Line 13: Line 13:
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| document type = MEETING MINUTES & NOTES--CORRESPONDENCE, MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
| page count = 3
| page count = 3
| project = TAC:62942
| stage = Draft Meeting
}}
}}


Line 26: Line 28:
OF MEETING HELD DECEMRER 9-11, 1986 - TECHNICAL SPECIFICATION REVIEW (TAC 62942)
OF MEETING HELD DECEMRER 9-11, 1986 - TECHNICAL SPECIFICATION REVIEW (TAC 62942)
The subject meeting was held at the BVPS-?. site as the first of a series of-similar meetings to review the Technical Specifications (TS). Since it was announced as a working meeting, there was no formal-agenda. Enclosed is the meeting attendee list.
The subject meeting was held at the BVPS-?. site as the first of a series of-similar meetings to review the Technical Specifications (TS). Since it was announced as a working meeting, there was no formal-agenda. Enclosed is the meeting attendee list.
Attendees discussed issues raised as a result of review of the staff's draft-Technical Specifications (transmitted by letter dated November 6,1986)'. The applicant provided comments on the draft TS by letter dated November 28, 1986.
Attendees discussed issues raised as a result of review of the staff's draft-Technical Specifications (transmitted by {{letter dated|date=November 6, 1986|text=letter dated November 6,1986}})'. The applicant provided comments on the draft TS by {{letter dated|date=November 28, 1986|text=letter dated November 28, 1986}}.
Since there was no intention on the staff's part to go into details on any proposed requirements, no technical-reviewers were requested to be present.
Since there was no intention on the staff's part to go into details on any proposed requirements, no technical-reviewers were requested to be present.
All discussion was centered on: (1) differences between Unit I and Unit 2 Technical Specifications, (2) proposed requirements as described in the Safety Evaluation Report and supplements, and (3) differences between Unit 2's draft TS and current regulatory requirements.
All discussion was centered on: (1) differences between Unit I and Unit 2 Technical Specifications, (2) proposed requirements as described in the Safety Evaluation Report and supplements, and (3) differences between Unit 2's draft TS and current regulatory requirements.

Latest revision as of 15:51, 5 May 2021

Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements
ML20212F393
Person / Time
Site: Beaver Valley
Issue date: 01/07/1987
From: Tam P
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-62942, NUDOCS 8701090690
Download: ML20212F393 (3)


Text

_- _ -

January 7,1987

+ Docket No. 50-41?.

APPLICANT: Duquesne Light' Company FACILITY: Beaver Valley Power Station, Unit 2 (BVPS-2)-

SUBJECT:

SUMMARY

OF MEETING HELD DECEMRER 9-11, 1986 - TECHNICAL SPECIFICATION REVIEW (TAC 62942)

The subject meeting was held at the BVPS-?. site as the first of a series of-similar meetings to review the Technical Specifications (TS). Since it was announced as a working meeting, there was no formal-agenda. Enclosed is the meeting attendee list.

Attendees discussed issues raised as a result of review of the staff's draft-Technical Specifications (transmitted by letter dated November 6,1986)'. The applicant provided comments on the draft TS by letter dated November 28, 1986.

Since there was no intention on the staff's part to go into details on any proposed requirements, no technical-reviewers were requested to be present.

All discussion was centered on: (1) differences between Unit I and Unit 2 Technical Specifications, (2) proposed requirements as described in the Safety Evaluation Report and supplements, and (3) differences between Unit 2's draft TS and current regulatory requirements.

Solutions to the above items proposed by the attendees are: (1) Duquesne Light Company, as licensee for Unit 1, will submit an amendment re errors and other administrative matters in BVPS-l's TS, (P.)Some quest to sections SER address will be amended after the staff has compared proposed requirements in these sections to the BVPS-1 TS, and (3) In-depth discussions between the applicant and staff reviewers in the next few months will determine what additional 1- requirement will be imposed on BVPS-2.

i l The next meeting will take place in NRC offices and is tentatively scheduled j to be sometime in January, 1987.

i 8701090690 870107 l ADoCK05 cog 2 Peter S. Tam, Project Manager

{DR PWR Project Directorate #2 -

l

. Division of PWR Licensing-A i

Enclosure:

As stated

! cc: See next page

!- DIST"In"T RN ),M QtNRCF1Te]

Pux h R"@ My D. Miller Local PDR OGC-Rethesda i PAD #2 Rdg E. Jordan

. J. Partlow B. Grimes L. Rubenstein ACRS (10)

PWRf2/DPW A~j P -A PTam/ rad ( r

D Mr. J. 1. Carey -

Duouesne Light Company Beaver Valley ? Power Station CC:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duouesne Light Company 2300 N Street, N.W. Beaver Valley Two Pro.iect Washington, DC 20037 P. O. Rox 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Ouality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 John D. Burrows, P.E.

Director, Pennsylvania Emergency Director of Utilities Management Agency State of Ohio Room R-151 Public Utilities Commission Transportation A Safety Building 180 East Rroad Street Harrisburg, Pennsylvania 17190 Columbus, Ohio 43266-0573 Mr. T. J. Lex Bureau of Radiation Protection Westinghouse Electric Corporation PA Department of Environmental Power Systems Resources P. O. Box 355 ATTN: R. Janati Pittsburgh, Pennsylvania 15230 P.O. Box ?063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Rox 2325 nuquesne Light Company Boston, Massachusetts 07107 Post Office Fox 4 Shippingport, Pennsylvania 19077 Mr. J. Beall U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre i 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279

U. S. NRC, Recion I 631 Park Avenue
King of Prussia, Pennsylvania 15229 i

l l

y- -.r,-- -- - -

-r --


,,-.---,,.w , --m -.-- - . - - . y -= - , - - _ _ - .

- - - --------r e - m -- .-,-9--- --

Enclosure Beaver Valley Unit ?

Tech Spec Review Meeting 1 NAME ORGANIZATION PeIer Tam NRC Licensing Proiect Manager

+

Jaime Guillen Pro.iect Engineer, NRC Jim Reall BVPS-2 Senior Resident Inspector, NRC Bill Troskoski RVPS-1 Senior Resident Inspector, NRC Cal Moon NRC - Facilities Operations Branch Clyde Morton EGAG San Ramon, CA (LLNL)

Fred Schuster DLC BV-2 Operations Carl Sisco DLC BV-2 Operations

, Ron Fedin DLC Regulatory Affairs Mike Grigsby V Unit 2 Licensing Bob Jones R Project Engineer (BVPS-2)

Ralph Surman R Site Engineering Team Kent Daschke R Technical Specifications Charles Chace 5WEC - Plant Services

- Ken Grada Manager of Nuclear Safety, Dl_C 4

i 4

i i

n i

}

l

- . _ _ _ . _ . _ _ _ _ _ . . - _ . _ . ~ _ _ _ _ . _ - _ . - _ _ _ - _ _ , . . _ . _ _ - - . _ _ _ _ - . _ , - - , . . _ .