Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20203J5511998-02-23023 February 1998 Provides follow-up to 980204 Meeting Between Util & PA Dept of Environ Protection Re Rock Run Creek Crossing,Small Project Joint Permit Application,Addendum ML20202H0831997-10-0202 October 1997 Forwards Permit Application for Proposed Low Flow Crossing of Rock Run Creek Located on Util Property at Pbaps,As Discussed in 970609 Presentation ML20198J7491997-10-0202 October 1997 Forwards Permit Application for Proposed Low Flow Crossing of Rock Run Creek Located on Util Property at Pbaps.W/O Encl ML18094B3291990-02-14014 February 1990 Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML19324B8051989-09-28028 September 1989 Forwards NPDES Wastewater Monitoring Repts for Listed Facilities ML20246C6741989-08-11011 August 1989 Informs That DOE Will Not Extend Sales Agreement & Will Discontinue Discussions of Sale of Centrifuge Equipment ML20246C6941989-08-11011 August 1989 Discusses Key Issues Affecting Technology Transfer of Classified Gas Centrifuge Equipment & Technology from DOE to Alchemie.Requests That DOE Give Alchemie Necessary Time to Consummate Few Remaining Matters in Appropriate Fashion ML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem B13167, Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity1989-03-0808 March 1989 Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity ML18093B1511988-09-12012 September 1988 Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts ML20151E1881988-07-14014 July 1988 Forwards Supplementary Info,Per Commitment in to Provide Info Before 880715 Meeting ML18093A6401988-02-12012 February 1988 Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 ML20236N7371987-11-0909 November 1987 Requests That Listed Discharge Point for Treated Radwaste Be Added to NPDES Permit.Discharge Point Inadvertently Omitted in 810702 NPDES Permit Reapplication Due to Confusion Over Regulatory Authority.Permit Page 2d Encl ML20213G4831987-05-0707 May 1987 Submits Info Re Amends to NPDES Permit 0009733,per 861209 Meeting.Forwards Two Repts of Analyses for Metals & Phthalates Required to Be Monitored by Permit.Requirement of 2-yr Monitoring Period Fulfilled.W/One Oversize Drawing ML20213G0551987-05-0606 May 1987 Requests Permission to Use Betz Slimicide C-74 as Means to Control Corbicula (Asiatic Clams) in Svc Water Sys.Product Info Supplied by Mfg Encl ML20209J0211986-09-0505 September 1986 Requests Use of Nalco 1360 (Polymaric Zinc),Per Chapter 92.7, Reporting of New or Increased Discharges. Product Will Be Evaluated as Means to Control Corrosion in Emergency Svc Water Sys ML20203L0651986-08-15015 August 1986 Forwards marked-up Draft BNL Summary of Radioactive Effluents Released for 1984,per NRC 860715 Request for Review ML20203J3181986-07-18018 July 1986 Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts ML20197H5211986-05-0606 May 1986 Requests That Cp&L/Power Agency Reach Agreement W/O Delay. Util Prepared to Eliminate Joint Ownership in Roxboro 4, Reduce Ownership Interest in Licenses DPR-62 & DPR-71 & Propose Sliding Scale Adjustments ML20141E3601986-04-16016 April 1986 Forwards Application for NPDES Permit for Group II Storm Water Discharges.Discharges Located on Outskirts of Facility & Do Not Drain Areas Adjacent to Facility.Permit Required Due to Change in Regulations B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl1985-11-27027 November 1985 Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl ML18092A8741985-10-15015 October 1985 Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts ML20127E3811985-06-19019 June 1985 Forwards NPDES Discharge Monitoring Rept for May 1985 & Noncompliance Rept ML20125B3551985-06-0606 June 1985 Forwards Revised Schematic of Water Flow for NPDES Permit Application,Per 850508 Request.Schematic Revised to Show Emergency Svc Water Sys & Discharge Points ML20087L1641984-03-0808 March 1984 Forwards Revised Offsite Dose Calculation Manual, Per NRC 830929 Request Re Radiological Effluent Tech Specs ML20087M0611983-09-22022 September 1983 Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna ML20080G6411983-07-11011 July 1983 Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808 ML20081C0621983-04-0505 April 1983 Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request ML20023D1961982-10-27027 October 1982 Forwards Vols 1-4 to Independent HVAC Review,Lasalle County Nuclear Plant, Final Rept ML20023D1721982-09-15015 September 1982 Forwards LaSalle County Station Independent HVAC Review, Interim Rept.Rept Also Sent to Jg Keppler ML20023D1451982-08-27027 August 1982 Forwards Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. QC Rejectable Welds Have Sufficient Strength to Meet Design Requirements of HVAC Ductwork & Need Not Be Repaired ML20063H1661982-08-26026 August 1982 Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20055A2611981-12-0909 December 1981 Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129 ML20079R1181981-07-15015 July 1981 Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info Encl ML20080E6911980-08-20020 August 1980 Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested ML19320A6291980-04-16016 April 1980 Comments on Proposed Rule 10CFR20:NRC Should Sponsor Mandatory Dosimetry Test Program for All Civilian Personnel Dosimetry Processors.Advises of Inability to Attend 800423 Meeting of in-house Dosimetry Processors ML20079R0961979-09-0707 September 1979 Forwards Project Status Rept,Jul 1979 ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested ML20235C4151974-05-24024 May 1974 Expresses Concern Re Energy Crisis Proclaimed by Ofc of President & Unreasonable Length of Time Needed to Construct & License Nuclear Power Plants 1998-02-23
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML18094B3291990-02-14014 February 1990 Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML19324B8051989-09-28028 September 1989 Forwards NPDES Wastewater Monitoring Repts for Listed Facilities ML20246C6741989-08-11011 August 1989 Informs That DOE Will Not Extend Sales Agreement & Will Discontinue Discussions of Sale of Centrifuge Equipment ML20246C6941989-08-11011 August 1989 Discusses Key Issues Affecting Technology Transfer of Classified Gas Centrifuge Equipment & Technology from DOE to Alchemie.Requests That DOE Give Alchemie Necessary Time to Consummate Few Remaining Matters in Appropriate Fashion ML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem B13167, Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity1989-03-0808 March 1989 Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity ML18093B1511988-09-12012 September 1988 Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts ML20151E1881988-07-14014 July 1988 Forwards Supplementary Info,Per Commitment in to Provide Info Before 880715 Meeting ML18093A6401988-02-12012 February 1988 Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 ML20236N7371987-11-0909 November 1987 Requests That Listed Discharge Point for Treated Radwaste Be Added to NPDES Permit.Discharge Point Inadvertently Omitted in 810702 NPDES Permit Reapplication Due to Confusion Over Regulatory Authority.Permit Page 2d Encl ML20213G4831987-05-0707 May 1987 Submits Info Re Amends to NPDES Permit 0009733,per 861209 Meeting.Forwards Two Repts of Analyses for Metals & Phthalates Required to Be Monitored by Permit.Requirement of 2-yr Monitoring Period Fulfilled.W/One Oversize Drawing ML20213G0551987-05-0606 May 1987 Requests Permission to Use Betz Slimicide C-74 as Means to Control Corbicula (Asiatic Clams) in Svc Water Sys.Product Info Supplied by Mfg Encl ML20209J0211986-09-0505 September 1986 Requests Use of Nalco 1360 (Polymaric Zinc),Per Chapter 92.7, Reporting of New or Increased Discharges. Product Will Be Evaluated as Means to Control Corrosion in Emergency Svc Water Sys ML20203L0651986-08-15015 August 1986 Forwards marked-up Draft BNL Summary of Radioactive Effluents Released for 1984,per NRC 860715 Request for Review ML20203J3181986-07-18018 July 1986 Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts ML20197H5211986-05-0606 May 1986 Requests That Cp&L/Power Agency Reach Agreement W/O Delay. Util Prepared to Eliminate Joint Ownership in Roxboro 4, Reduce Ownership Interest in Licenses DPR-62 & DPR-71 & Propose Sliding Scale Adjustments ML20141E3601986-04-16016 April 1986 Forwards Application for NPDES Permit for Group II Storm Water Discharges.Discharges Located on Outskirts of Facility & Do Not Drain Areas Adjacent to Facility.Permit Required Due to Change in Regulations B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl1985-11-27027 November 1985 Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl ML18092A8741985-10-15015 October 1985 Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts ML20127E3811985-06-19019 June 1985 Forwards NPDES Discharge Monitoring Rept for May 1985 & Noncompliance Rept ML20125B3551985-06-0606 June 1985 Forwards Revised Schematic of Water Flow for NPDES Permit Application,Per 850508 Request.Schematic Revised to Show Emergency Svc Water Sys & Discharge Points ML20087L1641984-03-0808 March 1984 Forwards Revised Offsite