~ORM 2$ lOOM, Carolina Power 5 Light Company Ra>l, N C. 27e02 November 14, 1~O James P, O'Racily, Di actor Region II Q.S. Nuclear Regulatory Ccan<ssion 101 Marietta St=eet,
'B.'rT.
Atlanta, Georgia 30303 SHARON HAKRZS '.iVC~~~
POWER UHXTS N >4, 2,
3 AX) 4..
DOCENT'HQS. 50-400, 50<0 c..
5&03 WG~r.~~TG ZVALVATIOHMD REPAIRS POR
~ R AGZZLLGC2 3V~LiQ NO.
2 SOOTZ SEE~ WALL AM
~
COHTA~~lT BUILD'G7G '.70.
1 ~RIOR WALL
Dear Mw. O'Reilly:
Field Change Request/
e manent Waiver PWW-993 was telecopied to Xi.. Tom Conlon o your staff on November 9, 1979.
This document togethe" with e~t~g p o]ect procedures detail the repairs and confi~tory testing requ'"ed to ensure the reactoz a~fary building '.To.
2 south shear wa11
~m restored to original design requirements.
-messrs.
Jack Bryant and Joe Lena'f you staff discussed the repair and associated installation and testing proceduzes wi~Jx Ashleigh Lucas of my staff on Hovembe 9, 1979.
During this conversation, concurrence was obta~med to drill holes for replacement ein-forcing bars and test bars as well as to install and grout test bars.
Your office vtl1 be notified prior to the pull test on test: bars which will'e on or about December 17, 1979, Your conffrmation of concurrence letter datec November 13, 1979 has been eceived and documents your concur"ence on this matter.
The pull test will follow the 23-day cure period for the g out.
Installat" on of replacement bars ~~
follow engineer~mg evaluation of pull test data and concu ence of your office.
Field Change Request/Permanent Waiver F4W-984 vas telecopied to
<w.
Tom Conlon of you" sta=f on November 13, 1979.
his doc~ent togethe=
with eW ing pro)ect p oceduzes detail the repai s required to ensure the containment building No. 1 e~erior wall is restored to original desi~
requirements.
The repairs required by this document vill be done in accor-dance wi h ~ting, approved work procedures because the act'vities required are rout~me installation ac""vities.
No special tests oz procedures aze required.
Your conca ence in ou proposed repair foz the containment 3uil&wg Ho.
1 ez erior ~~
~m zequested.
Youz author~ation to proceed wi h conc.ete placements on the containment buQ.d&g!To. 1 exterior ~~
after repairs are completed and documented is also requested.
Qua1ity assurance holds and con-struction inspection holds wQ1 be removed following your concu.
nce and ouz inspection/acceptance of repairs.
7912130
We appreciate your=cooperation in this matter; and should you have any questions, please cantact Mr. M. A. McDuffie, (919-836-6663)
Tours very truly,
,ORlGINAL $fQQQ) gy J.
A.
an s l.g'enior Zxecutive Vice President Chief Operating Officer JAJ/tl bcc: