Letter Sequence Approval |
---|
|
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: BSEP-96-0428, Provides Comments on Resolution of Spent Fuel Storage Pool Safety Issues, HL-5262, Forwards Comments to 960917 NRC Ltr Re Resolution of Spent Fuel Pool Safety Issues, ML20116E584, ML20116F061, ML20129D921, ML20129D965, ML20129F423, ML20132G883, ML20134C905, ML20134M234, ML20134M563
|
MONTHYEARML20116F0611996-07-25025 July 1996 Responds to , Spent Fuel Survey Commitments for Byron Station,Units 1 & 2, Informing NRC That Clarification of Description of Refueling Activities Including Full Core Temporary Offload Will Be Provided by Dec 1996 Project stage: Other ML20116E5841996-08-0101 August 1996 Responds to Re Spent Fuel Survey Commitments for Waterford Steam Electric Station,Unit 3 Project stage: Other ML20129D2741996-09-20020 September 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues.Staff Intends to Conduct plant-specific Regulatory Analyses to Evaluate Potential Safety Enhancement Backfits,Per 10CFR50.109(a)(3) Project stage: Approval ML20129D3051996-09-24024 September 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues.Staff Concludes That Existing Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20129D3351996-09-24024 September 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues.Staff Intends to Conduct plant-specific Regulatory Analyses to Evaluate Potential Safety Enhancement Backfits,Per 10CFR50.109(a)(3) Project stage: Approval ML20129F6741996-09-24024 September 1996 Informs That Staff Has Completed Detailed Review of Sfsp Safety Issues & Forwards Results for Review Project stage: Approval ML20129F4231996-09-25025 September 1996 Forwards 960726 Memo to Commission from J Taylor Re Resolution of Spent Fuel Storage Pool Action Plan Issues. Concludes That Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Other ML20129D9761996-09-26026 September 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues.Staff Concludes That Existing Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20129D9211996-09-26026 September 1996 Forwards NRC Rept on Resolution of Spent Fuel Storage Pool Safety Issues.Concludes That Exisiting Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Other ML20129D9651996-09-26026 September 1996 Forwards Rept Re Resolution of Spent Fuel Storage Pool Safety Issues.Concludes That Existing Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Other ML20129E1121996-09-26026 September 1996 Discusses Detailed Review of Spent Fuel Storage Pool Safety Issues.Results of Review Encl Project stage: Approval ML20129E5361996-09-27027 September 1996 Forwards Results of Detailed Review of Spent Fuel Storage Pool Safety Issues.Rept Should Be Reviewed for Applicability to Facility & Actions Considered Re Design of Spent Fuel Pool Decay Heat Removal Sys.No Response Required Project stage: Approval ML20128H4541996-10-0101 October 1996 Discusses Completion of Detailed Review of Sfsp Safety Issues.Staff Concludes That Existing Structures,Sys & Components Related to Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20128Q3811996-10-0303 October 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues Documented in Encl Rept to Commission. Structure,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20128N1961996-10-0404 October 1996 Requests Review of Resolution of Spent Fuel Storage Pool Safety Issues:Issuance of Final Rept,Vermont Yankee Power Station.Rept to Commission Encl Project stage: Approval ML20134C9051996-10-0808 October 1996 Forwards Final Rept Re Spent Fuel Storage Pool Safety Issues Project stage: Other ML20128M7171996-10-0909 October 1996 Forwards Results of Staff Review of Spent Fuel Storage Pool Safety Issues Documented in Encl Rept to Commission. Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20129C0531996-10-17017 October 1996 Discusses Review of Rept of Sfsp Safety Issues,Concluding That Existing Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection.Staff to Conduct plant-specific Safety Enchancement Backfit Analyses Project stage: Approval ML20129D1911996-10-22022 October 1996 Discusses Completion of Detailed Review of Sfsp Safety Issues.Staff Concludes That Existing Structures,Sys & Components Related to Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety Project stage: Approval ML20129H3761996-10-30030 October 1996 Forwards Results of Staff Review of Spent Fuel Storage Issues.Structures,Sys & Components Re Storage of Irradiated Fuel Provide Adequate Protection of Public Health & Safety. W/O Rept to Commission Project stage: Approval ML20134J7151996-11-13013 November 1996 Forwards Results of Staff