Dose Calculation Manual, Per NRC 830929 Request Re Radiological Effluent Tech Specs ML20087M0611983-09-22022 September 1983 Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna ML20080G6411983-07-11011 July 1983 Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808 ML20081C0621983-04-0505 April 1983 Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request ML20023D1961982-10-27027 October 1982 Forwards Vols 1-4 to Independent HVAC Review,Lasalle County Nuclear Plant, Final Rept ML20023D1721982-09-15015 September 1982 Forwards LaSalle County Station Independent HVAC Review, Interim Rept.Rept Also Sent to Jg Keppler ML20023D1451982-08-27027 August 1982 Forwards Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. QC Rejectable Welds Have Sufficient Strength to Meet Design Requirements of HVAC Ductwork & Need Not Be Repaired ML20063H1661982-08-26026 August 1982 Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20055A2611981-12-0909 December 1981 Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129 ML20079R1181981-07-15015 July 1981 Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info Encl ML20080E6911980-08-20020 August 1980 Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested ML19320A6291980-04-16016 April 1980 Comments on Proposed Rule 10CFR20:NRC Should Sponsor Mandatory Dosimetry Test Program for All Civilian Personnel Dosimetry Processors.Advises of Inability to Attend 800423 Meeting of in-house Dosimetry Processors ML20079R0961979-09-0707 September 1979 Forwards Project Status Rept,Jul 1979 ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested ML20235C4151974-05-24024 May 1974 Expresses Concern Re Energy Crisis Proclaimed by Ofc of President & Unreasonable Length of Time Needed to Construct & License Nuclear Power Plants 1990-02-14
[Table view] |
Text
,
' b :- SIGNAL O!F W DIVISION b Federal Signal Corporation
~ - - - -
December 9, 1981 Mr. Vincent S. Boyer, Senior Vice President Nuclear Power - S25-1 Philacelphia Electric Company 2301 Market Street, Pennsylvania 19101
Dear Mr. Boyer:
This letter is written as requested by Dave Tepper, Project Engineer on the Peach Bottom Public Notification System, to suirmarize our several discussicns relating to eculpment delivery schedule. The deadline established by NRC of February 1,1982 for operational public notification systems is clearly being
' taken very serious by all utilities. Being a major supplier of public
{
notification systems not only to the domestic utilities, but Internationallyk
> and the combination of NRC's recuirements and political unrest in the Mid-Eas has created an unprecedented high demand on public notification systems eculpment directly affecting our ability to accommodate all delivery t
- recuirements.
Feoeral's ef fort's in responding to this heavy oemand has to a great extent been successful since the recuirement was foreseened and efforts were initiated earlier to meet the demand. Custom engineereo control panels however, could not be anticipated as these have been specified differently by each utility. In most cases final details of the exact form and function of
- these control panels was not adecuately specified at time purchase orders were placea, therefore, recuiring further definition and in some instancesDelays even price adjustments to accommodate special requirements established.
caused by this factor have created changes in the quing of orcers for custom
( panels.
To meet these demands and minimize delays additional electricians are beino added to the manufacturing operation . Our electricians are already working cvertime. (10 hrs per day). Unfortunately, some lost time is inevitable j
during the forthcoming Holiday Season. Taking these factors into acccunt our l
best estimate of equipment oelivery at this time, based cn fourteen (14) panels per truckload, is as follows:
1st Shipment January 15 14 Units 2nd Shipment January 19 14 Units l
3rd Shipment January 22 14 Units l
' Ath Shipment January 26 14 Units 5th Shipment January 29 14 Units
! . 8207160032 820528 PDR FOIA
136TH & WESTERN AVENUE . BLUE ISLAND. ILLINOIS 6040S . PHONE (312) 468-4500 l
December 9, 1981 Page Two Mr. Vincent S. Boyer Philadelphia Electric Company -
Pennsylvania 19101 Subsequently, Dave Tepper has requested that we increase the first shipment oy six (6) so that a total of 20 units would be available by the 18th, consideririg dedicated truck delivery requiring no more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, so that the entire 5-mile radius of the EPZ can be made operational by February 1st.
