Monthly Operating Repts for Nov 1989 for Vogtle Units 1 & 2. W/891213 Ltr
ML19332G316
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/30/1989
From: Mccoy C, Williams J
GEORGIA POWER CO.
To:
NRC
References
ELV-01148, ELV-1148, NUDOCS 8912210051
Download: ML19332G316 (12)


Text

R

' '1

Georgia Power Company

< -N 40 invemess Conter Pcrkway

  • - ' Post Offee Dox 1295

.?.

  • Dirminghtm, Alibama 35201-

' Tdephone 205 877 7122

c. K. uccoy -

Georgia b Power Vce PresKient, Nuclear Vogtle Prosect the souttern electrc System December 13, 1989 ELV-01148 0161 Docket Nos. 50-424 50-425' Director, Office of Resource Management U. S. Nuclear Regulatory Commission

' Washington, D. C. '20555 4

Gentlemen:

.V0GTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORTS Enclosed are the November,1989 monthly operating reports for Vogtle Units 1 and

2. 'These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/NJS/gm Enclosures xc: Georaia Power Company i Mr. C. K. McCoy 1 Mr. G. Bockhold, Jr. I

-Mr. P..D. Rushton Mr. R. M. Odom NORMS'

~U. S. Nuclear Reaulatory Commission  !

, Mr. S. D. Ebneter, Regional Administrator  ;

Mr. J. B. Hopkins, Licensing Project Manager, NRR i Mr. J. F. Rogge, Senior Resident Inspector, Vogtle Document Control Desk U

8912210051 891130

+PDR ADOCK 05000424 .

iR PDC ,

)

r.--.

<4;  : c.

[

ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTilLY OPERATING REPORT FOR NOVEMBER, 1989 TABLE OF CONTENTS NARRATIVE. REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SiluTDOWNS AND POWER' REDUCTIONS Page VI-4

.l i

l l

l~

3 i

n..

, 8 NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: DECEMBER 5 1989 COMPLETEDBY:'J.C.WILL}AMS TELEPHONE: (404) 826-4279 NOVEMBER 1 00:00 -UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

. NOVEMBER 10 08:20 POWER REDUCTION TO 90% DUE TO FAILED MFP "B" SPEED PICKUP # 2.

. NOVEMBER 10. 19:54 POWER REDUCTION TO 72% TO REPLACE MFP "B" SPEED PICKUP # 2.

' NOVEMBER 12 00:30 COMMENCE RAMP TO FULL POWER. l

' NOVEMBER 12 14:00 UNIT 1 AT FULL POWER.

NOVEMBER 28 12:38 POWER REDUCTION TO 70% TO REPLACE MFP "B" SPEED PICKUP # 1.

NOVEMBER'29 18:04 COMMENCE RAMP TO FULL POWER.

NOVEMBER 30 03:00 UNIT 1 AT 100% POWER.

. NOVEMBER 30 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS, L i l

l l

1 l

Vl-1

T .;

s'y 1', _ . l n ._ .

t 1 l

OPERATING DATA REPORT DOCKET NO. 50-424- 1 DATE: DECEMBER'S I

- COMPLETED BY: J.d.1989WILLIAMS' l TELEPHONE: (404) 826-4279

~0PERATING STATUS .

l li UNIT NAME:- .

VEGP UNIT 1

-2.' REPORT-PERIOD:

NOVEMBER 89

3. LICENSED THERMAL POWER MWt : 3411

.4. NAMEPLATE RATING-(GROSS (MWe : 1148

5. DESIGN ELECTRICAL RATING (N T MWe): 1101-

" 6.. MAXIMUM DEPENDABLE: CAPACITY (GROSS MWe): 1137 7.-MAXIMUM DEPENDABLE CAPACITY 1083 8.-IF CHANGES OCCUR INRATINGS CAPACITY (NET MWe):

,(ITEMS 3 THROUGH 7) SINCF-LAST REPORT, GIVE REASONS: N/A l

9.-POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:- N/A .

THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: . 720 8016 21937 12~. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 7669.0 18544.1 <

f

-13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0. .0

14. HOURS-GENERATOR ON-LINE: 720.0 7533.1 18025.9 r
15. UNIT RESERVE SHUTDOWN HOURS: 0.0~ 0 0=
16. GROSS: THERMAL-ENERGY GENERATED MWH 2391716- 25022147 59453303

-17.-GROSS ELEC. ENERGY GENERATED (M H):): 805480 8300570- 19690640

18. NET ELEC.' ENERGY GENERATED-(MWH : 768940 7886420- 18598550 L 419. REACTOR SERVICE FACTOR 100.0% 95.7% 84.5% ,

h 20.~~ REACTOR AVAILABILITY FACTOR 100.0%- 95.7% 84.5%'  !

L 21. UNIT-SERVICE FACTOR: 100.0% 94.0% 82.2%'

l- -22. UNIT AVAILABILITY FACTOR: 100.0% 94.0% 82.2% >

l= 23. UNIT CAPACITY FACTOR USING MDC NET): 98.6% 90.8% 78.3%

24. UNIT CAPACITY FACTOR USING DER NET): 97.0% 89.4% 77.0%

L25. UNIT-FORCED OUTAGE RA E: - 0.0% 6.0% 11.4%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): ,

REFUELING -- FEB 23 -- 45 DAYS E 27..IF' SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A y

L V1-2

h

{ ,- ,-

> O'h '

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: DECEMBER 5 1989 COMPLETED BY: J.C.WILL}AMS TELEPHONE: (404) 826-4279 DAY Net MW j 1 ......... 1090 *- 'i 2 ......... 1096

  • 3 ......... 1098
  • 4 ......... 1099
  • 5 ....,.... 1100.*

6 ......... 1090

  • 7 ......... 1087
  • 8 ......... 1086 *  !

9 ......... 1091

  • 10 ......... 978

~11 ......... 760 j, 12 ......... 1037 -l' p 13 .....-.... 1095

  • 14 ......... 1098
  • 15 ......... 1091
  • 16 .........= 1104
  • L 17 . . . . . . . . . . 1113
  • q 18 ......... ~1111 *:

19 ......... '1106-* l 20 ......... 1105

  • i 21 ......... 1102
  • l 22 ......... 1109
  • 23 ......... 1110
  • i 24 ......... 1113 *  :

l-25.......... 1105

  • H 26 ......... 1101
  • 27 ......... 1101 * ,

28 ......... 947 .

29 ......... 818 l l

30 ......... 1097

  • j L  !

L 1

E

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS  !

1.

f

'h I

I VI-3 i

.V UNIT SHUTDOWNS AND POWER RED'JCTIONS DOCKET NO. 50-424 DATE: DECEMBER 5 1989 UNIT NAME: VEGP UNIT 1 COMPLETED BY: J.C. WILLIAMS )

TELEPHONE: (404) 826-4279 REPORT MONTH NOVEMBER 89 i

'l- R M 5 ~j E E Y T A T LICENSEE SC .

Y S H EVENT T 0- COMPONENT CAUSE & CORRECTIVE  !

P DURATION 0 0 REPORT ED CODE ACTION TO  !

-NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE  !

89-11 11/10 .S 0 A 5 N\A JK SIC SEE BELOW 89-12' 11/28 -S 0 .A. 5 N\A JK SIC SEE BELOW i

l F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE i S: SCHEDULED 1 - MANUAL A GREATER THAN 20% ,

A-EQUIPMENT FAILURE B-MAINTENANCE OR-TEST (EXPLAIN) 2 - MANUAL SCRAM REDUCTION IN AVERAGE  !

C-REFUELING 3 - AUTO. SCRAM DAILY. POWER LEVEL FOR  !

D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.  !

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION l F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) ,

G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-11 CAUSE: POWER REDUCTION DUE TO FAILED SPEED PICKUP # 2 ON MAIN FEEDPUMP "B".

l CORRECTIVE ACTION: REPLACED SPEED PICKUP # 2 ON MAIN FEEDPUMP "B".

