ML20133E050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20133E050
| number = ML20133E050
| issue date = 07/29/1985
| issue date = 07/29/1985
| title = Responds to 850301 Ltr & 850508 Meeting to Discuss 850110 Notice of Violation & Proposed Imposition of Civil Penalty. No Mitigation Warranted for Proposed Civil Penalty.Order Imposing Civil Monetary Penalty Encl
| title = Responds to & 850508 Meeting to Discuss 850110 Notice of Violation & Proposed Imposition of Civil Penalty. No Mitigation Warranted for Proposed Civil Penalty.Order Imposing Civil Monetary Penalty Encl
| author name = Taylor J
| author name = Taylor J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = EA-84-104, NUDOCS 8508070557
| document report number = EA-84-104, NUDOCS 8508070557
| title reference date = 03-01-1985
| package number = ML20133E053
| package number = ML20133E053
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 02:04, 10 August 2022

Responds to & 850508 Meeting to Discuss 850110 Notice of Violation & Proposed Imposition of Civil Penalty. No Mitigation Warranted for Proposed Civil Penalty.Order Imposing Civil Monetary Penalty Encl
ML20133E050
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/29/1985
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20133E053 List:
References
EA-84-104, NUDOCS 8508070557
Download: ML20133E050 (3)


Text

!

b

[ssucoq%g

  • UNITED STATES 83 #c o NUCLEAR REGULATORY COMMISSION j

4

$. WASHINGTON, D. C. 20555 ,

\, - /

JUL 2 91985 Florida Power Corporation ATTN: Mr. W. S. Wilgus, Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:

SUBJECT:

PROPOSED CIVIL PENALTY ACTION: EA 84-104 (REPORT NO. 50-302/84-23)

This refers to your letter of March 1,1985 and your meeting with the Director, Office of Inspection and Enforcement on May 8, 1985 in response to the Notice of Violation and Proposed Imposition of Civil Penalty, EA 84-104, sent to you with our letter of January 10, 1985. The violations were identified during a routine safeguards inspection conducted on August 12-16, 1984 of activities authorized by NRC License No. DPR-72, at the Crystal River 3 facility.

After giving carefai consideration to your response and the information presented during the meeting we have concluded for the reasons given in the enclosed Order Imposing Civil Monetary Penalty and its Appendix that no mitigation is warranted' for the proposed civil penalty.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards information is exempt from public disclosure. Therefore, the Appendix to the enclosed Order will not be placed in NRC's Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget, issued under the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely, .

m a s

[.s f

. Taylor Director fice of Ins ction and Enforcement

(

Enclosure:

Order Imposing Civil Monetary Penalty with Appendix CERTIFIED MAIL FdTURN RECEIPT REQUESTED l .,

E ctosce -- . hl?m ,

S1FEG;'A55-l r $,.{, ~gU'M4 8 travnn'eLTUTCN~

ng]DSE?;.aA7; A y;, 73;3 i

PACE IS 2005;33;g*

8508070557 850729 PDR ADOCK 05000302PDR G

e Florida Power Corporation cc w/ encl:

E. M. Howard, Director Site Nuclear Operations P. F. McKee, Nuclear Plant Manager G. R. Westafer, Manager Nuclear Operations Licensing and fuel Management ENCLOT'E.E CCNTaI':S SAFE;U.*,RIS DF:R' 1 ATIS. j UIC2: SEF.iRATIO::, THIS TAGE IS DECC :TRC*. LED. ,

1. s

b Florida Power Corporation cc w/ encl:

E. M. Howard, Director Site Nuclear Operations P. F. McKee, Nuclear Plant Manager G. R. Westafer, Manager Nuclear Operations Licensing and Fuel Management Distribution w/o enc 1:

PDR SECY ACRS CA JMTaylor, IE RVoll:ner, IE

JNGrace, RII*

JAxelrad, IE PRobinson, IE*

JLieberman, ELD

  • VStello,DED/ROGR RBurnett, NMSS LCobb, IE FIngram, PA Enforcement Coordinators RI, RII, RIII, RIV, RV BHayes, 01 SConnelly, 0IA JCrooks, AE0D JPartlow, IE EJordan, IE APuglise, RM EA File ES File ED0 Rdg File DCS I
  • with encl.

i l

l l

D 7 an NG e ad mer J lor

{h 7/ /85 i/J3/85 2//J)85 fv/85 7/ /85 7/g/85 i-t\ E'CI.0SI'F2 CCNT4 INS SAFE 3'lLCSINFORuTI3 ,

UPON SEMATICN, THIS PAGE IS DECONTROLLED.

I