Provides follow-up to 980204 Meeting Between Util & PA Dept of Environ Protection Re Rock Run Creek Crossing,Small Project Joint Permit Application,Addendum
ML20203J551
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/23/1998
From: Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Zomok R
PENNSYLVANIA, COMMONWEALTH OF
References
APS-9283, E67-612, NUDOCS 9803040187
Download: ML20203J551 (3)


Text

_.. . . . _ - . . . . _ .- - . . - - -_- .- . _- - . . _

Thomas N.Mitchell I vc e Prewtent

  • * * )

, Peach Bottom Atenne Power Etaten >

  • ~

PECO NUCLEAR Prc ~ ~

1848 l Sy Road A Unit of PECO Energy Deta. rA 17314 9032 717 456 4000 ran 717 456 4243 February 23,1998 PADF.P File No. E67 612 and APS No. 92M Mr. Raymond P. Zomok, P. E., Chief, Soils & Waterways Section Pennsylvania Department of Environmental Protection (PADEP) Water Management Program South <entral Regional Offico 1 Ararat Boulevard. Room 126 Harrisburg, PA 17110

Subject:

PECO Energy Company, Peach Bottom Atomic Poer Station (PBAPS)

Rock Run Creek Crossng. Small Project Joint Permit Application. Addendum

References:

1. Letter, Thomas N. Mitchell, PECO Nuclear, to Edward Rettinger, PADEP,

" Rock Run Creek Low Flow Crossng Srnall Project Joint Permit Application?

dated 10/2/97.

2. Letter, Raymond P. Zomok, P. E., PADEP, to David Foss, PECO Nuclear,

Technical Deficierces? dated 1/22/98 th. Mr. Zomok:

This letter is provided as a follow-up to a meeting between PECO Nuclear and PADEP on 2/4/98. ' At that meeting PECO Nuclear presented to the PADEP a revised conceptual bndge design in response to your Reference 2 letter, As you are aere, e desire to irdall a waterway crossing over the Rock Run Creek at our Peach Bottom facility in York County. We submitted our initial permit application to you on 10/2/97 (Reference 1). On 1/22/98 the PADEP responded in the Reference 2 letter, irxhcahng that our low flow crossng conceptual design could not be approved. We undeTtand that due to safety and environmental concems Pennsylvania is no longer routinely issuing permits for low ficw type crossngs.

PECO Nuclear herein respectfully submits a modifed Rock Run Creek Crossing design as described in Attachments 1 and 2 to this letter. The design is essentially the same as that which was presented to you at our 2/4/90 rweting. The modified design consists of a relatively conventional bridge with a concrete deck that is approximately 120 feet long and 30 feet wide; deck elevation is flush with the

. creek banks on either side. The c'eck is supported by approximately 45 concrete piles, wth abutments M either end of the span. Structurally, the bndge is very conservatively desigreed and has significant safety margin wth respect to its desigt load of approximately 250 tons. The modified design no longer employs culverts and therefore, will not significantly obstruct creek flow. The hydrology study provided in the original application signifcantly bounds the enclosed design as shown in Attachment 3.

The pwpoeed design has no significant impact on the 9bility of the creek to pass the 100 year flood.

,)

1 T) 9003040187 980223 .

PDR ADOCK 05000171 i

{ g )\

. , . ,-,w.-- - - ,- . ,-

,. February 23,1998 Due to the narrcuing of the overall bndge udth, the area disturbed by construction wil be segrwficantly reduced Cuistruction techniques and malenals are consistent wth thues proposed in the original appication. Therefore, the environmental implicatons of the project are bounded by the original submsttal.

Becauue the design is still conooptual in nature, it is possible that certain details may be refined, it is our intent that the design submstted hortan would bound refinements of this nature. Any mir or design changes whch may be required would be environmentally and hydraulically more conservative, or of no conaaryanos it is requested that your approval of this application allow for such conservative or nonconaary =ntial design refinements.

PECO Nucieer reapartfully requests that your prompt attention be givu) to this matter. We believe that the encioned design is structurally sound, and pocos no sigtwfcant environmental, hydrological, or safety conoems. If you have any questions or require additional information, planeo contact Dave Foss at 717-4564311, We appreciate your cocoeration in this matter.

Sincerely,

$4 C W Thomas N. Mitchell Vloe Premdent, Peacn Bottom Atomic Pcwor Stvan Cc: N. J.- Sproul, Public Servloe Electric & Gas (#o attachments)

R. R. Janati, Cciiviicc:12h of Pennsylvania (Wo attachments)

NRC Document Control Desk (#o attachments)

Tony McMurtray, US NRC, Senor Reedent inspector (Wo attachments)

T, M. Meenck, Atlantic Electric (Wo attachments)

A. F. Kirtyy ill, DelMarVa Power (#o attachments)

R I. McLean, State of Maryland E. Leeds, USNRC. GFPO S. Whaley, USNRC, SFPO 2

," ' Fetxuary 23,1998 l

, txe All wthout attachments unless irdcated OEAP Coordinator 62A 1, Chestertrook Correspondence Control Program 61B-3, Chestertwook D. M. Smith 63C 3, Chestertrook G. R. Rainey 63C 3, Chesterbrook 4 E. W. Callan SMB44, Peach bottom E. J. Cullen S231. Main Office G. D. Edwards A4-1S, Peach Bottorn D. B. Fetters 62C 3 Chestertrook M. P Gallagher SMB4-2, Peach Bottom J. G. Hufnagsl 62A 1, Chesterbrook G. L. Johnston SMB3-5, Peach Bottom R. A. Kankus 61C 1 Chestertrook G. J. Lengyel A4-4S, Peach Bottom R. M. Matty S212 MainOffice(Wattachmenu C.J McDermott S13-1, Main Ofree T. J. Nieseen $3A 1. Chestertrook M .E. Womer A41S, Peach Bottom R. Kalman WW3 2. Peach Bottom Attachments 4