{{#Wiki_filter:R
        ' '1
: Georgia Power Company
      <  -N              40 invemess Conter Pcrkway
                  *- ' Post Offee Dox 1295
            .?.
* Dirminghtm, Alibama 35201-
                        ' Tdephone 205 877 7122
: c. K. uccoy      -
Georgia b Power Vce PresKient, Nuclear Vogtle Prosect                                              the souttern electrc System December 13, 1989 ELV-01148 0161 Docket Nos.            50-424 50-425' Director, Office of Resource Management U. S. Nuclear Regulatory Commission
                    ' Washington, D. C. '20555 4
Gentlemen:
                                                      .V0GTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORTS Enclosed are the November,1989 monthly operating reports for Vogtle Units 1 and
: 2. 'These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, C. K. McCoy CKM/NJS/gm Enclosures xc:        Georaia Power Company                                                                    i Mr. C. K. McCoy                                                                            1 Mr. G. Bockhold, Jr.                                                                      I
                                -Mr. P..D. Rushton Mr. R. M. Odom NORMS'
                                ~U. S. Nuclear Reaulatory Commission                                                      !
  ,                              Mr. S. D. Ebneter, Regional Administrator                                                ;
Mr. J. B. Hopkins, Licensing Project Manager, NRR                                          i Mr. J. F. Rogge, Senior Resident Inspector, Vogtle Document Control Desk U
8912210051 891130
                  +PDR          ADOCK 05000424                                                                      .
iR                              PDC                                                              ,
                                                                                                                        )
 
r.--.
          <4;        : c.
[
ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTilLY OPERATING REPORT FOR NOVEMBER, 1989 TABLE OF CONTENTS NARRATIVE. REPORT                                                Page Vl-1 OPERATING DATA REPORT                                            Page Vl-2 AVERAGE DAILY POWER LEVEL                                        Page VI-3 UNIT SiluTDOWNS AND POWER' REDUCTIONS                            Page VI-4
                                                                                                      .l i
l l
l~
3 i
 
              ;n..
  ,            8 NARRATIVE REPORT        DOCKET NO. 50-424 UNIT 1            DATE:        DECEMBER 5 1989 COMPLETEDBY:'J.C.WILL}AMS TELEPHONE:    (404) 826-4279 NOVEMBER 1          00:00 -UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
        . NOVEMBER 10          08:20    POWER REDUCTION TO 90% DUE TO FAILED MFP "B" SPEED PICKUP # 2.
          . NOVEMBER 10.        19:54    POWER REDUCTION TO 72% TO REPLACE MFP "B" SPEED PICKUP # 2.
          ' NOVEMBER 12          00:30    COMMENCE RAMP TO FULL POWER.                                      l
        ' NOVEMBER 12          14:00    UNIT 1 AT FULL POWER.
NOVEMBER 28          12:38    POWER REDUCTION TO 70% TO REPLACE MFP "B" SPEED PICKUP # 1.
NOVEMBER'29          18:04    COMMENCE RAMP TO FULL POWER.
NOVEMBER 30          03:00    UNIT 1 AT 100% POWER.
        . NOVEMBER 30          23:59    UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS, L                                                                                                        i l
l l
1 l
Vl-1
 