89-12 CAUSE: POWER REDUCTION-DUE TO FAILED SPEED PICKUP # 1 ON MAIN FEEDPUMP "B". ,

-CORRECTIVE ACTION: REPLACED-SPEED PICKUP # 1 ON MAIN FEEDPUMP "B". i VI-4 L

t ENCLOSURE 2 V0GTLE ELECTRIC OENERATING PLANT - UNIT 2 l MONTilLY OPERATING REPORT FOR NOVEMBER,1989 TABLE OF CONTENTS l i

l NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SilVIDOWNS AND POWER REDUCTIONS Page V2-4  ;

I i

I o

k l

o

.~

NARRATIVE REPORT DOCKET NO.- 50-425 UNIT 2 DATE: DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS I TELEPHONE: (404)-826-4279 1

NOVEMBER 1 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS. '1

. NOVEMBER 5 12:23 MANUAL REACTOR TRIP DUE TO LOSS OF MFP "A". UNIT STABILIZED AT MODE 3 NOVEMBER 5 23:27 . UNIT 2 ENTERS MODE 2. +

NOVEMBER 6 00:16 UNIT 2 REACTOR CRITICAL.

NOVEMBER 6- 03:51 UNIT-2 ENTERS MODE 1.  :

NOVEMBER 6 06:22 UNIT 2 TIED TO THE GRID.

NOVEMBER 7. 06:33 UNIT 2-AT 100% POWER .

NOVEMBER 20 11:38 POWER REDUCTION TO 95% FOR FEEDWATER HEATER AND HDT "B" MAINTENANCE. 1

' NOVEMBER 24 04:00 COMMENCE RAMP T0 FULL POWER.

' NOVEMBER 24- 07:00 UNIT 2LAT 100% POWER.

NOVEMBER 28 03:01 POWER REDUCTION TO 91% DUE TO HDT "B" HIGH LEVEL INDICATION.

NOVEMBER 28 05:35 COMMENCE RAMP TO FULL POWER.

1 NOVEMBER 28 17:48 UNIT 2 AT 100% POWER.

NOVEMBER 30 23:59 UNIT 2 AT 100% POWER WITH.N0 OPERATIONAL PROBLEMS.

t V2-1 l

l

+

a .

OPERATING DATA REPORT DOCKET NO. LO-42!

DATE: DECEM0ER 5

-COMPLETED BY: J.E.1989 WILLIAMS

, OPERATING STATUS r

l. UNIT NAME:1 VEGP UNIT 2 1
2. REPORT PERIOD:' - .

NOVEMBER 1989 3.-LICENSED THERMAL POWER (MWt): 3411

-40 NAMEPLATE RATING' 1148

-5. DESIGN ELECTRICAL RATING NET (GROSS MWe : MWe): 1101 6.3 MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 1137 ,

7. MAXIMUM DEPENDABLE CAPACITY NET MWe 1083- f
8. IF CHANGES OCCUR IN CAPACITY-RATINGS): 1

'(ITEMS 3 THROUGHf7) SINCE LAST REPORT, GIVE REASONS: .;

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): No restrictions  !

'10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE  ;

.11. HOURS IN REPORTING PERIOD: 720 4681- 4681-  !

l 112.-NUMBER OF HOURS REACTOR WAS CRITICAL: '708.1 4489.9 .4489.9- -

H

13. REACTOR RESERVE SHUTDOWN. HOURS: 0.0 0.0 .

0.0 .1

14. HOURS-GENERATOR ON-LINE: 702.0- 4417.7 4417.7  !

15.l UNIT-RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0  !

16. GROSS THERMAL ENERGY' GENERATED H): 2350213 14871541 14871541 -i

'17. GROSS ELEC. ENERGY GENERATED  : 798539 5012780~ 5012780- '

l

18. NET ELEC. ENERGY GENERATED'(M  : 762059 4783630 4783630 i 1

-19. REACTOR SERVICE-FACTOR 98.3% 95.9% 95.9%' :! '

.20.TREACTOR AVAILABILITY FACTOR 98.3%' 95.9% 95.9%-

21 ' UNIT! SERVICE FAC10R:- 97.5% 94.4%~ 94.4%  !

