019-08-26026 August 2019 Request for Withholding Information from Public Disclosure (EPID L-2018-LLA-00488) Project stage: Withholding Request Acceptance ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition Project stage: Supplement 2019-01-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:Proprietary Information Review
MONTHYEARML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML23045A1192023-02-15015 February 2023 Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 ML23009B7502023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML23010A0932023-02-13013 February 2023 Request for Withholding Information from Public Disclosure for Supplement 7 to Browns Ferry License Amendment Request Transition to Atrium 11 Fuel ML22297A2352023-01-10010 January 2023 Request for Withholding Information from Public Disclosure Regarding Use of Atrium 11 Fuel ML22276A1012022-10-25025 October 2022 Request for Withholding Information from Public Disclosure for Supplement 4 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22276A1002022-10-0404 October 2022 Request for Withholding Information from Public Disclosure for Supplement 3 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22157A3272022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22154A1292022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22125A2632022-06-0101 June 2022 Request for Withholding Information from Public Disclosure for Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure ML19008A1752019-01-15015 January 2019 Request for Withholding Information from Public Disclosure ML16305A2142016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC Nos. MF6741, MF6742, MF6743) ML16292A7222016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16270A3662016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - EPU LAR GE-Hitachi Proprietary Approval Letter (CAC Nos. MF6741, MF6742, and MF6743) ML16224A1202016-09-26026 September 2016 Browns Ferry Nuclear Plant Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC. Nos. MF6741, MF6742, And MF6743) ML16209A3992016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16211A4352016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16217A4432016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16144A2982016-07-0707 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741 and MF6742, and MF6743) ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure ML16124B0062016-05-19019 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16123A3352016-05-16016 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124B1062016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16120A0722016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16027A1612016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML16027A2312016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML15345A0102015-12-22022 December 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15289A5392015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15289A5822015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Plant, Unit 3 ML15281A1682015-11-0505 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15170A3162015-09-0404 September 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15044A4802015-03-16016 March 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15006A3602015-01-26026 January 2015 Request for Withholding of Proprietary Information from Public Disclosure ML14352A2872015-01-0808 January 2015 Request for Withholding Information from Public Disclosure Regarding Tennessee Valley Authority Compensatory Measures That Revise the Pressure and Temperature Limits Curves ML14099A1032014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Tennessee Valley Authority Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Technical Specifications 2.1.1.2 in Support. ML14099A0842014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Response to Request for Additional Information on Technical Specification Change TS-478 2024-06-05
[Table view] |
Text
August 5, 2019 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority Browns Ferry Nuclear Plant 1101 Market Street, LP 4A Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2018-LLA-0048)
Dear Mr. Shea:
By letter to the U.S. Nuclear Regulatory Commission (NRC), dated April 24, 2019 (Agencywide Documents Access and Management System Accession No. ML19115A099), Tennessee Valley Authority (TVA) submitted an affidavit dated April 10, 2019, executed by Ms. Lisa K. Schichlein, Senior Project Manager, NPP/Services Licensing, Regulatory Affairs, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document (Enclosure 1 of the letter dated April 24, 2019) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
GEH letter DOC-0007-4283-140, GEH Response to MELLLA+
RAI SRXB-RAI-3A, dated April 12, 2019.
A nonproprietary copy of this document is provided in Enclosure 2 of the TVA letter dated April 24, 2019.
The GEH affidavit dated April 10, 2019, stated that the submitted document contains proprietary information that should be considered exempt from mandatory public disclosure of 10 CFR 2.390(b)(4) requirements for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEHs competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
J. Shea We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, based on the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov.
Sincerely,
/RA/
Farideh E. Saba, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 cc: Ms. Lisa K. Schichlein Senior Project Manager NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Listserv
ML19163A165 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LAiT NRR/DORL/LPL2-2/LA NRR/DSS/SNPB/BC NAME FSaba KEntz BClayton (JBurkhardt for) RLukes DATE 06/24/19 06/20/19 06/24/19 07/24/19 OFFICE NRR/DSS/SRXB/BC(A) NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME JBorromeo UShoop FSaba DATE 07/19/19 08/02/19 08/05/19