T                                                                                                                    .;
s'y          1', _ .                                                                                              l n ._                              .
t                                                                                                                        1 l
OPERATING DATA REPORT              DOCKET NO. 50-424-                          1 DATE: DECEMBER'S                            I
      -                                                                      COMPLETED BY:  J.d.1989WILLIAMS'              l TELEPHONE: (404) 826-4279
                  ~0PERATING STATUS                                                                                      .
l li UNIT NAME:-        .
VEGP UNIT 1
        -2.' REPORT-PERIOD:
NOVEMBER 89
: 3. LICENSED THERMAL POWER MWt :                                    3411
        .4.        NAMEPLATE RATING-(GROSS (MWe :                          1148
: 5. DESIGN ELECTRICAL RATING (N T MWe):                            1101-
  "      6.. MAXIMUM DEPENDABLE: CAPACITY (GROSS MWe):                      1137 7.-MAXIMUM DEPENDABLE CAPACITY                                    1083 8.-IF CHANGES OCCUR INRATINGS          CAPACITY        (NET MWe):
                  ,(ITEMS 3 THROUGH 7) SINCF-LAST REPORT, GIVE REASONS: N/A l
9.-POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):              NO RESTRICTIONS
: 10. REASONS FOR RESTRICTION, IF ANY:-                              N/A                                        .
THIS MONTH          YR. TO DATE        CUMULATIVE
: 11. HOURS IN REPORTING PERIOD: .                              720                8016              21937 12~. NUMBER OF HOURS REACTOR WAS CRITICAL:                  720.0              7669.0            18544.1      <
f
        -13. REACTOR RESERVE SHUTDOWN HOURS:                            0.0                    0.                .0
: 14. HOURS-GENERATOR ON-LINE:                                720.0              7533.1            18025.9      r
: 15. UNIT RESERVE SHUTDOWN HOURS:                              0.0~                  0                  0=
: 16. GROSS: THERMAL-ENERGY GENERATED MWH                    2391716-          25022147            59453303
        -17.-GROSS ELEC. ENERGY GENERATED (M H):):                  805480            8300570-          19690640
: 18. NET ELEC.' ENERGY GENERATED-(MWH :                      768940            7886420-          18598550 L      419. REACTOR SERVICE FACTOR                                  100.0%              95.7%              84.5%  ,
h        20.~~ REACTOR AVAILABILITY FACTOR 100.0%-              95.7%              84.5%'  !
L        21. UNIT-SERVICE FACTOR:                                    100.0%              94.0%              82.2%'
l-      -22. UNIT AVAILABILITY FACTOR:                                100.0%              94.0%              82.2%    >
l=      23. UNIT CAPACITY FACTOR USING MDC NET):                      98.6%              90.8%              78.3%
: 24. UNIT CAPACITY FACTOR USING DER NET):                      97.0%              89.4%              77.0%
L25. UNIT-FORCED OUTAGE RA E:                        -        0.0%                6.0%              11.4%
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):                            ,
REFUELING -- FEB 23 -- 45 DAYS E        27..IF' SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                    N/A y
L V1-2
 
h
{ ,-                  ,-
            >    O'h '
UNIT 1 AVERAGE DAILY                DOCKET NO. 50-424 POWER LEVEL                DATE:        DECEMBER 5 1989 COMPLETED BY: J.C.WILL}AMS TELEPHONE:  (404) 826-4279 DAY                      Net MW                        j 1  .........              1090 *-                'i 2  .........              1096
* 3  .........              1098
* 4  .........              1099
* 5  ....,....              1100.*
6  .........              1090
* 7  .........              1087
* 8  .........              1086 *                      !
9  .........              1091
* 10  .........              978
                                                ~11  .........              760 j,                                              12  .........              1037                    -l' p                                                13 .....-....              1095
* 14 .........              1098
* 15 .........              1091
* 16 .........=              1104
* L                                                17 . . . . . . . . . . 1113
* q 18 .........              ~1111 *:
19 .........              '1106-*                      l 20 .........              1105
* i 21 .........              1102
* l 22 .........              1109
* 23 .........              1110
* i 24 .........              1113 *                    :
l-25..........              1105
* H                                                26 .........              1101
* 27 .........              1101 *                      ,
28 .........                947                        .
29 .........                818                        l l
30 .........              1097
* j L                                                                                                      !
L 1
E
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS                        !
1.
f
                                                                                                    'h I
I VI-3                            i
 
