ML20125B285: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20125B285
| number = ML20125B285
| issue date = 10/22/1979
| issue date = 10/22/1979
| title = Forwards Transient W/Failure to Scram in Response to NRC 790817 Ltr.Util Will Implement Recirculation Pump Trip for ATWS as Described in NUREG-0460
| title = Forwards Transient W/Failure to Scram in Response to NRC .Util Will Implement Recirculation Pump Trip for ATWS as Described in NUREG-0460
| author name = Delgeorge L
| author name = Delgeorge L
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7910290287
| document report number = NUDOCS 7910290287
| title reference date = 08-17-1979
| package number = ML20125B289
| package number = ML20125B289
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC

Latest revision as of 22:39, 22 September 2022

Forwards Transient W/Failure to Scram in Response to NRC .Util Will Implement Recirculation Pump Trip for ATWS as Described in NUREG-0460
ML20125B285
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/1979
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML20125B289 List:
References
NUDOCS 7910290287
Download: ML20125B285 (1)


Text

5

's C:mm:nw ;lth Edis:n One First National Plaza. Chicago. Illinois ,

Address Reply to: Post Othce Box 767 Chicago, Illinois 60690 October 22, 1979 l l

l l

l Mr. O. D. Parr, Chief Light Water Reactors - Branch 3 1 Division of Project Management  !

U.S. Nuclear Regulatory Commission l Washington, D.C. 20555

Subject:

LaSalle County Station Units 1 and 2 Anticipated Transient Without Scram (ATWS)

NRC Docket Nos. 50-373 and 50-374 References (a): L. O. DelGeorge letter to O. D. Parr dated March 7, 1979 (b): S. A. Varga letter to B. Lee, Jr.

dated August 17, 1979

Dear Mr. Parr:

As was indicated in Reference (a), Commonwealth Edison ,

is aware of the recent Commission activities related to ATWS in- l cluding NUREG-0460, Supplement 3. Commonwealth Edison shall '

implement a recirculation pump trip for ATWS as described in NUREG-0460, Supplement 3 5 2.3, Table 1, Note 1. It is also acknowledged that there is the potential for other plant modifica-tions on the LaSalle County units in the event an ATWS rule is issued. '

l Furthermore, in response to the directive contained in Reference (b), Commonwealth Edison has developed a procedure which specifically addresses " Transients With Failure to Scram."

An uncontrolled copy of that procedure is attached for your in-formation. This procedure was discussed with Mr. A. Bournia of your staff at the meeting of October 11, 1979 in your offices.

If you have any further questions in this regard, please direct them to this office.

Very truly yours, L. O. DelGeorge Nuclear Licensing Administrator l LOD:mae 97 attachment 9, \

7910290 EF t