Feoeral Signal Corporation will do everything within its pcwer, to ccmplete fabrication and QA testing of the 20 units to accommodate this request. We will maintain close contact with Dave Tepper for ccordination of shipments, installation, and field checkout. .
We certainly appreciate the concern for completing this public notification system project in a tirrely way and trust that this schedule can be accommodated by Philadelphia Electric. If necessary, We would be willing to acconpany someone from Philadelphia Electric or provide explanation to the NRC compliance rnonitors.
Very truly yours, FEDERAL SIGNAL CCRPCRATION r&W ,
.~
Marvin E. Anderson Director, Engineered Systems MEA /jr
n f}
o PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 1881 1981 PHILADELPHIA PA.19101 (215: a415001 smetos t. o4LTnorr , '
.ui&',"?l:'L.
g ,; g.
YECS"e. -C '61
'o December 18, 1981 02 2i$gI5 -
Re: Docket Nos. 50-277 " ,are .
50-278 c4 *diff,~jgc 2A '
' ON.
. ,. / ' .
Mr. Brian K. Grimes, Director Division of Emergency Preparedness US Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Grimes:
In my letter dated July 16, 1981 (S. L. Daltroff to Mr.
l Boyce H. Grier with a carbon copy to Mr. Brian Grimes)
Philadelphia Electric Company informed the Nuclear Regulatory Commission that we anticipated completion of the installation of sirens associated with the Peach Bottom Atomic Power Station for
" Prompt Notifications and Instructions to the Public in the Event of an Emergency" by February, 1982. On September 21, 1981, the Nuclear Regulatory Commission published a notice of proposed rulemaking in the Federal Register among other things " proposing to amend its regulations to extend the date by which prompt I public notification systems must be operational around all nuclear power plants. The proposed extension is based on l industry-wide difficulty in acquiring the necessary equipment, permits, and clearances. If adopted, the proposal would extend the compliance date for these systems from July 1, 1981, to no later than February 1, 1982". Since the proposed rule provided sufficient time for us to complete our installation, Philadelphia l
Electric Company did not comment on the proposed rules establishing February 1, 1982 as an implementation date.
Federal Signal Corporation, the principle of our equipment suppliers, has recently notified us of delivery y h,3{
i problems relating to siren control cabinets. Philadelphia S
'/
f- --
[ h
,/
tmmv;O7 811218
( PDR ADOCK 05000277
.\ F PDR
,e Mr. Brian K. Grimes, Director Page 2 Electric Company was advised of these delivery problems by phone on December 7, received written confirmation on December 9. A copy of this letter is attached. Because of these delivery problems, we can no longer meet our expected completion date.
I our program had been progressing at an a'ccelerated pace.
Extensive field studies were> conducted, including'in place testing,- to assure the adequa'cy of our design.- The information ga'.ned during this study phase was utilized as input into our system design. Philadelphia Electric Company met with county and st.te emergency directors on August 26, and again on December 10 to review siren system specifications and installation schedule.
Concurrent with the procurement of sirens, real estate and right-of-way negotiations were undertaken and all sites were obtained by December 1, 1981.
The installation oof siren subassemblics began on Octoberi
.' 19, 1981. As of December 11, 1981, 67 of 70 sirens had been t
installed, with power provided to'at least 35 of the sirens. 1k)
~
siren control cabinets have been received and the difficulties being experienced by-Federal Signal.are delaying first shipments until January 15, 1982. Pending receipt of the control cabinets our efforts continue with procurement and installation of other subassemblies associated with the siren system. The most optimistic schedule, assuming acceptable weather conditions, and the delivery of the control cabinets by Federal. Signal as promised, allows for the completion date.for sirens within the five mile radius by February 15, 1982 and the complete installation i of all sirens within the ten mile radius by April 1, 1982.
hhiladelphia Electric Company. requests relaxation of its commitment to have a completely operable' siren system by February ,
1, 1982 because of the material delivery difficulties experienced '<
l by its supplier. s
't
,( sj very t'ruly yours,
/ .
i ,.
' m- ( ,
q s<~ e. . u 'p.
' / /
Attachment s
'k f' q
-___.-_____lr __ . h