  .V UNIT SHUTDOWNS AND POWER RED'JCTIONS          DOCKET NO.      50-424 DATE:          DECEMBER 5 1989 UNIT NAME:    VEGP UNIT 1              COMPLETED BY: J.C. WILLIAMS                )
TELEPHONE:      (404) 826-4279 REPORT MONTH NOVEMBER 89 i
      'l-                                    R  M              5                                            ~j E  E              Y T            A  T  LICENSEE    SC          .
Y            S  H  EVENT      T 0- COMPONENT        CAUSE & CORRECTIVE        !
P  DURATION  0  0  REPORT    ED    CODE                ACTION TO          !
            -NO.      DATE    E  (HOURS)  N  D  NUMBER    HE  (SUBCODE)        PREVENT RECURRENCE        !
89-11    11/10  .S      0      A  5    N\A        JK    SIC                SEE BELOW 89-12' 11/28      -S      0    .A. 5    N\A        JK    SIC                SEE BELOW i
l F: FORCED            REASON:                        METHOD:                  EVENTS REPORTED INVOLVE  i S: SCHEDULED                                          1 - MANUAL              A GREATER THAN 20%        ,
A-EQUIPMENT        FAILURE B-MAINTENANCE OR-TEST          (EXPLAIN) 2 - MANUAL            SCRAM REDUCTION  IN AVERAGE    !
C-REFUELING                    3 - AUTO. SCRAM          DAILY. POWER LEVEL FOR    !
D-REGULATORY RESTRICTION        4 - CONTINUATIONS        THE PRECEDING 24 HOURS.  !
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION                                  l F-ADMINISTRATIVE                9 - OTHER (EXPLAIN)                                ,
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN) 89-11 CAUSE: POWER REDUCTION DUE TO FAILED SPEED PICKUP # 2 ON MAIN FEEDPUMP              "B".
l      CORRECTIVE ACTION: REPLACED SPEED PICKUP # 2 ON MAIN FEEDPUMP            "B".
89-12 CAUSE: POWER REDUCTION-DUE TO FAILED SPEED PICKUP # 1 ON MAIN FEEDPUMP              "B".                ,
      -CORRECTIVE ACTION: REPLACED-SPEED PICKUP # 1 ON MAIN FEEDPUMP            "B".                          i VI-4 L
 
t ENCLOSURE 2 V0GTLE ELECTRIC OENERATING PLANT - UNIT 2            l MONTilLY OPERATING REPORT FOR NOVEMBER,1989 TABLE OF CONTENTS                        l i
l NARRATIVE REPORT                                                Page V2-1 OPERATING DATA REPORT                                          Page V2-2 AVERAGE DAILY POWER LEVEL                                      Page V2-3 UNIT SilVIDOWNS AND POWER REDUCTIONS                            Page V2-4  ;
I i
I o
k l
o
 
      .~
NARRATIVE REPORT        DOCKET NO.-  50-425 UNIT 2            DATE:        DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS                    I TELEPHONE:    (404)-826-4279 1
NOVEMBER 1  00:00  UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.                    '1
    . NOVEMBER 5  12:23  MANUAL REACTOR TRIP DUE TO LOSS OF MFP "A". UNIT STABILIZED AT MODE 3 NOVEMBER 5  23:27 . UNIT 2 ENTERS MODE 2.                                                  +
NOVEMBER 6  00:16  UNIT 2 REACTOR CRITICAL.
NOVEMBER 6-  03:51  UNIT-2 ENTERS MODE 1.                                                  :
NOVEMBER 6  06:22  UNIT 2 TIED TO THE GRID.
NOVEMBER 7. 06:33  UNIT 2-AT 100% POWER .
NOVEMBER 20  11:38  POWER REDUCTION TO 95% FOR FEEDWATER HEATER AND HDT "B" MAINTENANCE. 1
    ' NOVEMBER 24  04:00  COMMENCE RAMP T0 FULL POWER.
    ' NOVEMBER 24- 07:00  UNIT 2LAT 100% POWER.
NOVEMBER 28  03:01  POWER REDUCTION TO 91% DUE TO HDT "B" HIGH LEVEL INDICATION.
NOVEMBER 28  05:35  COMMENCE RAMP TO FULL POWER.
1 NOVEMBER 28  17:48  UNIT 2 AT 100% POWER.
NOVEMBER 30  23:59  UNIT 2 AT 100% POWER WITH.N0 OPERATIONAL PROBLEMS.
t V2-1 l
l
 
