Letter Sequence Approval |
|---|
|
|
MONTHYEARCNL-21-053, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)2021-07-23023 July 2021 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535) Project stage: Request ML21252A0102021-08-30030 August 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Acceptance of License Amendment Request to Transition to ATRIUM-11 Fuel Project stage: Acceptance Review PMNS20220206, Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request2022-03-0707 March 2022 Meeting with Tennessee Valley Authority Regarding Framatome Advanced Methodologies for the Browns Ferry Atrium 11 Fuel Transition License Amendment Request Project stage: Meeting ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 Project stage: Meeting CNL-22-044, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-04-0808 April 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) Project stage: Request CNL-22-057, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use Project stage: Request ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel Project stage: RAI ML22154A4042022-06-0303 June 2022 Unit 3 Cycle 20 Mellla+ Eigenvalue Tracking Data Project stage: Request ML21347A0192022-06-0606 June 2022 Request for Withholding Information from Public Disclosure Regarding Confirmatory Calculations Project stage: Withholding Request Acceptance ML22157A3272022-06-13013 June 2022 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML22154A1292022-06-13013 June 2022 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information Project stage: Supplement CNL-22-076, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel2022-07-28028 July 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Project stage: Request CNL-22-083, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). Project stage: Request CNL-22-096, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-09-29029 September 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) Project stage: Request ML22276A1002022-10-0404 October 2022 Request for Withholding Information from Public Disclosure for Supplement 3 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel Project stage: Withholding Request Acceptance ML22276A1012022-10-25025 October 2022 Request for Withholding Information from Public Disclosure for Supplement 4 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel Project stage: Withholding Request Acceptance CNL-22-100, To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 To Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) Project stage: Request ML22297A2352023-01-10010 January 2023 Request for Withholding Information from Public Disclosure Regarding Use of Atrium 11 Fuel Project stage: Withholding Request Acceptance ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary Project stage: Approval ML23026A3182023-01-30030 January 2023 Correction of Safety Evaluation for Amendment Nos. 325, 348, and 308, Application of Advanced Framatome Methodologies, and Adoption of TSTF-564-A, Revision 2 (EPID L-2021-LLA-0132) (Letter) Project stage: Approval ML23010A0932023-02-13013 February 2023 Request for Withholding Information from Public Disclosure for Supplement 7 to Browns Ferry License Amendment Request Transition to Atrium 11 Fuel Project stage: Withholding Request Acceptance ML23045A1192023-02-15015 February 2023 Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 Project stage: Approval ML23009B7502023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel Project stage: Withholding Request Acceptance ML23046A2632023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry LAR to Transition to Atrium 11 Fuel Project stage: Request 2022-06-03
[Table View] |
Text
N° FS1-0060561 Rev. 1.0 Browns Ferry Unit 2 Cycle 23 Safety Limit Analysis (Non-Proprietary)
Handling: NONE Page 6/15 for the assemblies experiencing fluence gradients outside the bounds of the measurement database was augmented with the same approach as demonstrated in the Response to SNPB RAI-6 in Reference 7.
The ACE/ATRIUM 11 critical power correlation (Reference 8) is used for the ATRIUM 11 fuel assemblies and the ACE/ATRIUM 10XM critical power correlation (Reference 9) is used for the ATRIUM 10XM fuel assemblies. The fuel-and plant-related uncertainties used in the BFE2-23 SLMCPR analysis are presented in Table 1. The radial and nodal power uncertainties used in the analysis include the effects of up to 50 % of the local power range monitors (LPRM) out-of-service, up to 18 traveling in-core probe (TIP) channels out-of-service, and a 2,500 effective full power hour (EFPH) LPRM calibration interval.
[
]
Both the ACE/ATRIUM 11 (Reference 8) and the ACE/ATRIUM 10XM (Reference 9) critical power correlations have an SER restriction limiting the local peaking factor to [
] Fuel expected to be resident in BFE2-23 has been designed to be below this limit. The maximum local peaking factor for the fresh ATRIUM 11 lattice is [
] During each Monte Carlo trial of the SLMCPR calculation, all fuel rods in each assembly are evaluated using perturbed input parameters and the appropriate critical power correlation to determine the number of rods predicted to be in boiling transition. Key input parameters perturbed include nodal power, [
] and assembly flow, etc. [
] The base additive constant uncertainty