Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0631104352006-11-0707 November 2006 Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Project stage: Request 05000260/LER-2007-001, Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test2007-03-0202 March 2007 Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test Project stage: Request ML0711300782007-04-18018 April 2007 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI) Project stage: Supplement ML0711503662007-04-24024 April 2007 Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions Project stage: Request ML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting 05000259/LER-2007-005, Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank2007-08-0808 August 2007 Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank Project stage: Request ML0723602572007-08-21021 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Limit Curves Project stage: Request ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request 05000296/LER-2007-003, Leak in an ASME Class I Code Reactor Pressure Boundary Pipe2007-11-21021 November 2007 Leak in an ASME Class I Code Reactor Pressure Boundary Pipe Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0804304462008-02-11011 February 2008 Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures Project stage: Request ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0805001712008-05-0202 May 2008 Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other 2007-07-05
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB~IECT:
BROWNS FERRY NUCLEAR PLANT, UNIT 1, REQUEST FOR ADDITIONAL INFORMATION FOR EXTENDED POWER UPRATE - ROUND 25 (TAC NO. MD5262) (TS-431)
Dear Mr. Swafford:
By letter dated June 28,2004, the Tennessee Valley Authority (TVA, the licensee) submitted an amendment request for Browns Ferry Nuclear Plant (BFN), Unit 1, as supplemented by letters dated August 23, 2004, February 23, April 25, June 6, December 19, 2005, February 1 and 28, March 7, 9, 23, and 31, April 13, May 5, 15, and 16, June 15, 23, and 27, July 6, 21, 26, and 31, August 4, 16, 18, and 31, September 1, 15, and 22, October 3, 5, and 13, November 7, December 1,5,11, and 21,2006, January 31, February 16 and 26, April 6, 18, and 24, July 27, September 24, November 15 and 21, December 14,2007, January 25 and 31, February 11 and 21, March 6, April 4 and 9, May 1, June 3, 12, and 16, August 15, September 2 and 19, October 3,17, and 31, November 11 and 14, December 15, 2008, January 9, 16, and 23, February 18 and 24, March 11, 12, and 27, April 3, 10, 21, and 29, and May 7 and 29, 2009.
The proposed amendment would change the BFN operating license for Unit 1 to increase the maximum authorized power level by approximately 15 percent.
A response to the enclosed Request for Additional Information (RAI) is needed before the Nuclear Regulatory Commission staff can complete the review. This request was discussed with Mr. Denzel Housely of your staff on July 1,2009, and it was agreed that TVA would respond within 30 days of issuance of this letter.
P. Swafford
-2 If you have any questions, please contact me at (301) 415-2315.
Sincerely IRA!
Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
RAI cc w/enclosure: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION EXTENDED POWER UPRATE ROUND 25 TENNESSEE VALLEY AUTHORITY (TVA)
BROWNS FERRY NUCLEAR PLANT (BFN), UNITS 1 AND 2 DOCKET NOS. 50- 259, AND 50-260 SCVB (formerly ACVB)
Requests 75/73 (Unit 1/Unit 2), through 81/79, were provided to TVA bye-mail on April 6, 2009, and responded TVA's letter dated April 29, 2009. These requests were made for Browns Ferry Units 1 and 2 as TVA requested in a letter dated November 14, 2008, that the Unit 3 review be placed on hold. The requests are included here for completeness.
75/73. Provide the following information:
- a.
Liquid vapor interface area in reactor vessel;
- b.
Data for heat sinks (material, mass, and surface area) in drywell (DW),
wetwell (WW) airspace, and suppression pool);
- c.
Size of each vacuum breaker pipe and its length between WW and DW;
- d.
Reactor pressure vessel (RPV) metal thickness (average if it varies);
- e.
Elevations of suppression pool low and high water level;
- f.
Elevations of vacuum breaker line inlet (in WW) and outlet (in DW) area center;
- g.
Elevations of core spray (CS) suction line, and residual heat removal (RHR) suction line at the suppression pool;
- h.
For Appendix R event analysis, provide the heat removal rate by each drywell fan cooler.
76/74. FW flow rate at 102 percent extended power uprate (EPU), page 17 of Draft OPL-4a gives 28 million pounds per hour (Mlbs/hr), Figure 1-2 of the Unit 1 PUSAR (Enclosure 4 to the letter dated June 28,2004) gives 16,781,000 Ibslhr for feedwater (FW) flow. Explain the difference.
77/75. On page 5 of the Draft OPL 4a, the loss of coolant accident (LOCA) break area for long term response for the design basis accident (DBA) is 4.2 ft2 and for net positive suction head (NPSH) is 1.94 ft2. Specify the type of breaks, and explain why different types of breaks were considered for these cases.
78/76. Provide Reference 2 given in Draft OPL-4a page 23.
79/77. The vacuum breaker loss coefficient per draft OPL-4a page 18 is 0.45, address whether this includes entrance and exit loss coefficients.
- 2 80/78. On the last line of page 7, discuss what is meant by drywell holdup volume and why it is not modeled. On page 8, discuss why the drywell pool surface area not modeled.
81/79. The safe shutdown analysis document for Units 2 and 3, page 277 of 559, states When reactor pressure drops below the shutoff head of the RHR system, the RHR system operating in the LPGI [low pressure coolant injection] mode, would inject subcooled water into the reactor.
According to draft OPL-4a Page 14, the low pressure coolant injection (LPGI) pump shutoff head is 319.5 psig. In the Appendix R analysis, address whether LPGI is assumed to be initiated automatically based on its shutoff head setpoint after the operator depressurizes the reactor using three safety relief valves (SRVs). In case LPGI is assumed to be operator initiated in the analysis, provide the initiation time.
- 82.
In Tables 7.1 through 7.39 of Enclosure 1 to a letter dated August 31, 2006, a pressure is indicated in support of calculation of the NPSHa. Identify which pressure is represented in the table and provide information on where the pressure was measured as referenced from the pump [residual heat removal (RHR) and core spray (GS)] suction centerline. Also provide bounding values of the pump suction pressures for the DBA LOGA, station blackout (SBO), anticipated transient with scram (ATWS), Appendix R, Steam Line Breaks that were used to calculate the actual NPSHa.
- 83.
Provide the friction pressure loss (includes strainer loss, header and inlet piping loss) up to the suction flange of the RHR and GS pumps for flows under all events analyzed in to a letter dated August 31, 2006.
- 84.
Item q on page E1-12 in Enclosure 1 to a letter dated April 10, 2009, describes the mode of RHR suppression pool cooling as modeled in the SHEX containment analysis after the drywell pressure drops below 2.6 psig. Provide the time that this mode is initiated during the transient. Describe how a negative pressure in the containment is prevented, in the SHEX containment analyses, while the suppression pool cooling continues, given that the reactor building-to-wetwell vacuum breakers are not modeled.
- 85. to the letter dated April 10, 2009, page E1-12, item y addresses shutoff of LPGI above a certain water level. Provide the water level at which LPGI will be automatically shutoff, and discuss how the LPGI shutoff water level is addressed in the SHEX containment analysis. Also address the resultant water level should the RHR system be aligned to continue to support LPGI, with the RHR heat exchangers in use, and aligned in the alternate cooling mode.
- 86.
Provide the flow areas for each of the main steam relief valves.
- .. ML091880959 NRR-088 IOFFICE LPL2-2/PM LPL2-2/LA SCVB/BC LPL2-2/BC INAME EBrown BClayton RDennig HWalker for)
TBoyce BMozafari for)
DATE 7/15/09 7/15/09 7/13/09 7/15/09