    +
a          .
OPERATING DATA REPORT                DOCKET NO. LO-42!
DATE: DECEM0ER 5
                                                                                    -COMPLETED BY:  J.E.1989 WILLIAMS
          ,            OPERATING STATUS                                                                                              r
: l. UNIT NAME:1                                                      VEGP UNIT 2                                    1
: 2. REPORT PERIOD:' -                .
NOVEMBER 1989 3.-LICENSED THERMAL POWER (MWt):                                    3411
                -40 NAMEPLATE RATING'                                                1148
                -5. DESIGN ELECTRICAL    RATING NET  (GROSS MWe :      MWe):            1101 6.3 MAXIMUM DEPENDABLE CAPACI Y GROS MWe):                          1137                                            ,
: 7. MAXIMUM DEPENDABLE CAPACITY NET MWe                              1083-                                          f
: 8. IF CHANGES OCCUR IN CAPACITY-RATINGS):                                                                      1
                      '(ITEMS 3 THROUGHf7) SINCE LAST REPORT, GIVE REASONS:                                                    .;
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):              No restrictions                                !
              '10. REASONS FOR RESTRICTION, IF ANY:                                  N/A THIS MONTH          YR. TO DATE        CUMULATIVE          ;
            .11. HOURS IN REPORTING PERIOD:                                    720                4681-                4681-      !
l            112.-NUMBER OF HOURS REACTOR WAS CRITICAL:                      '708.1              4489.9            .4489.9-          -
H
: 13. REACTOR RESERVE SHUTDOWN. HOURS:                            0.0                0.0            .
0.0    .1
:14. HOURS-GENERATOR ON-LINE:                                    702.0-            4417.7              4417.7        !
15.l UNIT-RESERVE SHUTDOWN HOURS:                                0.0                0.0                  0.0        !
: 16. GROSS THERMAL ENERGY' GENERATED          H):          2350213            14871541          14871541      -i
            '17. GROSS ELEC. ENERGY GENERATED                :              798539            5012780~            5012780-        '
l
: 18. NET ELEC. ENERGY GENERATED'(M          :                762059            4783630            4783630          i 1
              -19. REACTOR SERVICE-FACTOR                                      98.3%              95.9%                95.9%' :!  '
            .20.TREACTOR AVAILABILITY FACTOR                                  98.3%'              95.9%                95.9%-
21 ' UNIT! SERVICE FAC10R:-                                    97.5%              94.4%~              94.4%      !
  =
: 22. UNIT' AVAILABILITY FACTOR:                                  97.5%              94.4%                94.4%      l
            '23.:. UNIT CAPACITY- FACTOR USING MDC NET :                      97.7%              94.4%                94.4%  =i
: 24. UNIT CAPACITY FACTOR USING DER NET :                        96,1%.              92.8%                92.8%      i
: 25. UNIT' FORCED OUTAGE RA E::      -.    -
                                                                ~.              2.5%                2.4%                2.4%-
L              26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):
L
            '27.IF.SHUTDOWNAT-ENDOFREPORTPERIOD,ESTIMATEDDdTEOFSTARTUP:
N/A                    .i
: l.                                                                                                                                  !
,                                                                                                                                    i l
l l
Li V2-2
 
O .j.T ,
    - c.  . .
l
            .                                                            l
                                                                          )
i UNIT 2 AVERAGE DAILY      DOCKET NO. 50-425            l l                        POWER LEVEL      DATE:      DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS TELEPHONE:  (404) 826-4279 DAY            Net MW                    l 1 .........      1113 *                  )
2 .........      1117
* 3 .........      1119 *                  ;
4 .........      1121 *                  !
      ,                        5 .........      554                    .
it.  '
6 .........      430                    )
7 .........      1061                      ,
8 .........      1074                    j 1088 *
                                                                          ~
9 .........
10 .........      1105
* 11 .........      1103
* 12 .........      1101
* 13 .........      1104
* 14 .........      1102
* 15 .........      1093
* 16 .........      1101
* 17 .........      1123
* 1 18 .........      1121
* 19 .........      1121
* 20 .........      1079 21 .........      1042 22 .........      1057                  ;
23 .........      1057 24 .........      1108
* 25 .........      1122
* 26 .........      1116
* 27 .........      1114
* 2P .........      1057 e                              29 .........      1122 +
30 .........      1124 *
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS 3-V2-3 1
l
 
o  ,
UNIT SHUTDOWNS AND POWER REDUCTIONS            DOCKET NO. 50-425 DATE:      DECEMBER 5 1989 VNIT NAME:    VEGP UNIT 2              COMPLETED BY: J.C. WILLIAMS          ;
TELEPHONE:  (404) 826-4279            i REPORT MONTH NOVEMBER 89 R  M              s E  E              Y T            A  T  LICENSEE    SC Y            S  H  EVENT      T0  COMPONENT    CAUSE & CORRECT 10 P  DURATION  0  0  REPORT    ED    CODE              ACTION TO NO.      DA1E    E  (HOURS)  N  D  NUMBER    HE  (SUBCODE)    PREVENT RECURRENCE 89-12    11/05    F    17.99    A  2  2-89-29      SJ    LCV              SEE BELOW I F: FORCED          REASON:                        METHOD:              EVENTS REPORTED INVOLVE S: SCHEDULED                                        1 - MANUAL          A GREATER THAN 20%
A-EQUIPMENT        FAILURE (EXPLAIN) 2 - MANUAL SCRAM
!                    B-MAINTENANCE OR TEST                                REDUCTION IN AVERAGE I
C-REFUELING                    3 - AUTO. SCRAM      DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION        4 - CONTINVATIONS    THE PRECEDING 24 HOURS.
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE                9 - OTHER (EXPLAIN)
L                    G-OPERATIONAL ERROR (EXPLAIN) l                    H-0THER (EXPLAIN) 89-12 CAUSE: MANUAL REACTOR TRIP DVE TO LOW MAIN FEEDWATER PUMP SUCTION CAUSING MAIN FEEDWATER PUMP "A" TO TRIP.
CORRECTIVE ACTION: DEFECTIVE 0-RING IN VALVE (2LV-4333 ACTUATOR WAS REMOVED AND REPLACED TO BRING VALVE TO FULL) OPERATIONA STATUS.
1 i
V2-4
 