=

22. UNIT' AVAILABILITY FACTOR: 97.5% 94.4% 94.4% l

'23.:. UNIT CAPACITY- FACTOR USING MDC NET : 97.7% 94.4% 94.4% =i

24. UNIT CAPACITY FACTOR USING DER NET : 96,1%. 92.8% 92.8% i
25. UNIT' FORCED OUTAGE RA E:: -. -

~. 2.5% 2.4% 2.4%-

L 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):

L

'27.IF.SHUTDOWNAT-ENDOFREPORTPERIOD,ESTIMATEDDdTEOFSTARTUP:

N/A .i

l.  !

, i l

l l

Li V2-2

O .j.T ,

- c. . .

l

. l

)

i UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 l l POWER LEVEL DATE: DECEMBER 5 1989 COMPLETED BY: J.C. WILLIAMS TELEPHONE: (404) 826-4279 DAY Net MW l 1 ......... 1113 * )

2 ......... 1117

  • 3 ......... 1119 *  ;

4 ......... 1121 *  !

, 5 ......... 554 .

it. '

6 ......... 430 )

7 ......... 1061 ,

8 ......... 1074 j 1088 *

~

9 .........

10 ......... 1105

  • 11 ......... 1103
  • 12 ......... 1101
  • 13 ......... 1104
  • 14 ......... 1102
  • 15 ......... 1093
  • 16 ......... 1101
  • 17 ......... 1123
  • 1 18 ......... 1121
  • 19 ......... 1121
  • 20 ......... 1079 21 ......... 1042 22 ......... 1057  ;

23 ......... 1057 24 ......... 1108

  • 25 ......... 1122
  • 26 ......... 1116
  • 27 ......... 1114
  • 2P ......... 1057 e 29 ......... 1122 +

30 ......... 1124 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS 3-V2-3 1

l

o ,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: DECEMBER 5 1989 VNIT NAME: VEGP UNIT 2 COMPLETED BY: J.C. WILLIAMS  ;

TELEPHONE: (404) 826-4279 i REPORT MONTH NOVEMBER 89 R M s E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECT 10 P DURATION 0 0 REPORT ED CODE ACTION TO NO. DA1E E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 89-12 11/05 F 17.99 A 2 2-89-29 SJ LCV SEE BELOW I F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED 1 - MANUAL A GREATER THAN 20%

A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM

! B-MAINTENANCE OR TEST REDUCTION IN AVERAGE I

C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINVATIONS THE PRECEDING 24 HOURS.

E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

L G-OPERATIONAL ERROR (EXPLAIN) l H-0THER (EXPLAIN) 89-12 CAUSE: MANUAL REACTOR TRIP DVE TO LOW MAIN FEEDWATER PUMP SUCTION CAUSING MAIN FEEDWATER PUMP "A" TO TRIP.

CORRECTIVE ACTION: DEFECTIVE 0-RING IN VALVE (2LV-4333 ACTUATOR WAS REMOVED AND REPLACED TO BRING VALVE TO FULL) OPERATIONA STATUS.

1 i

V2-4

._ _ .=. . . . __ .

l i

(ATTACHMENT 1)

VEGP UNITS 1 & 2 DATE: DECEMBER 5. 1989 COMPLETED BY: J. C. WILLIAMS TELEPHONE: (404) 826-4279  :

CHALLENGES TO PORV OR SAFETY VALVES L

VT EY NP ,

DATE TAG NUMBER TE DESCRIPTION ,

l THERE WERE NO CHALLENGES TO PORY OR SAFETY VALVES. ,

4 EVENT TYPE :

  • A-AUTOMATIC M-MANUAL 4 - -_ ___ , ___ . . , . . . _. -- - r.