Review of Resolution of Spent Fuel Storage Pool Safety Issues Project stage: Approval ML20134M2341996-11-13013 November 1996 Responds to NRC Re Resolution of Spent Fuel Pool Safety Issues & Issuance of Final Staff Rept & Notification of Plans to Perform plant-specific,safety-enhancement Backfit Analyses Project stage: Other HL-5262, Forwards Comments to 960917 NRC Ltr Re Resolution of Spent Fuel Pool Safety Issues1996-11-14014 November 1996 Forwards Comments to 960917 NRC Ltr Re Resolution of Spent Fuel Pool Safety Issues Project stage: Other ML20134M5631996-11-14014 November 1996 Provides Comments on Rept on Spent Fuel Storage Pool Issues & Accompanying NRC Project stage: Other BSEP-96-0428, Provides Comments on Resolution of Spent Fuel Storage Pool Safety Issues1996-11-15015 November 1996 Provides Comments on Resolution of Spent Fuel Storage Pool Safety Issues Project stage: Other ML20132G8831996-12-20020 December 1996 Submits Comments on NRC Rept Re Resolution of Spent Fuel Storage Pool Safety Issues:Issuance of Final Staff Rept & Notification of Staff Plans to Perform Plant-Specific,Safety Enhancement Backfit Analyses,Dbnps Project stage: Other 1996-11-14
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Text
_. _ __ _ __ _ _ _ _ _. __ ._ _. _ .-.. __ _ ._ _ _ _ _ _ __ _ _ _ _
.Mr. E. Thomas B:ulette, Ph.D November 13, 1996 (reissued with date)
Senior Vice Presid2nt - Nuclear Boston Edison Company 1 Pilgrim Nuclear Power Station
- RFD #1 Rocky Hill Road 1 Plymouth, MA 02360 '
i
SUBJECT:
RESOLUTION OF SPENT FUEL STORAGE POOL SAFETY ISSUES: ISSUANCE OF i
FINAL REPORT, PILGRIM NUCLEAR POWER STATION (TAC NO. M88094)
Dear Boulette:
) The Nuclear Regulatory Commission staff recently completed a detailed review j of spent fuel storage pool safety issues. The results of the staff's review 1 are documented in a report to the Commission which is enclosed for your j information. In the report, the staff concludes that existing structures, systems, and components related to the storage of irradiated fuel provide l adequate protection of public health and safety.
i Notwithstanding this finding, the staff has also identified certain design i features that reduce the reliability of spent fuel pool decay heat removal, increase the potential for loss of spent fuel coolant inventory, or increase the potential for consequential loss of essential safety functions at an operating reactor. The staff intends to conduct plant-specific regulatory j analyses to evaluate potential safety enhancement backfits pursuant to 10 CFR j 50.109(a)(3) at a number of operating plants that possess one or more of these
- design features.
Although Pilgri : i: not identified for a plant-specific safety enhancement 4 backfit analysis by the stJf, it is requested that you review the enclosed !
j report for applicability to your facility and consider actions, as 1 appropriate, related to the design of spent fuel pool decay heat removal
! systems at your facility. This letter does not require any response. i
! If you have any questions regarding this matter, please do not hesitate to j contact Alan B. Wang at (301) 415-1445.
Sincerely, original signed by A.Dromerick for S. Singh Bajwa, Project Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-293 ,
Enclosure:
Memo to the Commission, from /
J. Taylor, " Resolution of Spent Fuel Storage Pool Action Plan Issues,"
dated July 26, 1996 cc w/ enc 1: See next page gg g @M NY DOCUMENT NAME: G:\ PILGRIM \sfp.mem To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" = Copy Wth attachment / enclosure "N" - No copy 0FFICE PM: POI 1 , lE LA: POI 1 M lE D:PD% & / lC l l l mnE m ens:sw b w suteter saaf4/VAf 4B I DATE 10/ M / M 10/t9/% 10/Uf /9' // 10/ /M 10/ /% l OFFICLAL RECORD COPY 9611100008 961113 PDR ADOCK 05000293 P PDR __
pn 3109 g i UNITED STATES 2
s" j NUCLEAR REGULATORY COMMISSION
- WASHINGTON. D.C. 20066-0001 November 13, 1996 (reissued with date)
Mr. E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclea, Power Station
- RFD #1 Rocky Hill Road Plymouth, MA 02360 l
S E1ECT: RESOLUTION OF SPENT FUEL STORAGE POOL SAFETY ISSUES: ISSUANCE OF FINAL REPORT, PILGRIM NUCLEAR POWER STATION (TAC NO. M88094) i
Dear Boulette:
{
< 1 The Nuclear Regulatory Commission staff recently completed a detailed review of spent fuel storage pool safety issues. The results of the staff's review are documented in a report to the Consnission which is enclosed for your 1
information. In the report, the staff concludes that existing structures, systems, and components related to the storage of irradiated fuel provide
- adequate protection of public health and safety.