                                                    ._  _                .=.              .    . . __  .
l i
(ATTACHMENT 1)
VEGP UNITS 1 & 2                              DATE:                  DECEMBER 5. 1989 COMPLETED BY: J. C. WILLIAMS TELEPHONE:              (404) 826-4279            :
CHALLENGES TO PORV OR SAFETY VALVES L
VT EY NP                                                                          ,
DATE        TAG NUMBER      TE                          DESCRIPTION                                    ,
l THERE WERE NO CHALLENGES TO PORY OR SAFETY VALVES.                  ,
4 EVENT TYPE :
* A-AUTOMATIC M-MANUAL 4                    -        -_    ___                        ,        ___  . . , . . . _.    --    -  r.}}

Latest revision as of 12:00, 18 February 2020

Monthly Operating Repts for Nov 1989 for Vogtle Units 1 & 2. W/891213 Ltr
ML19332G316
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/30/1989
From: Mccoy C, Williams J
GEORGIA POWER CO.
To:
NRC
References
ELV-01148, ELV-1148, NUDOCS 8912210051
Download: ML19332G316 (12)


Text

R

' '1

Georgia Power Company

< -N 40 invemess Conter Pcrkway

  • - ' Post Offee Dox 1295

.?.

  • Dirminghtm, Alibama 35201-

' Tdephone 205 877 7122

c. K. uccoy -

Georgia b Power Vce PresKient, Nuclear Vogtle Prosect the souttern electrc System December 13, 1989 ELV-01148 0161 Docket Nos. 50-424 50-425' Director, Office of Resource Management U. S. Nuclear Regulatory Commission

' Washington, D. C. '20555 4

Gentlemen:

.V0GTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORTS Enclosed are the November,1989 monthly operating reports for Vogtle Units 1 and

2. 'These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/NJS/gm Enclosures xc: Georaia Power Company i Mr. C. K. McCoy 1 Mr. G. Bockhold, Jr. I

-Mr. P..D. Rushton Mr. R. M. Odom NORMS'

~U. S. Nuclear Reaulatory Commission  !

, Mr. S. D. Ebneter, Regional Administrator  ;

Mr. J. B. Hopkins, Licensing Project Manager, NRR i Mr. J. F. Rogge, Senior Resident Inspector, Vogtle Document Control Desk U

8912210051 891130

+PDR ADOCK 05000424 .

iR PDC ,

)

r.--.

<4;  : c.

[

ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTilLY OPERATING REPORT FOR NOVEMBER, 1989 TABLE OF CONTENTS NARRATIVE. REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SiluTDOWNS AND POWER' REDUCTIONS Page VI-4

.l i

l l

l~

3 i

n..

, 8 NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: DECEMBER 5 1989 COMPLETEDBY:'J.C.WILL}AMS TELEPHONE: (404) 826-4279 NOVEMBER 1 00:00 -UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

. NOVEMBER 10 08:20 POWER REDUCTION TO 90% DUE TO FAILED MFP "B" SPEED PICKUP # 2.

. NOVEMBER 10. 19:54 POWER REDUCTION TO 72% TO REPLACE MFP "B" SPEED PICKUP # 2.

' NOVEMBER 12 00:30 COMMENCE RAMP TO FULL POWER. l

' NOVEMBER 12 14:00 UNIT 1 AT FULL POWER.

NOVEMBER 28 12:38 POWER REDUCTION TO 70% TO REPLACE MFP "B" SPEED PICKUP # 1.

