Responds to , Spent Fuel Survey Commitments for Byron Station,Units 1 & 2, Informing NRC That Clarification of Description of Refueling Activities Including Full Core Temporary Offload Will Be Provided by Dec 1996
ML20116F061
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/25/1996
From: Kofron K
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-96-0208, BYRON-96-208, TAC-M88094, NUDOCS 9608060221
Download: ML20116F061 (2)


Text

_ - _ _ - _ _ _ - - - -

  • Common %CJ][h lidivin CompJny it) ron Generating $tation iMO North Gcrman Church Road
  • . 15) run.11. 61010979 6 TrlH142 M 5441 July 25,1996 LTR: BYRON-96-0208 FILE: 1.10.0101 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 -

ATTENTION: Document Control Desk

SUBJECT:

Response to Spent Fuel Survey Commitments for Byron Station ,

Byron Station, Units 1 and 2 ,

NRC Docket Numbers: 50-454 and 455 q

REFERENCE:

Letter from G. F. Dick (NRC) to D. L. Farrar (Comed), " Spent Fuel Survey Commitments for Byron Station, Units 1 and 2 (TAC No. M88094)," dated June 27,1996.

During the March / April 1996 NRC survey of spent fuel practices and spent fuel pool cooling system design and current licensing basis, Commonwealth Edison (Comed) Byron Station committed to clarify, in its next UFSAR update, its description of refueling activities including identification of a full core ofiload practice as routine. In the reference letter, the NRC requested that Comed confirm the commitment regarding the UFSAR l update and indicate its projected completion date. Comed was requested to provide a l response within 30 days of receipt of the letter.

The UFS AR update for clarifying refueling activities at Byron Station has been approved.

In the update, UFSAR Subsections 9.1.2.3 and 9.1.3.1 specifically identify that routine refueling activities include a full core temporary ofiload. This update will be provided to the NRC in December 1996 as part of the Byron /Braidwood UFSAR Revision 6 submittal.

I 9608060221 960725 I PDR ADOCK 05000454 t

P PDR (J) 9 l

(p396b%tri 960208. doc 072596) l A Emcom Compan) l

1

, e Byron Ltr. 96-0208 July 25,1996 Page 2 If you have any questions regarding this correspondence, please contact Marcia Lesniak, Nuclear Licensing Administrator, at (708) 663-6484.

Y Sincerely, l

j

[

K. L. Ko r i Station Manager

! Byron Nuclear Power Station 4

i KLK/ML/rp i

cc: G. Dick, Byron Project Manager-NRR H. Miller, Regional Administrator-RIII H. Peterson, Senior Resident Inspector-Byron Office of Nuclear Safety -IDNS i