Forwards Permit Application for Proposed Low Flow Crossing of Rock Run Creek Located on Util Property at Pbaps.W/O Encl
ML20198J749
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/02/1997
From: Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Rettinger E
PENNSYLVANIA, COMMONWEALTH OF
References
NUDOCS 9710220061
Download: ML20198J749 (3)


Text

{{#Wiki_filter:, Thom:s et Mit:h:d '/w:e iminent hJCh tiOtt0m A%ffMC t9 A M 4'?.laOfl (-) PECO NUC1. EAR h-- 1848 La Hoad A Unit of PECO Energy Delta I A 173144o32 717 456 AnOo Fan 717 456 4243 October 2.1997 l Mr. Eoward Rettinger, Senior Civil Hydraulic Engineer Pennsylvania Department of Environmental Protection Water Management Program Southcentral Regional Office i Ararat Boulevard, Room 126 Harnsburg, PA 17110

Subject:

PECO Energy Company Peach Bottem Atomic Power Station (PBAPS) Rock Run Creek Low Flow Crossing Small Project Joint Permit Application

Dear Mr Rettinger,

As we discussed in our 6/9/97 presentation to yot, attached is a permit application for a proposed low flow crossing of the Rock Run Creek located on PECO Energy Co property at PBAPS in Peach Bottom Township, York County. We are requesting a Pennsylvania Department of Environmental-Protection Chapter 105 Water Obstruction and Encroachment Permit for encroachments to regulated " Waters of the Commonwealth" necessary for the construction of the O structure. The project will also require U.S. Army Corps of Engineers' Section 404 regulatory approval under the Corps' Pennsylvania State programmatic General Permit (SPGP.1). In the attached application, we desenbe the proposed low flow crossing. Because the design is still conceptual in nature, it is possible that details of the crossing may be refined, it is our intent that this permit apphcation present a design which would be bounding from a DEP review standpointi Therefore, any design changes which may be required would be environmentally more conservative or of no environmental consequence (e g. Smaller width of crossing, subsurface structural design changes, etc). These minor changes would be assured to not affect the conclusions of the hydrology / hydraulic study and not incicase the overall area disturbed by construction, it is requested that your approval of this application allow for such concervative or non-consequential design tefinements. 'If you have any questions or need additionalinformation please contact Dave Foss at 717 456 { 3013. We appreciate your cooperation in this matter. A check for the $100 appkcation fee is enclosed. Thank you L ()0 h Sincerely, l Q)yldtddbid Thomas N. Mitchell Vice President. O Peach Bottom Atomic Power Station - lll l Attachments - CCN 97-14058 9710220061 971002 PDR ADOCK 05000277> p POR

s cc: W. T. Hennck, Pubhc Sennee Electne & Gas (wlo attachments) R. R. Janati, Commonwealth of Pennsylvania (w/o attachments) Eric Leeds, USNRC, SFPO NRC Document Control Desk (wlo attachment) Rich Barkley, US NRC, Senior Resident inspector (wlo attachments) T. M. Messick, Atlantic Electne (wlo attachments) R.1. McLean, State of Mai/ land (wlo attachments) A. F. Kirby ill, DelMarVa Power (wlo attachments) ,r- \\v/ L.)

~W q bec: All without attachments unless indicated OEAP Coordinator 62A 1, Chesterbrook - Correspondence ControlProgram 618 3, Chesterbrook D. M. Smith 63C 3, Chesterbrook G. R. Rainey - 63C 3, Chesterbrook T. N. Mitchell SMB4 9, Peach Bottom D. B. Fetters 62C 3. Chesterbrook T. J. Niessen 53A 1, Chesterbrook E. J. Cullen S231 MainOmco E. W. Callan SMB44, Peach Bottom G. A Hunger 62A 1 Chesterbrcok J. G. Hufnagel' 6.* \\ 1, Chesterbrook C J.McDermott oi31, Main Omco G. D. Edwards A418, Peach Bottom M.E. Wamer SMB3 5, Peach Bottom - R.A.Kankus 61C 1. Chesterbrook G.J.Lengyel A4 4S, Peach Bottom R. M. Matty S212. Main Omce (w/ attachment) .a O =}}