NOVEMBER'29 18:04 COMMENCE RAMP TO FULL POWER.

NOVEMBER 30 03:00 UNIT 1 AT 100% POWER.

. NOVEMBER 30 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS, L i l

l l

1 l

Vl-1

T .;

s'y 1', _ . l n ._ .

t 1 l

OPERATING DATA REPORT DOCKET NO. 50-424- 1 DATE: DECEMBER'S I

- COMPLETED BY: J.d.1989WILLIAMS' l TELEPHONE: (404) 826-4279

~0PERATING STATUS .

l li UNIT NAME:- .

VEGP UNIT 1

-2.' REPORT-PERIOD:

NOVEMBER 89

3. LICENSED THERMAL POWER MWt : 3411

.4. NAMEPLATE RATING-(GROSS (MWe : 1148

5. DESIGN ELECTRICAL RATING (N T MWe): 1101-

" 6.. MAXIMUM DEPENDABLE: CAPACITY (GROSS MWe): 1137 7.-MAXIMUM DEPENDABLE CAPACITY 1083 8.-IF CHANGES OCCUR INRATINGS CAPACITY (NET MWe):

,(ITEMS 3 THROUGH 7) SINCF-LAST REPORT, GIVE REASONS: N/A l

9.-POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:- N/A .

THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: . 720 8016 21937 12~. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 7669.0 18544.1 <

f

-13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0. .0

14. HOURS-GENERATOR ON-LINE: 720.0 7533.1 18025.9 r
15. UNIT RESERVE SHUTDOWN HOURS: 0.0~ 0 0=
16. GROSS: THERMAL-ENERGY GENERATED MWH 2391716- 25022147 59453303

-17.-GROSS ELEC. ENERGY GENERATED (M H):): 805480 8300570- 19690640

18. NET ELEC.' ENERGY GENERATED-(MWH : 768940 7886420- 18598550 L 419. REACTOR SERVICE FACTOR 100.0% 95.7% 84.5% ,

h 20.~~ REACTOR AVAILABILITY FACTOR 100.0%- 95.7% 84.5%'  !

L 21. UNIT-SERVICE FACTOR: 100.0% 94.0% 82.2%'

l- -22. UNIT AVAILABILITY FACTOR: 100.0% 94.0% 82.2% >

l= 23. UNIT CAPACITY FACTOR USING MDC NET): 98.6% 90.8% 78.3%

24. UNIT CAPACITY FACTOR USING DER NET): 97.0% 89.4% 77.0%

L25. UNIT-FORCED OUTAGE RA E: - 0.0% 6.0% 11.4%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): ,

REFUELING -- FEB 23 -- 45 DAYS E 27..IF' SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A y

L V1-2

h

{ ,- ,-

> O'h '

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: DECEMBER 5 1989 COMPLETED BY: J.C.WILL}AMS TELEPHONE: (404) 826-4279 DAY Net MW j 1 ......... 1090 *- 'i 2 ......... 1096

  • 3 ......... 1098
  • 4 ......... 1099
  • 5 ....,.... 1100.*

6 ......... 1090

  • 7 ......... 1087
  • 8 ......... 1086 *  !

9 ......... 1091

  • 10 ......... 978

~11 ......... 760 j, 12 ......... 1037 -l' p 13 .....-.... 1095

  • 14 ......... 1098
  • 15 ......... 1091
  • 16 .........= 1104
  • L 17 . . . . . . . . . . 1113
  • q 18 ......... ~1111 *:

19 ......... '1106-* l 20 ......... 1105

  • i 21 ......... 1102
  • l 22 ......... 1109
  • 23 ......... 1110
  • i 24 ......... 1113 *  :

l-25.......... 1105

  • H 26 ......... 1101
  • 27 ......... 1101 * ,

28 ......... 947 .

29 ......... 818 l l

30 ......... 1097

  • j L  !

L 1

E

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS  !

1.

f

'h I

I VI-3 i

.V UNIT SHUTDOWNS AND POWER RED'JCTIONS DOCKET NO. 50-424 DATE: DECEMBER 5 1989 UNIT NAME: VEGP UNIT 1 COMPLETED BY: J.C. WILLIAMS )

TELEPHONE: (404) 826-4279 REPORT MONTH NOVEMBER 89 i

'l- R M 5 ~j E E Y T A T LICENSEE SC .

