ML20023D145
ML20023D145 | |
Person / Time | |
---|---|
Site: | LaSalle, 05000000 |
Issue date: | 08/27/1982 |
From: | Pollock R SARGENT & LUNDY, INC. |
To: | Shelton B COMMONWEALTH EDISON CO. |
Shared Package | |
ML20023A480 | List: |
References | |
FOIA-82-366 NUDOCS 8305190302 | |
Download: ML20023D145 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H4661999-10-18018 October 1999
[Table view]Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217H6341999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for Kh Curran,Lm Gerlach,Rc Weber & Bt Rhodes Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC Form 396 Encl.Proprietary Info Withheld ML20217H6251999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for MR Kahn,Aj Mclaughlin,De Montgomery & Kr Murphy Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC from 396 Encl.Proprietary Info Withheld ML20217F4301999-10-14014 October 1999 Responds to 991012 Rai,Based on 991001 Telcon Re Suppl to Request for TS Change to Revise MCPR Safety Limit & Add Approved Siemens Topical Rept for LaSalle County Station, Unit 1 ML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217C1671999-10-0808 October 1999 Provides Suppl to RAI for Approval of Unreviewed Safety Question Re Assessment of Certain safety-related Concrete Block Walls at LaSalle County Station,Units 1 & 2 ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff 05000373/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl1999-10-0404 October 1999 Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads 05000374/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl1999-09-20020 September 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr ML20211Q9911999-09-10010 September 1999 Informs That License SOP-4048-4,for Wp Sly May Be Terminated Due to Individual Retiring ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20211P2211999-09-0808 September 1999 Forwards Insp Repts 50-373/99-14 & 50-374/99-14 on 990809- 13.No Violations Noted.Insp Concluded That Emergency Preparedness Program Maintained in Good State of Operational Readiness ML20212A8571999-09-0707 September 1999 Informs That Proprietary Document, Power Uprate SAR for LaSalle County Station,Units 1 & 2, Rev 2,Class III, NEDC-32701P,submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211Q6861999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant License Applicants During Wks of 001113 & 20. Validation of Exam Will Occur at Station During Wk of 001023 05000374/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl1999-09-0303 September 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl ML20211M1151999-08-31031 August 1999 Requests That Following Eleven Individuals Take BWR Gfes of Written Operator Licensing Exam to Be Administered on 991006 ML20211G1831999-08-27027 August 1999 Provides Addl Clarification of Proposed Refueling Practices Under Proposed Core Alterations Definition Re 990813 Application for Amend to TS ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8731999-08-25025 August 1999 Forwards Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11.No Violations Noted.Fire Protection Program Strengths Includes Low Number of Fire Protection Impairments & Excellent Control of Transient Combustibles ML20210U3201999-08-17017 August 1999 Forwards Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed 05000373/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed1999-07-23023 July 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed ML20210E0501999-07-22022 July 1999 Submits Summary of 990630 Management Meeting Re Licensee Performance Activities Since Start Up of Unit 2.List of Attendees & Matl Used in Presentation Enclosed ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209H5171999-07-15015 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at LaSalle County Nuclear Generating Station for Weeks of 990913,1018 & 1129 ML20209G4031999-07-14014 July 1999 Forwards Insp Repts 50-373/99-11 & 50-374/99-11 on 990614-18.No Violations Noted ML20209E1211999-07-14014 July 1999 Submits mid-cycle Rev of COLR IAW LaSalle County Tech Spec 6.6.A.6.d.Rev to COLR Was Necessary Due to Implementation of TS Change Approved by Ltr Dtd 990212,which Changed Turbine Stop Valve & Turbine Control Valve Scram ML20209F6931999-07-13013 July 1999 Forwards Insp Repts 50-373/99-04 & 50-374/99-04 on 990513-0622.No Violations Noted.Determined That Multiple Challenges to Main Control Room Operators Occurred During Insp Period Due to Human Performance Weaknesses ML20209E0341999-07-0909 July 1999 Provides NRC with Siemens Power Corp (SPC) Fuel & GE Fuel MCPR Data for LaSalle Unit 1 Cycle 9.LaSalle Unit 1 Is Currently Scheduled to Start Cycle 9 in 991101 ML20209G3901999-07-0909 July 1999 Informs NRC of Status of Commitments & Requests NRC Concurrence for Use of ASME Section III App F Acceptance Criteria to Permanently Qualify Units 1 & 2 Penetrations M-49 & M-50 ML20210C1521999-07-0909 July 1999 Forwards Post-Outage (90 Day) Summary Rept for ISI Examinations & Repair/Replacement Activities Conducted from Beginning of First Insp Period of Second ten-yr Insp Interval Through L2R07 Refueling Outage ML20209E0361999-07-0808 July 1999 Forwards LaSalle County Station Unit 2 Cycle 8 Startup Test Rept Summary,Iaw TS NPF-18,Section 6.6.A.1.Startup Test Program Was Satisfactorily Completed on 