| | title = 10/06/1972 Summary of Meeting with Commonwealth Edison Company on Reporting and Organization of Information - Dresden Units 2 and 3 | | | title = Summary of Meeting with Commonwealth Edison Company on Reporting and Organization of Information - Dresden Units 2 and 3 |
| | author name = Silver R D | | | author name = Silver R |
| | author affiliation = US Atomic Energy Commission (AEC) | | | author affiliation = US Atomic Energy Commission (AEC) |
| | addressee name = | | | addressee name = |
Line 13: |
Line 13: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:* |
| | ~/* ¥f |
| | ~ |
| | :- - ~"'! |
| | OCT 3 'O 1972 Files (Dc;>cket ..No~. 50-237 THRU: D. L. Ziemann, Chief, |
| | ~ l-r2 -2, L ~ . |
| | D.-/L. ~,._._,.~,..--.-... |
| | MEETING WITH Cb);ONWEALTH EDISON COMPANY ON REPORTING AND ORGANiZ~TION ... |
| | OF INFORMATION On October 6, 1972, a meeting was held in Bethesda with Connnonwealth Edison Company to discuss (1) plans for organizing information on Dresden 2 and 3 dockets (ref: ltr. to CEC dtd 7/18/72 and ltr. from CEC dtd 9/19/72) and (2) reporting of abnormal occurrences. Attending the meeting were: |
| | R. Diggs, L:OR-2 Dell Butterfield, CEC R. Silver, L:OR-2 Bob Lemke, CEC (assigned to H. Hoyt) |
| | J. Brentlinger, NARS Tom Tramm, CEC (assigned to B. Lee) |
| | George Wagner, CEC (to be assigned ~o H. Hoyt) |
| | The CE representatives agreed to develop a cumulative subject index to include all technical submittals including the SAR, amendments to.the SAR, technical specifications change applications, special operations reports and semiannual reports of modifications. The subject index will be based primarily on the SAR table of contents which_ will be_ expanded as necessary to .incorporate all relevant subject information by reference to document nu\llber, date and page thereof. The cumulative locater index will be revised semiannually and revised pages will be submitted' along with the semiannual report.. ' - |
| | Regarding t~e contents of abnormal occurrence reports, CE plans to set up a review mechan,i$I,Tl. to_ assure that the discussions, especially of corrective actions, are complete arid that corrective actions at both Dresden Units and* |
| | both Quad-Cities Units are discussed. (The Dresden plant superintendent can~ot discuss corrective actions at. Quad-Cities and visa versa and therefore a central review mechanism is necessary.) |
| | The tentative plans.also call for*a central analysis of operating experience trends as part of the QA program. CE also has begun an error analysis pr_ogram. |
| | The CE representatives stated that after an abnormal occurrence at one station, the nee,d for investigation. and corrective action at the other station is q.lways checked. CE agreed that whenever an abnormal occurrence involved the need for long term followup, the initial report would include a tentative date for submittal of 'the final report. |
| | R. D. Silver . |
| | Operating Reactors Branch #2 Directorate of Licensing cc: See next page |
| | |
| | cc: D. J. Skovholt T. J. Carter D. L. Ziemann R. D. Silver R. M *. Diggs OGC RO (3) |
| | M. Jinks J. Brentlinger, NARS |
| | ''i{;.. |
| | . *1:,, |
| | *1: |
| | i1 ' |
| | .' *\~* |
| | |
| | 9. |
| | UNITED STATES ATOMIC EN,ERGY COMMISSION WASHINGTON, D.C. 20545 October 26~ 1972 ' |
| | R. C. DeYoung, Assistant Director for PWR' s, L TURKEY POINT 3 - INITIAL CRITICALITY We were informed by our Region' II (Atlanta) Office that Turkey Point 3 achieved initi~l criticality at 10:03 p.m. |
| | (EDT) on October 20, 1972. Our reactor inspector, who was at the site, reported that the f-pproach to criticality was conducted in a safe and orderly manner and that the reactor coolant boron concentration at criticality was in reasonably close agreement with the predicted value. |
| | ~ "'5,rd.£)~- |
| | R. H. Engelken, Assistant Director for Inspection and Enforcement Directorate of Regulator)r Operations* |
| | * cc: E. J. Bloch, DDR |
| | : s. H. Hanauer, DRTA F. E. Kruesi, RO |
| | \l* F. O'Leary, L E. G. Case, L A. Giambusso, L D. J. Skovholt, L R. s. Boyd, L R. L. Tedesco, L H. R. Denton, L D. F. Knuth, L R. R. Maccary, L D. R. Muller, L J. G. Keppler, RO K. Kniel, L P. s. Check, L |
| | : w. c. Seidle, RO:II RO Regional Directors PDR Local PDR}} |
|
---|
Category:Meeting Summary
MONTHYEARML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23276A1852023-09-25025 September 2023 Subsequent License Renewal Draft EIS Public Meetings: Meeting Summary ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23221A3782023-08-16016 August 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23081A5022023-03-28028 March 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22238A2762022-08-29029 August 2022 Summary of August 17, 2022, Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22186A0812022-07-15015 July 2022 Summary of June 22, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Fire Protection Program Changes ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22160A3792022-06-30030 June 2022 Summary of May 24, 2022, Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Reactor Coolant Pump Seal Replacements ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22158A3102022-06-0808 June 2022 Summary of May 31, 2022, Public Outreach to Discuss NRC 2021 End of Cycle Performance Assessment of Dresden Power Station, Units 2 and 3, and Quad Cities Power Station, Units 1 and 2 ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22060A0782022-03-0707 March 2022 Summary of Meeting with Constellation Energy Generation, LLC Regarding a Proposed Alternative to Extend the In-service Inspection Intervals ML22054A0082022-03-0303 March 2022 Summary of February 17, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Intake Cooling Water Discharge Piping Proposed Alternative 2024-08-21
[Table view] |
Text
~/* ¥f
~
- - - ~"'!