Y S H EVENT T 0- COMPONENT CAUSE & CORRECTIVE  !

P DURATION 0 0 REPORT ED CODE ACTION TO  !

-NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE  !

89-11 11/10 .S 0 A 5 N\A JK SIC SEE BELOW 89-12' 11/28 -S 0 .A. 5 N\A JK SIC SEE BELOW i

l F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE i S: SCHEDULED 1 - MANUAL A GREATER THAN 20% ,

A-EQUIPMENT FAILURE B-MAINTENANCE OR-TEST (EXPLAIN) 2 - MANUAL SCRAM REDUCTION IN AVERAGE  !

C-REFUELING 3 - AUTO. SCRAM DAILY. POWER LEVEL FOR  !

D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.  !

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION l F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) ,

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-11 CAUSE: POWER REDUCTION DUE TO FAILED SPEED PICKUP # 2 ON MAIN FEEDPUMP "B".

l CORRECTIVE ACTION: REPLACED SPEED PICKUP # 2 ON MAIN FEEDPUMP "B".

89-12 CAUSE: POWER REDUCTION-DUE TO FAILED SPEED PICKUP # 1 ON MAIN FEEDPUMP "B". ,

-CORRECTIVE ACTION: REPLACED-SPEED PICKUP # 1 ON MAIN FEEDPUMP "B". i VI-4 L

t ENCLOSURE 2 V0GTLE ELECTRIC OENERATING PLANT - UNIT 2 l MONTilLY OPERATING REPORT FOR NOVEMBER,1989 TABLE OF CONTENTS l i

l NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SilVIDOWNS AND POWER REDUCTIONS Page V2-4  ;

I i

I o

k l

o

.~

NARRATIVE REPORT DOCKET NO.- 50-425 UNIT 2 DATE: DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS I TELEPHONE: (404)-826-4279 1

NOVEMBER 1 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS. '1

. NOVEMBER 5 12:23 MANUAL REACTOR TRIP DUE TO LOSS OF MFP "A". UNIT STABILIZED AT MODE 3 NOVEMBER 5 23:27 . UNIT 2 ENTERS MODE 2. +

NOVEMBER 6 00:16 UNIT 2 REACTOR CRITICAL.

NOVEMBER 6- 03:51 UNIT-2 ENTERS MODE 1.  :

NOVEMBER 6 06:22 UNIT 2 TIED TO THE GRID.

NOVEMBER 7. 06:33 UNIT 2-AT 100% POWER .

NOVEMBER 20 11:38 POWER REDUCTION TO 95% FOR FEEDWATER HEATER AND HDT "B" MAINTENANCE. 1

' NOVEMBER 24 04:00 COMMENCE RAMP T0 FULL POWER.

' NOVEMBER 24- 07:00 UNIT 2LAT 100% POWER.

NOVEMBER 28 03:01 POWER REDUCTION TO 91% DUE TO HDT "B" HIGH LEVEL INDICATION.

NOVEMBER 28 05:35 COMMENCE RAMP TO FULL POWER.

1 NOVEMBER 28 17:48 UNIT 2 AT 100% POWER.

NOVEMBER 30 23:59 UNIT 2 AT 100% POWER WITH.N0 OPERATIONAL PROBLEMS.

t V2-1 l

l

+

a .

OPERATING DATA REPORT DOCKET NO. LO-42!

DATE: DECEM0ER 5

-COMPLETED BY: J.E.1989 WILLIAMS

, OPERATING STATUS r

l. UNIT NAME:1 VEGP UNIT 2 1
2. REPORT PERIOD:' - .

NOVEMBER 1989 3.-LICENSED THERMAL POWER (MWt): 3411

-40 NAMEPLATE RATING' 1148

-5. DESIGN ELECTRICAL RATING NET (GROSS MWe : MWe): 1101 6.3 MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 1137 ,

7. MAXIMUM DEPENDABLE CAPACITY NET MWe 1083- f
8. IF CHANGES OCCUR IN CAPACITY-RATINGS): 1

'(ITEMS 3 THROUGHf7) SINCE LAST REPORT, GIVE REASONS: .;

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): No restrictions  !

'10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE  ;

.11. HOURS IN REPORTING PERIOD: 720 4681- 4681-  !

l 112.-NUMBER OF HOURS REACTOR WAS CRITICAL: '708.1 4489.9 .4489.9- -

H

13. REACTOR RESERVE SHUTDOWN. HOURS: 0.0 0.0 .

0.0 .1

14. HOURS-GENERATOR ON-LINE: 702.0- 4417.7 4417.7  !

15.l UNIT-RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0  !

