Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0631104352006-11-0707 November 2006 Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Project stage: Request 05000260/LER-2007-001, Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test2007-03-0202 March 2007 Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test Project stage: Request ML0711300782007-04-18018 April 2007 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI) Project stage: Supplement ML0711503662007-04-24024 April 2007 Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions Project stage: Request ML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting 05000259/LER-2007-005, Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank2007-08-0808 August 2007 Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank Project stage: Request ML0723602572007-08-21021 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Limit Curves Project stage: Request ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request 05000296/LER-2007-003, Leak in an ASME Class I Code Reactor Pressure Boundary Pipe2007-11-21021 November 2007 Leak in an ASME Class I Code Reactor Pressure Boundary Pipe Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0804304462008-02-11011 February 2008 Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures Project stage: Request ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0805001712008-05-0202 May 2008 Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other 2007-07-05
[Table View] |
Text
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT EXTENDED POWER UPRATE CREDIT FOR CONTAINMENT OVERPRESSURE ACRS CONCERNS Rockville, Maryland May 22, 2008
MEETING PURPOSE
" Review ACRS Concerns - COP
" TVA Approach to ACRS Concerns
" Present BFN Realistic Fire Analysis
" Dry Run ACRS Presentation N-2
ACRS CONCERNS
" Staff ACRS Presentation - COP Satisfactory -
EPU
- February 16, 2007 ACRS Letter COP Concerns
- Too Much - Too Long for Appendix R
- More Defensible Sensitivity Calcs - Long Term LOCA
- Feasibility of Protecting Additional RHR Pump
- Risk-Informed Arguments for Appendix R Should Consider External Initiators
APPROACH to ACRS CONCERNS
- Licensing Basis Analysis Complies with Rule
- No Change to Licensing Basis Appendix R
- No Change to EPU Licensing Basis Calculations
" Show Risk of COP is Low
- Use Realistic Deterministic Analysis vs. PRA
- Similar to Information Provided for LOCA, ATWS and SBO N-4
REALISTIC FIRE ANALYSIS Fire Hazards Analysis
- Consistent with Guidance Documents
- NRC Manual Chapter 0609, Appendix F
- NUREG/CR - 6850
- NEI-00-01
- IPEEE FIVE 23 of 39 Fire Areas Screen Out o 16 Areas + Control Room Evaluated Further Available Equipment and Operator Actions o Current EOI Procedures o COP Not Needed in 15 of 17 Fire Areas N-5
REALISTIC FIRE ANALYSIS Containment Response Analysis - Limiting Case
- Applies to 2/39 Fire Areas o Electrical Board Rooms
- Reactor Emergency Depressurization
- 1 RHR Pump Used for Pool Cooling
- BOP Pumps Used for Core Cooling
- RHR Alternate Shutdown Cooling Not Used
- Revised Vendor NPSH Requirement o Constant 17 Ft for Appendix R duration 70 Hours N-6
I I VIA TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT POWER UPRATE ACRS CONTAINMENT OVERPRESSURE Rockville, Maryland Xxxxxx xx, xxxx
IIVAI BFN Licensing History
- Credit for containment overpressure for 105%
OLTP
- LOCA - NRC Bulletin 96-03
- Currently for RHR pumps short-term (< 10 min.)
- Currently for core spray pumps long-term (> 10 min.)
- Credit for COP in Appendix R N-8
BFN ECCS Schematic N-9
NPSH Licensing Basis Analysis EP_.J
- LOCA
- ATWS
- SBO
- Appendix R Fire N-10
IM Effect of Power Uprate
- Increase in suppression pool temperature
- LOCA peak suppression pool temperature o 100% OLTP a 177°F o 105% OLTP o 177 to 180°F (dependent on UHS TS limits) o 120% OLTP o3 1870F N-11
NPSH Licensing 1jW Basis Analysis Elements of NPSH analysis:
" Suppression pool temperature profile
" Elevation head
" ECCS pump flows
- Suction path pressure drop
- Suction piping
- Suction strainer blockage and losses
" Required NPSH
" Wetwell pressure N-12
NPSH Licensing Basis Analysis
- LOCA short term (< 10 min.)
4 core spray pumps at maximum system flow 2 RHR pumps at design LPCI flow to intact recirculation loop 2 RHR pumps at maximum system flow to broken loop Debris loading on strainers RHR and core spray pumps need COP
- LOCA long term (> 10 min.)
2 core spray pumps at design flow 2 RHR pumps at containment cooling flow Debris loading on strainers Core spray pumps need COP N-13
COP Available and COP Required Long-Term LOCA Analysis 200 22 190 Containment 20 180Temperature 18 170 160-CS Pump Containment I6 15 Pressure Required Atmospheric Pressure 14 140 13-RHR Pump ContainmentI Pressure Required I
120--
10 0
4 8
12 16 20 24 Time (hours)
N-14
NPSH Licensing Basis Analysis
- 1 RHR pump injecting to vessel
- No strainer debris
- RHR pump needs COP N-15
COP Available and COP Required Appendix R Fire Analysis 30 220 Suppression Pool Tempe rature 200 25 180 160 Required 140 15 Atmospheric Pressure 120 100 10 0
10 20 30 40 50 60 Time (hours)
N-16
Realistic NPSH Analysis COP Meets Five Principles of Regulatory Guide 1.174
" Meets current regulations
" Consistent with defense-in-depth philosophy
" Maintains sufficient safety margins
" Results in very small risk increase
" Impact is monitored N-17
Realistic NPSH Analysis PSA model for LOCA, ATWS and SBO
- Probability distribution for suppression pool temperature
" River temperature
- Initial suppression pool temperature
" Suppression pool water level
" Initial power level
" Containment failure and containment leakage probability
- Dependence of ECCS on COP vs. No Dependence
- ACDF/ALERF 2.4E-8/yr Well within acceptance guidelines for ACDF and ALERF N-18
REALISTIC FIRE ANALYSIS Fire Hazards Analysis 23/39 Fire Areas Screened Out o No Fire Damage o 16 Areas + Control Room Evaluated Further Available Equipment and Operator Actions Identified o Current EOI Procedures o 15/17 Areas Do Not Need COP 2 Areas Require Some COP - Limiting Case o 1 RHR PUMP/Heat Exchanger for Containment Cooling o BOP Pumps for Core Cooling o Significant COP Margin Available N-19
NPSH Licensing Basis Analysis IM 240 40 35 220 200 -
I.
180 160 140 120 100 30 25 20 15 10 5
0 10 20 30 40 50 Time, Hours 60
-Suppression Pool Temperature (realistic)
RHR pump required wetwell pressure (realistic)
-wetwell pressure (realistic)
N-20
Realistic NPSH Analysis
- COP only required for LOCA with specific single failures
° COP not required for ATWS with best estimate code
- Small amount of COP required for Fire Event in warm weather
- COP not required for station blackout for 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> vs.
4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> coping duration N-21
Summary
" Licensing basis NPSH analyses are conservative
" Overpressure credit in-line with industry
" Realistic analyses show reduced or no dependency on COP
" Very low risk following ACRS guidance N-22