Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0631104352006-11-0707 November 2006 Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Project stage: Request 05000260/LER-2007-001, Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test2007-03-0202 March 2007 Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test Project stage: Request ML0711300782007-04-18018 April 2007 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI) Project stage: Supplement ML0711503662007-04-24024 April 2007 Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions Project stage: Request ML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting 05000259/LER-2007-005, Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank2007-08-0808 August 2007 Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank Project stage: Request ML0723602572007-08-21021 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Limit Curves Project stage: Request ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request 05000296/LER-2007-003, Leak in an ASME Class I Code Reactor Pressure Boundary Pipe2007-11-21021 November 2007 Leak in an ASME Class I Code Reactor Pressure Boundary Pipe Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0804304462008-02-11011 February 2008 Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures Project stage: Request ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0805001712008-05-0202 May 2008 Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other 2007-07-05
[Table View] |
Text
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EXTENDED POWER UPRATE CREDIT FOR CONTAINMENT OVERPRESSURE Rockville, Maryland July 18, 2007 1
COP CREDIT
o Currently 1 PSI for Core Spray long-term (> 10 Min.)
Credit for Containment overpressure requested for the first time for Unit 1
J.D. Wolcott
COP EVENTS
" LOCA short term <10 Min 4 Core Spray pumps at system flow 2 RHR pumps at design LPCI flow 2 RHR pumps to broken loop Debris loading on strainers Strainers/suction header is common RHR and Core Spray pumps need COP LOCA long term >10 Min Minimum required ECCS 2 Core Spray pumps at design flow 2 RHR pumps at containment cooling flow Debris loading on strainers BFN approval not dependent on generic approval of LTR Core Spray pumps need COP J. D. Wolcott 3
COP EVENTS Special Events Not addressed by RG 1.82 Appendix R 1 RHR pump injecting to vessel No strainer debris RHR pump needs COP ATWS 4 RHR pumps at containment cooling flow No strainer debris RHR pumps need COP Station Blackout HPCI suction from CST for 4 Hr coping duration 2 RHR pumps at containment cooling flow after 4 Hrs.
No strainer debris RHR pumps need COP J. D. Wolcott 4
RISK EVALUATIONS Regulatory Guide 1.174 risk informed evaluation for LOCA Incorporates insights from Vermont Yankee ACRS Probability Distribution for Realistic Parameters
- Suppression pool temperature o Suppression pool level o Heat exchanger K value o Ultimate heat sink temperature o RHR single failures LOCA, ATWS and SBO o ACDF 2.4E-8/yr o ALERF 2.4E-8/yr PSA MODELS DO NOT INCLUDE FIRE EVENTS o Qualitative risk assessment 5
J. D. Wolcott
UNIT 1 105% ACRS ACRS LETTER 2/16/07 Agreed with COP for all but APPENDIX R event Although the thermal-hydraulic evaluations for this scenario are intended to be realistic, the licensee argues that this is an overly conservative scenario, because more equipment is likely to be available than postulated in the scenario. If two or more RHR pumps are available, credit for containment overpressure is not needed.
Because of the plant configuration, the extent of modification required, and the worker dose that would be involved, we conclude that there are no practical design modifications that would preclude the need to consider the request for containment overpressure credit for most of the scenarios. However, for the Appendix R scenario, protecting a second RHR pump would eliminate the need for the credit and may be a feasible alternative.
Because of the amount of time for which credit is required and the amount of credit required, the Appendix R fire scenario is the limiting event for which containment overpressure credit is required. The staff presented a risk evaluation of containment overpressure credit for this scenario that showed that the contribution to core damage frequency associated with this scenario is small and represents a small fraction of the BFN1 core damage frequency.
However, this assessment did not include fires initiated by external events, such as earthquakes and tornados. The inclusion of these initiators in the risk evaluation is likely to increase the risk associated with the Appendix R scenario. To use risk arguments to justify overpressure credit for this scenario, the licensee and the staff need to provide a more complete analysis including all initiators. Because of the smaller amount of credit required for operation at 105-percent power, this extensive analysis is not needed to support operation at that power level.
6 J. D. Wolcott
APPENDIX R 240-30 Suppression Po Temperature P0
-25 200-
~.180 C
20 RHR Purmp Containment E
160 -
Pressure Required I-0.
140-
- 15 Atmospheric Pressure 120-10 10 10 0
10 20 30 40 50 60 Time (hours) 7
RAI 13
- 10 QUESTIONS Discussion Clarification 8