990501 ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J4711999-06-30030 June 1999 Discusses Closure of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Units 1 & 2 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20212J0311999-06-21021 June 1999 Informs of Actions Taken to Close Remaining Open Items in .Attachment Provides Detailed Justification for Closure of Open Items in Sections 5.2.2 & 5.2.8 ML20196B1951999-06-18018 June 1999 Informs NRC That Do Werts,License OP-30373-2,no Longer Requires Use of NRC License for LaSalle County Station. License May Be Terminated ML20195J7761999-06-15015 June 1999 Submits Request Relief CR-23,requesting Relief from Code Required Selection & Examinations of Noted Integral Attachments & Proposes to Utilize Alternative Selection & Examination Requirements Similar to Code Case N-509 ML20196G8021999-06-15015 June 1999 Requests Renewal of SRO License for Vv Masterson.Current License for Vv Masterson Will Expire Jul 1999.NRC Forms 398 & 396,encl.Without Encls ML20195G7101999-06-11011 June 1999 Informs That Effective 990514,GH Mccallum,License SOP-31412, No Longer Requires Use of NRC License for LaSalle Station. License Should Be Terminated ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207D2821999-05-27027 May 1999 Requests That Implementation Date for Unit 1 Be Changed Prior to Startup for L1C10 to Allow Best Allocation of Resources to Implement Unit 1 Amend Prior to Startup for Either L1C9 or L1C10.Unit 2 Will Implement Mod IAW Request 1999-09-08 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20096C9131992-05-0505 May 1992
[Table view]Authorizes Release of Input Data Files for Plant PRA Study Conducted by Sandia to State of Il,Per 920429 Telcon.Util Does Not Fully Endorse Use of Data Since Info Does Not Reflect Current Plant Design & Performance ML18094B3291990-02-14014 February 1990 Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML19324B8051989-09-28028 September 1989 Forwards NPDES Wastewater Monitoring Repts for Listed Facilities ML20246C6741989-08-11011 August 1989 Informs That DOE Will Not Extend Sales Agreement & Will Discontinue Discussions of Sale of Centrifuge Equipment ML20246C6941989-08-11011 August 1989 Discusses Key Issues Affecting Technology Transfer of Classified Gas Centrifuge Equipment & Technology from DOE to Alchemie.Requests That DOE Give Alchemie Necessary Time to Consummate Few Remaining Matters in Appropriate Fashion ML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem B13167, Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity1989-03-0808 March 1989 Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity ML18093B1511988-09-12012 September 1988 Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts ML18093A6401988-02-12012 February 1988 Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 ML20203J3181986-07-18018 July 1986 Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts ML20197H5211986-05-0606 May 1986 Requests That Cp&L/Power Agency Reach Agreement W/O Delay. Util Prepared to Eliminate Joint Ownership in Roxboro 4, Reduce Ownership Interest in Licenses DPR-62 & DPR-71 & Propose Sliding Scale Adjustments B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl1985-11-27027 November 1985 Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl ML18092A8741985-10-15015 October 1985 Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts ML20087M0611983-09-22022 September 1983 Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna ML20080G6411983-07-11011 July 1983 Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808 ML20072J4951983-06-23023 June 1983 Advises That DOE Will Respond to Requests for Emergency Radiological Assistance from Licensees,Federal,State & Local Agencies,Private Organizations or Individuals Involved in Incident Involving Source,Byproduct or SNM ML20081C0621983-04-0505 April 1983 Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request ML20067C1831982-11-24024 November 1982 Forwards Addl Matl Tests Received on 821119 from Region 3 Supplementing Matl Addressed in Independent HVAC Review Final Rept, Oct 1982.Data Reviewed by Welding & Matl Specialists.Comments Encl ML20023D1961982-10-27027 October 1982 Forwards Vols 1-4 to Independent HVAC Review,Lasalle County Nuclear Plant, Final Rept ML20023D1721982-09-15015 September 1982 Forwards LaSalle County Station Independent HVAC Review, Interim Rept.Rept Also Sent to Jg Keppler ML20023D1451982-08-27027 August 1982 Forwards Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. QC Rejectable Welds Have Sufficient Strength to Meet Design Requirements of HVAC Ductwork & Need Not Be Repaired ML20063H1661982-08-26026 August 1982 Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List ML20054H5491982-06-18018 June 1982 Forwards Addendum to Independent Design Review,La Salle County Nuclear Station Unit 1, Final Rept.Distribution List Submitted ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20055A2611981-12-0909 December 1981 Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129 ML20079R1181981-07-15015 July 1981 Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info Encl ML20080E6911980-08-20020 August 1980 Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested ML20079R0961979-09-0707 September 1979 Forwards Project Status Rept,Jul 1979 ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested ML20235C4151974-05-24024 May 1974 Expresses Concern Re Energy Crisis Proclaimed by Ofc of President & Unreasonable Length of Time Needed to Construct & License Nuclear Power Plants 1992-05-05 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML18094B3291990-02-14014 February 1990
