Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0631104352006-11-0707 November 2006 Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Project stage: Request 05000260/LER-2007-001, Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test2007-03-0202 March 2007 Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test Project stage: Request ML0711300782007-04-18018 April 2007 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI) Project stage: Supplement ML0711503662007-04-24024 April 2007 Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions Project stage: Request ML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting 05000259/LER-2007-005, Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank2007-08-0808 August 2007 Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank Project stage: Request ML0723602572007-08-21021 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Limit Curves Project stage: Request ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request 05000296/LER-2007-003, Leak in an ASME Class I Code Reactor Pressure Boundary Pipe2007-11-21021 November 2007 Leak in an ASME Class I Code Reactor Pressure Boundary Pipe Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0804304462008-02-11011 February 2008 Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures Project stage: Request ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0805001712008-05-0202 May 2008 Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other 2007-07-05
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2009 LICENSEE:
Tennessee Valley Authority FACILITIES: Browns Ferry Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF FEBRUARY 26,2009, MEETING WITH THE TENNESSEE VALLEY AUTHORITY (TVA) TO DISCUSS PROPOSED EXTENDED POWER UPRATE ANALYSES REVISION (TAC NOS. MD5262 AND MD5263)
On February 26,2009, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 1 pUblic meeting with Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, 11555 Rockville Pike, One White Flint North, Rockville, Maryland. The purpose of the meeting was to discuss analyses revisions proposed by TVA in support of the extended power uprate amendment request for Browns Ferry Nuclear Plant. Enclosure 1 contains a list of attendees. The licensee presented a slide presentation [see the Agencywide Documents Access and Management System (ADAMS) accession No. ML090710768]. The licensee also presented proposed answers to questions that the Advisory Committee on Reactor Safeguards (ACRS) had posed to the NRC staff (see the ADAMS accession No. ML090710807).
DISCUSSION TVA revised the net positive suction head/containment accident pressure (NPSH/CAP) short term loss-of-coolant accident (LOCA) analyses by reducing the residual heat removal (RHR) pump flow rate into the broken recirculation loop by an excess flow rate value included in previous short-term LOCA NPSH calculations, thereby reducing the required NPSH at 10 minutes into the scenario. The relative humidity was also reduced to a more realistic number that would increase the amount of noncondensible gases in containment during the scenario, which results in an increase in CAP. Additionally, the time-dependent nature of the required NPSH was added to the model. TVA has concluded that these changes would allow the RHR pumps to remain within the vendor's performance curves while performing their functions during a LOCA. On a related note, a representative from the pump vendor Sulzer stated that the commercial pump specifications referenced in the analyses are minimal performance values and that actual performance, as demonstrated by pump tests, would be far better.
There was discussion of the time dependence of the required NPSH and how it is calculated.
The licensee explained that the time dependence of the required NPSH is based on integrated wear over the 8000 hours0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br />. Since the integrated wear over the 8000 hrs is constant, the ordering of the amount of the wear over time is arbitrary and the shape of the plot of the required NPSH over time as related to wear can be varied.
The staff spoke on attempting to determine the acceptance criteria for Appendix R scenarios requiring CAP. The licensee suggested that it would be helpful if the Boiling Water Reactor Owners Group would generate a standard approach to the issues.
- 2 The Sulzer representative responded to an ACRS staff member's question on how pump testing at a lower temperature can give reliable indication of NPSH at a higher suction temperature.
The representative stated that testing at a lower inlet temperature and using that temperature without correction at the higher inlet temperature is conservative since required NPSH decreases with increased temperature.
Environmental qualification of containment equipment was briefly discussed. The licensee stated that all equipment in containment is qualified to 281 degrees Fahrenheit for 100 days.
Also, there was a brief discussion regarding the ACRS request for information on how much cavitation of the pump was acceptable.
No members of the public were in attendance, and no feedback forms were received. No commitments or regulatory decisions were made by the NRC staff during the meeting.
Sincerely, IRA!
Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259 and 50-260
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
Attendees Nuclear Regulatory Commission Public Meeting with Tennessee Valley Authority Regarding Browns Ferry Power Uprate February 26, 2009 U. S. NUCLEAR REGULATORY COMMISSION Zena Abdullahi Sher Bahadur Tom Boyce Eva Brown Robert Dennig John N. Flack Daniel Frumkin John Lehning Richard Lobel Tracy Orf Bill Ruland Farideh Saba Ahsan Sallman Steve Smith TENNESSEE VALLEY AUTHORITY Gordon P. Arent James Emens Robert Marks Bertram C. Morris J.D. Wolcott SULZER Steven Schoenbrun Enclosure
- 2 The Sulzer representative responded to an ACRS staff member's question on how pump testing at a lower temperature can give reliable indication of NPSH at a higher suction temperature.
The representative stated that testing at a lower inlet temperature and using that temperature without correction at the higher inlet temperature is conservative since required NPSH decreases with increased temperature.
Environmental qualification of containment equipment was briefly discussed. The licensee stated that all equipment in containment is qualified to 281 degrees Fahrenheit for 100 days.
Also, there was a brief discussion regarding the ACRS request for information on how much cavitation of the pump was acceptable.
No members of the public were in attendance, and no feedback forms were received. No commitments or regulatory decisions were made by the NRC staff during the meeting.
Sincerely, IRA!
Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259 and 50-260
Enclosure:
List of Attendees*
cc w/encl: Distribution via Listserv ADAMS Accession No.: ML090710705 NRC-001 OFFICE LPLlI-2/PM LPLlI-2/PM LPLlI-2/LA LPLlI-2 NAME TOrf EBrown BClayton TBoyce (FSaba for)
DATE 3/19/09 3/19/09 3/19/09 3/23/09 OFFICIAL RECORD COpy
Summary of February 26,2009, Meeting with TVA to Discuss Proposed Extended Power Uprate Analyses Revision DISTRIBUTION:
PUBLIC Lp12-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMEBrown Ridsl\\lrrPMTOrf RidsNrrPMFSaba RidsNrrLABClayton RidsAcrsAcnw_MailCTR RidsNrrScvb RidsNrrDss RLobel, NRRISCVB RidsOgcRp RidsRgn2MailCenter CTucci JAdams, EDO Zena Abdullahi, ACRS John N. Flack, ACRS Sher Bahadur, NRR Daniel Frumkin, NRR John Lehning, NRR Ahsan Sallman, NRR Steve Smith, NRR