(BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses
ML081010450
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/04/2008
From: Langley D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MD5262, TAC MD5263, TAC MD5264, TVA-BFN-TS-418, TVA-BFN-TS-431
Download: ML081010450 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Adabama 35609-2000 April 4, 2008 TVA-BFN-TS-418 TVA-BFN-TS-431 10 CFR 50.90 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop OWFN, P1-35 Washington, D.

C.

20555-0001 Gentlemen:

In the Matter of

)

Docket Nos.

50-259 Tennessee Valley Authority

)

50-260 50-296 1ROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 -

TECHNICAL SPECIFICATIONS (TS)

CHANGES TS-431 AND TS-418 -

EXTENDED POWER UPRATE (EPU)

RESPONSE TO ROUND 15 AND ROUND 16 REQUESTS FOR ADDITIONAL INFORMATION (RAI)

REGARDING STEAM DRYER ANALYSES, GROUP 3 (TAC NOS.

MD5262, MD5263, AND MD5264)

By letters dated June 28, 2004 and June 25, 2004 (ADAMS Accession Nos. ML041840109 and ML041840301),

TVA submitted license amendment applications to the NRC for the EPU of BFN Unit 1 and BFN Units 2 and 3, respectively.

The proposed amendments would change the operating licenses to increase the maximum authorized core thermal power level of each reactor to 3952 megawatts.

On December 14,

2007, the NRC staff issued a Round 15 RAI (ML073450725) regarding the EPU license amendment requests.

On January 31,

2008, TVA provided a response (ML080380560) to several of the RAIs regarding the steam dryer and provided a schedule for replying to the remainder of the Round 15 RAIs.

On February 6, 2008, the NRC staff issued a Round 16 RAI (ML080370146) which included one additional RAI regarding the steam dryer (EMCB.167/134).

Responses to the second group of steam dryer RAIs were provided by letter dated March 6,

2008, Ak*24*

U.S.

Nuclear Regulatory Commission Page -2

.1 April 4, 2008 (ML080710498). to this letter provides the third group of responses to the steam dryer RAIs including Round 16 RAI EMCB.167/134.

Schedule and completion dates for the responses to the RAIs are also provided in Enclosure 1.

The steam dryer analyses for Unit 2 have been re-performed as described in the response to EMCB.166/133 in Enclosure 1.

The associated analyses are provided in Enclosure 2 (CDI Report No.08-07P, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer") and Enclosure 3 (CDI Report No.08-05P, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed").

Unit 2 limit curves based on the revised steam dryer analyses are provided in Enclosure A (CDI Technical Note No.08-13P, "Limit Curve Analysis with ACM Rev.

4 for Power Ascension at Browns Ferry Nuclear Unit 2").

Additionally, the Steam Dryer Monitoring Plan discussed in the response to EMCB.131/98 is provided in Enclosure 5.

Note that Enclosures 1, 2, 3,

and 4 contain information that Continuum Dynamics, Inc.

(CDI) considers to be proprietary in nature and subsequently, pursuant to 10 CFR 2.390(a) (4),

requests that such information be withheld from public disclosure.

Enclosures 6, 7,

8, and 9 contain the redacted versions of the proprietary enclosures with the CDI proprietary material removed, which are suitable for public disclosure. 0 provides affidavits from CDI supporting this request.

TVA has determined that the additional informatioh provided by this letter does not affect the no significant hazards considerations associated with the proposed TS changes.

The proposed TS changes still qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c) (9).

No new regulatory commitments are made in this submittal.

If you have any questions regarding this letter, please contact me at (256)729-2636.

U.S.

Nuclear Regulatory Commission Page 3 April 4, 2008 I declare under penalty of perjury that the foregoing is true and correct.

Executed on this 4th day of April, 2008.

Sincerely, D.

T.

Lang ey Manager of Licensing and Industry Affairs

Enclosures:

1.

Response to Round 15 and 16 Requests for Additional Information (RAI)

Regarding Steam Dryer Analyses, Group 3 (proprietary version)

2.

CDI Report No.08-07P, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer" (proprietary version)

3.

CDI Report No.08-05P, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed" (proprietary version)

4.

CDI Technical Note No.08-13P, "Limit Curve Analysis with ACM Rev.

4 for Power Ascension at Browns Ferry Nuclear Unit 2" (proprietary version)

5.

BFN Steam Dryer Monitoring Plan

6.

Response to Round 15 and 16 Request for Additional Information (RAI) Regarding Steam Dryer Analyses, Group 3 (non-proprietary version)

7.

CDI Report No.

08-07NP, "Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer" (non-proprietary version)

8.

CDI Report No.

08-05NP, "Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed" (non-proprietary version)

U.S.

Nuclear Regulatory Commission Page 4 April 4, 2008

9.

CDI Technical Note No.

08-13NP, "Limit Curve Analysis with ACM Rev.

4 for Power Ascension at Browns Ferry Nuclear Unit 2" (non-proprietary version)

10.

CDI Affidavits

U.S. Nuclear Regulatory Commission Page 5 April 4, 2008 Enclosures cc (Enclosures):

State Health Officer Alabama State Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road

Athens, AL 35611-6970 Rebecca L.

Nease, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Eva Brown, Project Manager U.S.

Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739