Interim Deficiency Rept Re Omission of Rebar in Reactor Auxiliary Bldg.Corrective Action Will Be Completed by 800301
Date released: 08/31/2018 Download: ML18017A774


Notifies That Pull Test on Test Bars Will Be Conducted 791217 Re Engineering Evaluation & Repairs for Reactor Auxiliary Bldg & Containment Bldg.Requests Approval of Proposed Repairs
ML18017A777
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/14/1979
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017A777 (2)
Provides Supplemental Info to 791101 Ltr Re Corrective Actions Following Omission of Rebar at Two Locations. Requests Authorization to Resume Placement of Concrete & Approval of Proposed Corrective Action
ML18017A776
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/02/1979
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017A776 (2)
Ack Receipt of NRC 791030 Ltr Re Placement of Concrete Omitting Rebar.Caused by Human Error.Repairs on Affected Walls Will Commence After NRC Approval of Corrective Action
ML18017A775
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/01/1979
From: Jackie Jones
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18017A775 (6)
Interim Deficiency Rept Re Omission of Rebar in Reactor Auxiliary Bldg.Corrective Action Will Be Completed by 800301
ML18017A773
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)