OCT 3 'O 1972 Files (Dc;>cket ..No~. 50-237 THRU: D. L. Ziemann, Chief,
~ l-r2 -2, L ~ .
D.-/L. ~,._._,.~,..--.-...
MEETING WITH Cb);ONWEALTH EDISON COMPANY ON REPORTING AND ORGANiZ~TION ...
OF INFORMATION On October 6, 1972, a meeting was held in Bethesda with Connnonwealth Edison Company to discuss (1) plans for organizing information on Dresden 2 and 3 dockets (ref: ltr. to CEC dtd 7/18/72 and ltr. from CEC dtd 9/19/72) and (2) reporting of abnormal occurrences. Attending the meeting were:
R. Diggs, L:OR-2 Dell Butterfield, CEC R. Silver, L:OR-2 Bob Lemke, CEC (assigned to H. Hoyt)
J. Brentlinger, NARS Tom Tramm, CEC (assigned to B. Lee)
George Wagner, CEC (to be assigned ~o H. Hoyt)
The CE representatives agreed to develop a cumulative subject index to include all technical submittals including the SAR, amendments to.the SAR, technical specifications change applications, special operations reports and semiannual reports of modifications. The subject index will be based primarily on the SAR table of contents which_ will be_ expanded as necessary to .incorporate all relevant subject information by reference to document nu\llber, date and page thereof. The cumulative locater index will be revised semiannually and revised pages will be submitted' along with the semiannual report.. ' -
Regarding t~e contents of abnormal occurrence reports, CE plans to set up a review mechan,i$I,Tl. to_ assure that the discussions, especially of corrective actions, are complete arid that corrective actions at both Dresden Units and*
both Quad-Cities Units are discussed. (The Dresden plant superintendent can~ot discuss corrective actions at. Quad-Cities and visa versa and therefore a central review mechanism is necessary.)
The tentative plans.also call for*a central analysis of operating experience trends as part of the QA program. CE also has begun an error analysis pr_ogram.
The CE representatives stated that after an abnormal occurrence at one station, the nee,d for investigation. and corrective action at the other station is q.lways checked. CE agreed that whenever an abnormal occurrence involved the need for long term followup, the initial report would include a tentative date for submittal of 'the final report.
R. D. Silver .
Operating Reactors Branch #2 Directorate of Licensing cc: See next page
cc: D. J. Skovholt T. J. Carter D. L. Ziemann R. D. Silver R. M *. Diggs OGC RO (3)
M. Jinks J. Brentlinger, NARS
i{;..
. *1:,,
i1 '
.' *\~*
9.
UNITED STATES ATOMIC EN,ERGY COMMISSION WASHINGTON, D.C. 20545 October 26~ 1972 '
R. C. DeYoung, Assistant Director for PWR' s, L TURKEY POINT 3 - INITIAL CRITICALITY We were informed by our Region' II (Atlanta) Office that Turkey Point 3 achieved initi~l criticality at 10:03 p.m.
(EDT) on October 20, 1972. Our reactor inspector, who was at the site, reported that the f-pproach to criticality was conducted in a safe and orderly manner and that the reactor coolant boron concentration at criticality was in reasonably close agreement with the predicted value.
~ "'5,rd.£)~-
R. H. Engelken, Assistant Director for Inspection and Enforcement Directorate of Regulator)r Operations*
- s. H. Hanauer, DRTA F. E. Kruesi, RO
\l* F. O'Leary, L E. G. Case, L A. Giambusso, L D. J. Skovholt, L R. s. Boyd, L R. L. Tedesco, L H. R. Denton, L D. F. Knuth, L R. R. Maccary, L D. R. Muller, L J. G. Keppler, RO K. Kniel, L P. s. Check, L
- w. c. Seidle, RO:II RO Regional Directors PDR Local PDR