| issue date = 11/14/1979
| issue date = 11/14/1979
| title = Notifies That Pull Test on Test Bars Will Be Conducted 791217 Re Engineering Evaluation & Repairs for Reactor Auxiliary Bldg & Containment Bldg.Requests Approval of Proposed Repairs
| title = Notifies That Pull Test on Test Bars Will Be Conducted 791217 Re Engineering Evaluation & Repairs for Reactor Auxiliary Bldg & Containment Bldg.Requests Approval of Proposed Repairs
| author name = JONES J A
| author name = Jones J
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000400, 05000401, 05000402, 05000403
| docket = 05000400, 05000401, 05000402, 05000403
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~ORM 2$ lOOM, Carolina Power 5 Light Company Ra&gtl, N C. 27e02 November 14,        1~O James  P,  O'Racily, Di actor Region    II Q.S. Nuclear Regulatory Ccan<ssion 101 Marietta St=eet, 'B.'rT.
Atlanta, Georgia 30303 UHXTS N >4, SHARON HAKRZS '.iVC~~~        POWER DOCENT'HQS. 50-400, 50<0 WG~r.~~TG ZVALVATIOH MD REPAIRS POR c..            2, 3 AX) 4 ..
5&03
                                                                        ~ R AGZZLLGC2 3V~LiQ NO. 2 SOOTZ SEE~ WALL AM COHTA~~lT BUILD'G7G '.70. 1
                                              ~
                                                                                    ~RIOR    WALL
 
==Dear  Mw. O'Reilly:==
 
Field  Change Request/ e manent Waiver PWW-993 was telecopied to Xi.. Tom Conlon o    your staff on November 9, 1979. This document togethe" with  e~t~g p o]ect procedures detail the repairs and confi~tory testing requ'"ed to ensure the reactoz a~fary building '.To. 2 south shear wa11 ~m restored to original design requirements. -messrs. Jack Bryant and Joe you staff discussed the repair and associated installation and testing Lena'f proceduzes wi~Jx Ashleigh Lucas of my staff on Hovembe 9, 1979. During this conversation, concurrence was obta~med to drill holes for replacement ein-forcing bars and test bars as well as to install and grout test bars. Your office vtl1 be notified prior to the pull test on test: bars which will'e on or about December 17, 1979, Your conffrmation of concurrence letter datec November 13, 1979 has been eceived and documents your concur"ence on this matter. The pull test will follow the 23-day cure period for the g out.
Installat" on of replacement bars ~~ follow engineer~mg evaluation of pull test    data and concu    ence  of your office.
Field  Change Request/Permanent Waiver F4W-984 vas telecopied to
    <w. Tom Conlon    of you" sta=f on November 13, 1979.                his doc~ent togethe=
with eW ing pro)ect p oceduzes detail the repai s required to ensure the containment building No. 1 e~erior wall is restored to original desi~
requirements. The repairs required by this document vill be done in accor-dance wi h    ~ting,      approved work procedures because            the act'vities required are rout~me    installation ac""vities.        No    special tests oz procedures aze required.
Your conca ence in ou proposed repair foz the containment 3uil&wg Ho. 1 ez    erior ~~    ~m zequested.      Youz author~ation to proceed wi h conc.ete placements    on  the  containment    buQ.d&g!To.        1 exterior ~~ after repairs are completed and    documented  is  also  requested.          Qua1ity assurance holds and con-struction inspection holds wQ1 be removed following your concu . nce and ouz inspection/acceptance      of repairs.
7912130
 
We appreciate your=cooperation in this matter; and should you have any  questions,  please cantact Mr. M. A. McDuffie, (919-836-6663) .
Tours very          truly,
                                          ,ORlGINAL $ fQQQ) gy J.l.g'enior A. an s Zxecutive Vice President Chief Operating Officer JAJ/tl bcc:  Messrs. H. J. Chiangk'~
T. S. Elleman G. Forehand P. W. Howe W. B. Kincaid A. M. Lucas M. A. McDuffie S. McMnus R. M. Parsons Sheldon Smith T. H. Wyllie S. R. Zimmerman A. L. Morris}}

