Letter Sequence Meeting |
|---|
|
|
MONTHYEARIR 05000412/19850101985-06-20020 June 1985 Insp Rept 50-412/85-10 on 850429-0503.No Violations Identified.Major Areas Inspected:Activities Re Installation of safety-related Electrical/Instrumentation Components & Associated Circuits Project stage: Request ML20138D9431985-10-17017 October 1985 Notification of 851022 Meeting W/Util & S&W in Bethesda,Md to Discuss Fire Protection Deviation Requests Project stage: Meeting ML20137C5581986-01-0909 January 1986 Requests Postponement of Generic Requirement for Extensive Pressure Isolation Valve Leak Testing Until Net Safety Benefit Determined by Crgr.Ser Open Item Should Be Closed Until CRGR Analyses Complete Project stage: Other ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively Project stage: Meeting ML20215K7361986-10-23023 October 1986 Notification of 861105 Meeting W/Util in Bethesda,Md to Discuss Issues Re Fire Protection,Including Util Deviations from Staff Technical Position Project stage: Meeting ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20207L5331987-01-0606 January 1987 Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR Project stage: Other ML20207N1901987-01-0808 January 1987 Notification of 870129 Meeting W/Util in Shippingport,Pa to Conclude 4-day Site Review of Fire Protection Issues.Issues Identified as Confirmatory Issue 48 & Backfit Issue 7 in Sser 3 Project stage: Meeting ML20213A5671987-01-27027 January 1987 Requests Security Passes Be Provided to Personnel for 4-day Site Review to Begin on 870108 Re Fire Protection Issues Project stage: Other ML20209F8201987-01-30030 January 1987 Forwards Amend 14 to Fsar,Consisting of Updated FSAR Fire Protection Info Provided in Author .Info Affects Section 9.5.1 of SER Project stage: Other ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl Project stage: Meeting ML20211B9951987-02-11011 February 1987 Forwards Addl Info Re Fire Protection,Including Info Re SRP Deviation on Structural Steel & Vendor Justification of Thickness Requirements for HVAC Ductwork Fire Wrap,Per NRC 870126-30 Fire Protection Site Visit Project stage: Other ML20212P9231987-03-0606 March 1987 Forwards Revised Tech Specs Re Pressure Isolation Valve Testing,Per 870206 Telcon.Proposed Tech Specs Do Not Include Rev 5 of STS Item 4.4.6.2.2.(b) & (D) for Listed Reasons Project stage: Other ML20210C3141987-04-30030 April 1987 Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required Project stage: RAI ML20214J6981987-05-18018 May 1987 Describes Fire Detection & Suppression Sys at Facility (Ref NRC ).Present Capability of Sys Adequate & Overall Plant Safety Would Not Be Significantly Increased by Modifying Suppression Sys Alarm Circuits.W/Four Figures Project stage: Other ML20214J9301987-05-18018 May 1987 Forwards Changes Expected to Occur in Next Rev to Amend 18 of Fsar,Section 9.5 Re Fire Protection Project stage: Other ML20214J9731987-05-20020 May 1987 Provides Compensatory Measures to Deal W/Fire Zones Containing Equipment Necessary for Tech Spec Equipment Operability Where fire-rated Assemblies Incomplete.Hourly Fire Patrols Conducted When Necessary Project stage: Other IR 05000412/19870371987-05-28028 May 1987 Insp Rept 50-412/87-37 on 870420-0501.No Violations Noted. Major Areas Inspected:Preoperation & Startup Test Program, Startup Test Procedure Review,Qa Interfaces & Emergency Diesel Generator Instrumentation Vibration Project stage: Request ML20234C4631987-06-24024 June 1987 Forwards Util Comments on Low Power License for Facility, Including Discussion of Fire Protection & Plant Safety Monitoring Sys.Util Will Work W/Nrc Project Manager to Resolve Comments Project stage: Other ML20235J2981987-07-0606 July 1987 Responds to Questions Posed by D Kubicki