[Table view]Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML19324B8051989-09-28028 September 1989 Forwards NPDES Wastewater Monitoring Repts for Listed Facilities ML20246C6741989-08-11011 August 1989 Informs That DOE Will Not Extend Sales Agreement & Will Discontinue Discussions of Sale of Centrifuge Equipment ML20246C6941989-08-11011 August 1989 Discusses Key Issues Affecting Technology Transfer of Classified Gas Centrifuge Equipment & Technology from DOE to Alchemie.Requests That DOE Give Alchemie Necessary Time to Consummate Few Remaining Matters in Appropriate Fashion ML17285B4531989-06-28028 June 1989 Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem B13167, Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity1989-03-0808 March 1989 Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity ML18093B1511988-09-12012 September 1988 Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts ML18093A6401988-02-12012 February 1988 Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 ML20203J3181986-07-18018 July 1986 Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts ML20197H5211986-05-0606 May 1986 Requests That Cp&L/Power Agency Reach Agreement W/O Delay. Util Prepared to Eliminate Joint Ownership in Roxboro 4, Reduce Ownership Interest in Licenses DPR-62 & DPR-71 & Propose Sliding Scale Adjustments B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl1985-11-27027 November 1985 Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl ML18092A8741985-10-15015 October 1985 Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts ML20087M0611983-09-22022 September 1983 Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna ML20080G6411983-07-11011 July 1983 Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808 ML20072J4951983-06-23023 June 1983 Advises That DOE Will Respond to Requests for Emergency Radiological Assistance from Licensees,Federal,State & Local Agencies,Private Organizations or Individuals Involved in Incident Involving Source,Byproduct or SNM ML20081C0621983-04-0505 April 1983 Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request ML20067C1831982-11-24024 November 1982 Forwards Addl Matl Tests Received on 821119 from Region 3 Supplementing Matl Addressed in Independent HVAC Review Final Rept, Oct 1982.Data Reviewed by Welding & Matl Specialists.Comments Encl ML20023D1961982-10-27027 October 1982 Forwards Vols 1-4 to Independent HVAC Review,Lasalle County Nuclear Plant, Final Rept ML20023D1721982-09-15015 September 1982 Forwards LaSalle County Station Independent HVAC Review, Interim Rept.Rept Also Sent to Jg Keppler ML20023D1451982-08-27027 August 1982 Forwards Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. QC Rejectable Welds Have Sufficient Strength to Meet Design Requirements of HVAC Ductwork & Need Not Be Repaired ML20063H1661982-08-26026 August 1982 Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List ML20054H5491982-06-18018 June 1982 Forwards Addendum to Independent Design Review,La Salle County Nuclear Station Unit 1, Final Rept.Distribution List Submitted ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20055A2611981-12-0909 December 1981 Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129 ML20079R1181981-07-15015 July 1981 Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info Encl ML20080E6911980-08-20020 August 1980 Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested ML20079R0961979-09-0707 September 1979 Forwards Project Status Rept,Jul 1979 ML20214U2961977-10-14014 October 1977 Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested ML20235C4151974-05-24024 May 1974 Expresses Concern Re Energy Crisis Proclaimed by Ofc of President & Unreasonable Length of Time Needed to Construct & License Nuclear Power Plants 1990-02-14 |
Text
-- .-
'^* - _ _ _
- * - +If 1e=== - ,
4 p.yY" Y e q. , ,
- ' * - . . SARGENT a LUNDY CNGINECRS
$ 5 E Ab7 MON ROE ST RCC T 2. '
CHIC A G O, ILLINOIS f=O 60 3
\
$ . !# Y t LL PHON E 312 2 f,9 2 O 00 s
August 27, 1982 N Project No. 4266-02 Commonwealth Edison Company LaSalle County Station - Unit 1 !
/ -
i f
Mr. B. R. Shelton Project Enginee' ring Manager <
Commonwealth Edison Company P. O. Box 767 60690 Chicago, Illinois
Dear Mr. Shelton:
Revision 0 dated Enclosed is a copy of report COD-003490, Assessment of Stitch We August 27, 1982, This report has been prepared by l Ductwork Construction.Sargent & Lundy based upon tests that wer Pittsburgh Testing Laboratory. k have determined that the QC rejectable welds h and need not be repaired for that reason.
Shouli you have any question's o_r wish'to discuss this report, please contact.me. ,
Youb very truly, R. H. POLLOCK ,
, , , , R. H. Pollock In duplicat'e .
' Mechanical Project Engineer Enclosure Copics:
R. H. Holyoak (1/1)
/r. E. Watts (1/1)
D. L. Shamblin (1/1)
T. E. Quaka (1/1) ,
L. O. DelGeorge (1/1)
R. J. Mazza (1/0)
D. C. Haan (1/0)
W. G. Schwartz (1/0) W. B. Panchal (1/0)
E. R. Weaver (1/0) File 85.2 M. M. Hassaballa (1/0) 8305190302 830311 PDR FOIA PDR PRENDERS2-366
- - - _ '"5 -