MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-0303 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 Project stage: Meeting ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion Project stage: Meeting ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 Project stage: Meeting 2024-01-30
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24275A0302024-10-0707 October 2024 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment Request to Allow Modification of the Standby Gas Treatment System ML24261B7722024-09-18018 September 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC, Related to the License Amendment Request to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital PPS ML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24214A1402024-08-0505 August 2024 July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24193A3432024-07-12012 July 2024 Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML24192A2122024-07-10010 July 2024 Summary of the May 22, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Lasalle County Station, Units 1 and 2 ML24183A1642024-07-0202 July 2024 June 27, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML24162A2212024-06-24024 June 2024 Summary of April 11, 2024, Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (EPID L-2022-LLA- ML24151A2592024-06-0303 June 2024 May 22, 2024, Summary of Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24135A3722024-05-22022 May 2024 Enclosure 1 - Meeting Summary for May 7 and May 9 2024 Public Scoping Meetings ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request ML23234A2342023-08-29029 August 2023 Summary of August 18, 2023, Meeting with Constellation Energy Generation, LLC, Related to the LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23237A2692023-08-25025 August 2023 Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23173A0142023-06-22022 June 2023 Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML23173A0072023-06-22022 June 2023 Summary of the Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A2802023-03-28028 March 2023 Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23068A3762023-03-16016 March 2023 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 ML23030A0092023-02-10010 February 2023 January 10, 2023, Summary of Meeting with Constellation Energy Generation, LLC, on Planned Limerick Digital Modernization Project Installation Support License Amendment Request and Exemption Request ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests ML22346A0002022-12-14014 December 2022 Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests ML22318A1712022-11-16016 November 2022 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment to Revise the Design Basis for Certain Suppression Pool Structures and Components ML22227A1112022-08-25025 August 2022 Summary of June 24, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22168A1922022-06-24024 June 2022 Summary of May 3, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML22158A3102022-06-0808 June 2022 Summary of May 31, 2022, Public Outreach to Discuss NRC 2021 End of Cycle Performance Assessment of Dresden Power Station, Units 2 and 3, and Quad Cities Power Station, Units 1 and 2 2024-09-18
[Table view] |
Text
February 2, 2024
LICENSEE: Constellation Energy Generation, LLC
FACILITIES: Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; and Quad Cities Nuclear Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF JANUARY 30, 2024, MEETING WITH CONSTELLATION ENERGY GENERATION, LLC ON PLANNED REQUESTS TO USE CODE CASE N-932 (EPID L-2023-LRM-0111)
On January 30, 2024, an observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of C onstellation Energy Generation, LLC (CEG, the licensee) via webinar. The purpose of this meeting was to discuss CEGs plans to submit a request to use American Society of Mechanical Engineers (ASME) Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion Section XI, Division 1, for Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine M ile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; and Quad Cities Nuclear Power Station, Units 1 and 2 (collectively, the CEG facilities). The meeting notice and agenda dated January 3, 2024, are available in the Agencyw ide Documents Access and Management System (ADAMS) at Accession No. ML24029A292, and CEGs meeting handout is available at ML24029A174. A list of attendees is enclosed.
The licensee presented information regarding (1) the current ASME requirements for wetted surfaces of submerged areas, (2) a description of Code Case N-932, and (3) the benefits of utilizing Code Case N-932. The licensee sought guidance on options for submitting the application. Specifically, the licensee proposed to either (a) submit the application as a single application for all the affected sites, (b) submit the application as a single application for just those sites most in need of the alternative, or (c) submit separate applications for each site in need of the alternative. CEG currently plans to submit the alternative requests in Spring 2024.
The NRC staff provided feedback on the following topics:
Projecting Wall Thickness: The NRC staff recommended that CEG ensure sufficient detail is provided in the application to describe how the licensee determines that corrosion or erosion of the component wall thickness is projected to not reduce to less than 110 percent of the minimum design wall thickness prior to the next examination.
Submission of Application: The NRC staff indicated that the generic review for acceptance of ASME Code Case N-932 was a multi-group effort through rulemaking, which the licensee understood would take some time to complete. In the interim, the
NRC staff suggested that a plant-specific app lication to utilize ASME Code Case N-932, including details of the specific application and hardship, would be a smaller and more focused scope of review.
The NRC staff appreciated that the licensee held the meeting sufficiently early in the development process so that any staff comment could be considered in the application.
No members of the public had questions or comments during the meeting. No regulatory decisions were made at this meeting. Please direct any inquiries to me at 301-415-2855, or Scott.Wall@nrc.gov.
Sincerely,
/RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, and 50-265
Enclosure:
List of Attendees
cc: Listserv LIST OF ATTENDEES
JANAURY 30, 2024, PUBLIC MEETING WITH
CONSTELLATION ENERGY GENERATION, LLC
PLANNED REQUESTS TO USE CODE CASE N-932
Name Organization Scott Wall Nuclear Regulatory Commission (NRC)
Ian Tseng NRC George Wang NRC Michael Benson NRC Jay Collins NRC Elena Herrera Torres NRC
Mark Weis Constellation Energy Generation, LLC (CEG)
Bryce Babarsky CEG Dan Moreno CEG
Thomas Basso Nuclear Energy Institute (NEI)
Enclosure