16. GROSS THERMAL ENERGY' GENERATED H): 2350213 14871541 14871541 -i

'17. GROSS ELEC. ENERGY GENERATED  : 798539 5012780~ 5012780- '

l

18. NET ELEC. ENERGY GENERATED'(M  : 762059 4783630 4783630 i 1

-19. REACTOR SERVICE-FACTOR 98.3% 95.9% 95.9%' :! '

.20.TREACTOR AVAILABILITY FACTOR 98.3%' 95.9% 95.9%-

21 ' UNIT! SERVICE FAC10R:- 97.5% 94.4%~ 94.4%  !

=

22. UNIT' AVAILABILITY FACTOR: 97.5% 94.4% 94.4% l

'23.:. UNIT CAPACITY- FACTOR USING MDC NET : 97.7% 94.4% 94.4% =i

24. UNIT CAPACITY FACTOR USING DER NET : 96,1%. 92.8% 92.8% i
25. UNIT' FORCED OUTAGE RA E:: -. -

~. 2.5% 2.4% 2.4%-

L 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):

L

'27.IF.SHUTDOWNAT-ENDOFREPORTPERIOD,ESTIMATEDDdTEOFSTARTUP:

N/A .i

l.  !

, i l

l l

Li V2-2

O .j.T ,

- c. . .

l

. l

)

i UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 l l POWER LEVEL DATE: DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS TELEPHONE: (404) 826-4279 DAY Net MW l 1 ......... 1113 * )

2 ......... 1117

  • 3 ......... 1119 *  ;

4 ......... 1121 *  !

, 5 ......... 554 .

it. '

6 ......... 430 )

7 ......... 1061 ,

8 ......... 1074 j 1088 *

~

9 .........

10 ......... 1105

  • 11 ......... 1103
  • 12 ......... 1101
  • 13 ......... 1104
  • 14 ......... 1102
  • 15 ......... 1093
  • 16 ......... 1101
  • 17 ......... 1123
  • 1 18 ......... 1121
  • 19 ......... 1121
  • 20 ......... 1079 21 ......... 1042 22 ......... 1057  ;

23 ......... 1057 24 ......... 1108

  • 25 ......... 1122
  • 26 ......... 1116
  • 27 ......... 1114
  • 2P ......... 1057 e 29 ......... 1122 +

30 ......... 1124 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS 3-V2-3 1

l

o ,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: DECEMBER 5 1989 VNIT NAME: VEGP UNIT 2 COMPLETED BY: J.C. WILLIAMS  ;

TELEPHONE: (404) 826-4279 i REPORT MONTH NOVEMBER 89 R M s E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECT 10 P DURATION 0 0 REPORT ED CODE ACTION TO NO. DA1E E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 89-12 11/05 F 17.99 A 2 2-89-29 SJ LCV SEE BELOW I F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED 1 - MANUAL A GREATER THAN 20%

A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM

! B-MAINTENANCE OR TEST REDUCTION IN AVERAGE I

C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINVATIONS THE PRECEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

L G-OPERATIONAL ERROR (EXPLAIN) l H-0THER (EXPLAIN) 89-12 CAUSE: MANUAL REACTOR TRIP DVE TO LOW MAIN FEEDWATER PUMP SUCTION CAUSING MAIN FEEDWATER PUMP "A" TO TRIP.

CORRECTIVE ACTION: DEFECTIVE 0-RING IN VALVE (2LV-4333 ACTUATOR WAS REMOVED AND REPLACED TO BRING VALVE TO FULL) OPERATIONA STATUS.

1 i

V2-4

._ _ .=. . . . __ .

l i

(ATTACHMENT 1)

VEGP UNITS 1 & 2 DATE: DECEMBER 5. 1989 COMPLETED BY: J. C. WILLIAMS TELEPHONE: (404) 826-4279  :

CHALLENGES TO PORV OR SAFETY VALVES L

VT EY NP ,

DATE TAG NUMBER TE DESCRIPTION ,

l THERE WERE NO CHALLENGES TO PORY OR SAFETY VALVES. ,

4 EVENT TYPE :

  • A-AUTOMATIC M-MANUAL 4 - -_ ___ , ___ . . , . . . _. -- - r.