Latest revision as of 05:12, 22 October 2019

Notifies That Pull Test on Test Bars Will Be Conducted 791217 Re Engineering Evaluation & Repairs for Reactor Auxiliary Bldg & Containment Bldg.Requests Approval of Proposed Repairs
ML18017A777
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/14/1979
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18017A774 List:
References
NUDOCS 7912130472
Download: ML18017A777 (2)


Text

~ORM 2$ lOOM, Carolina Power 5 Light Company Ra&gtl, N C. 27e02 November 14, 1~O James P, O'Racily, Di actor Region II Q.S. Nuclear Regulatory Ccan<ssion 101 Marietta St=eet, 'B.'rT.

Atlanta, Georgia 30303 UHXTS N >4, SHARON HAKRZS '.iVC~~~ POWER DOCENT'HQS. 50-400, 50<0 WG~r.~~TG ZVALVATIOH MD REPAIRS POR c.. 2, 3 AX) 4 ..

5&03

~ R AGZZLLGC2 3V~LiQ NO. 2 SOOTZ SEE~ WALL AM COHTA~~lT BUILD'G7G '.70. 1

~

~RIOR WALL

Dear Mw. O'Reilly:

Field Change Request/ e manent Waiver PWW-993 was telecopied to Xi.. Tom Conlon o your staff on November 9, 1979. This document togethe" with e~t~g p o]ect procedures detail the repairs and confi~tory testing requ'"ed to ensure the reactoz a~fary building '.To. 2 south shear wa11 ~m restored to original design requirements. -messrs. Jack Bryant and Joe you staff discussed the repair and associated installation and testing Lena'f proceduzes wi~Jx Ashleigh Lucas of my staff on Hovembe 9, 1979. During this conversation, concurrence was obta~med to drill holes for replacement ein-forcing bars and test bars as well as to install and grout test bars. Your office vtl1 be notified prior to the pull test on test: bars which will'e on or about December 17, 1979, Your conffrmation of concurrence letter datec November 13, 1979 has been eceived and documents your concur"ence on this matter. The pull test will follow the 23-day cure period for the g out.

Installat" on of replacement bars ~~ follow engineer~mg evaluation of pull test data and concu ence of your office.

Field Change Request/Permanent Waiver F4W-984 vas telecopied to

<w. Tom Conlon of you" sta=f on November 13, 1979. his doc~ent togethe=

with eW ing pro)ect p oceduzes detail the repai s required to ensure the containment building No. 1 e~erior wall is restored to original desi~

requirements. The repairs required by this document vill be done in accor-dance wi h ~ting, approved work procedures because the act'vities required are rout~me installation ac""vities. No special tests oz procedures aze required.

Your conca ence in ou proposed repair foz the containment 3uil&wg Ho. 1 ez erior ~~ ~m zequested. Youz author~ation to proceed wi h conc.ete placements on the containment buQ.d&g!To. 1 exterior ~~ after repairs are completed and documented is also requested. Qua1ity assurance holds and con-struction inspection holds wQ1 be removed following your concu . nce and ouz inspection/acceptance of repairs.

7912130

We appreciate your=cooperation in this matter; and should you have any questions, please cantact Mr. M. A. McDuffie, (919-836-6663) .

Tours very truly,

,ORlGINAL $ fQQQ) gy J.l.g'enior A. an s Zxecutive Vice President Chief Operating Officer JAJ/tl bcc: Messrs. H. J. Chiangk'~

T. S. Elleman G. Forehand P. W. Howe W. B. Kincaid A. M. Lucas M. A. McDuffie S. McMnus R. M. Parsons Sheldon Smith T. H. Wyllie S. R. Zimmerman A. L. Morris