Notwithstanding this finding, the staff has also identified certain design features that reduce the reliability of spent fuel pool decay heat removal,
- increase the potential for loss of spent fuel coolant inventory, or increase the potential for consequential loss of essential safety functions at an operating reactor. The staff intends to conduct plant-specific regulatory analyses to evaluate potential safety enhancement backfits pursuant to 10 CFR 50.109(a)(3) at a number of operating plants that possess one or more of these design features.
4 Although Pilgrim is not identified for a plant-specific safety enhancement backfit analysis by the staff, it is requested that you review the enclosed report for applicability to your facility and consider actions, as appropriate, related to the design of spent fuel pool decay heat removal systems at your facility. This letter does not require any response.
If you have any questions regarding this matter, please do not hesitate to contact Alan B. Wang at (301) 415-1445.
Sincerely, S. Sing Bajwa, Acting Project Direct Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
Memo to the Commission, from J. Taylor, " Resolution of Spent Fuel Storage Pool Action Plan Issues,"
dated July 26, 1996 cc w/ enc 1: See next page
I E. Thomas Boulette Pilgrim Nuclear Power Station cc:
1 Mr. Leon J. Olivier Mr. David F. Tarantino Vice President of Nuclear Nuclear Information Manager Operations & Station Director Pilgrim Nuclear Power Station !
Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road .
RFD #1 Rocky Hill Road Plymouth, MA 02360 l Plymouth, MA 02360 l Ms. Kathleen M. O'Toole Resident Inspector Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety Pilgrim Nuclear Power Station One Ashburton Place Post Office Box 867 Boston, MA 02108 Plymouth, MA 02360 Mr. David Rodham, Director Chairman, Board of Selectmen Massachusetts Emergency Management l 11 Lincoln Street Agency Plymouth, MA 02360 400 Worcester Road P.O. Box 1496 Chairman, Duxbury Board of Selectmen Framingham, MA 01701-0317 Town Hall Attn: James Muckerheide 878 Tremont Street Duxbury, MA 02332 Chairmen, Citizens Urging Responsible Energy Office of the Commissioner P. O. Box 2621 Massachusetts Department of Duxbury, MA 02331 Environmental Protection One Winter Street Citizens at Risk Boston, MA 02108 P. O. Box 3803 l Plymouth, MA 02361 Office of the Attorney General One Ashburton Place W. S. Stowe, Esquire 20th Floor Boston Edison Company Boston, MA 02108 800 Boylston St., 36th Floor Boston, MA 02199 Mr. Robert M. Hallisey, Director Radiation Control Program Chairman Massachusetts Department of Nuclear Matters Committee Public Health Town Hall 305 South Street 11 Lincoln Street Boston, MA 02130 Plymouth, MA 02360 Regional Administrator, Region I Mr. William D. Meinert U. S. Nuclear Regulatory Commission Nuclear Engineer 475 Allendale Road Massachusetts Municipal Wholesale King of Prussia, PA 19406 Electric Company P.O. Box 426 Ms. Jane Fleming Ludlow, MA 01056-0426 4 8 Oceanwood Drive Duxbury, MA 02332 Mrs. Nancy Desmond Manager, Reg. Affairs Dept.
Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360
1 Mr. Jeffrey Keene j Regulatory Affairs Department Manager Boston Edison Company i 600 Rocky Hill Road
- Plymouth, MA 02360-5599 4
b l
i
i l DISTRIBUTION: w/o enclosure:
Docket File JShea PUBLIC !
PDI-1 R/F l S. Varga l 4-J. Zwolinski l l
S. Bajwa i
S. Little A. Wang OGC I
ACRS R. Cooper, RI i
\
i i
I 9
l 4
i j
l I
i 4
e 1
i 150073 ,
i