in Telecon Re Fire Protection Supervisory Circuits & Schedule for Completion Project stage: Other ML20235Q7051987-09-30030 September 1987 Forwards Testing Status of CO2 Fire Suppression Sys. Overpressure Problems Associated w/CO2 Discharge Testing Eliminated by Installation of Back Draft Dampers.Expected Completion Date Revised to 871231 Project stage: Draft Other ML20234E2911987-12-31031 December 1987 Advises That CO2 Concentration Testing Successfully Completed for All Eight Zones,Per 870930 Commitment to Provide Schedule for Completion of Unfinished Fire Protection Items Project stage: Other ML20151L9681987-12-31031 December 1987 1987 Annual Rept of Facility Changes,Tests & Experiments Project stage: Other ML20196A2341988-06-20020 June 1988 Concludes That Based on Licensee Annual Rept of Facility, Changes,Tests & Experiments & 880608 Site Visit, Changes,Tests & Experiments Meet Criteria in 10CFR50.59. Lists Improvements Recommended to Licensee During Visit Project stage: Other ML20206A7351988-11-0808 November 1988 Advises That Util 880722 Submittal of 1987 Rept of Facility Changes,Tests & Experiments Meet Criteria in 10CFR50.59 & Acceptable.Comments Listed Project stage: Other 1987-02-11
[Table View] |
Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively| ML20206J005 |
| Person / Time |
|---|
| Site: |
Beaver Valley |
|---|
| Issue date: |
06/23/1986 |
|---|
| From: |
Tam P Office of Nuclear Reactor Regulation |
|---|
| To: |
Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| TAC-62871, TAC-62935, NUDOCS 8606260382 |
| Download: ML20206J005 (8) |
|
Text
,_
P Juna 23,1986
' Docket No. 50-412 DISTRIBUTION C 6'PDR ~ ~ ] L. Rubenstein ACRS (1
^NRC P. Tam D. Miller APPLICANT:
Duquesne Light Company Local PDR OELD FACILITY:
Beaver Valley Unit 2 PAD #2 Rdg E. Jordan J. Partlow B. Grimes
SUBJECT:
SUMMARY
OF SOME MEETINGS HELD DURING 1984 AND 1985 A number of technical meetings were held in the period of late 1984 to late -
1985, but have not been documented by the previous project managers. All of these meetings dealt with licensing issues which were either subsequently resolved in the staff's Safety Evaluation Report (SER) dated October 1985; SER Supplement 1 dated May 1986, or will be addressed in a future supplement.
The sole purpose of this summary, therefore, is to document the names of j
meeting attendees and meeting agenda (if available). Enclosed are the lists of attendees for these meetings. Other meetings that have already been individually documented are not included here.
l Date of Meeting Subject Notice Dated Enclosure No.
11/30/84 Structural engineering 11/27/84 1
issues 12/7/84 Geosciences issues 11/27/84 2
1/17/85 Pressure isolation valves 1/15/85 3
j 8/20/85 Power systems issues 4
i l
9/19/85 Computer code MULTIFLEX 9/11/85 5
i 10/22/85 Fire protection issues 10/17/85 6
1
/s/
i Peter Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A i
Enclosures:
l As stated 4
cc: See next page PD#2:PM PD M i
2:AD PTam:1 DM9Ter
'DMcDonald 6/23/8$
6
/86
'6/g/86 I
8606260382 860623 PDR ADOCK 05000412 A
PDR 1
11/30/84 Attendance List Reaver Valley, Unit 2 Meeting with 5GEB B. K. Singh NRC/NRR/DL/LB#3 Project Manager P. A. Cadena DLC Sr. Project Engineer J. D. Sutton SWEC Assistant Project Engineer R. S. Orr W PED Advisory Engineer C. W. Lin W PED Advisory Engineer J. Stabb ULC Licensing Engineer J. D. O'Neil DLC Project Engineer E. T. Eilmann DLC Sr. Project Engineer /Lic.
S. P. Chan NRC/SGEB Sr. Struct. Engineer N. C. Chokshi NRC/SGEB Sr. Struct. Engineer D. G. Jeng NRC/SGEB Section A Leader G. Lear NRC/SGEB Chief SCEB K. C. Leu NRC/SGEB Sr. Struct. Engineer D. J. Chamberlain SWEC Lead Licensing Engineer S. P. Sekerak SWEC Mech. Engineer N. A. Goldstein SWEC Consultant, EMD J. A. Curtin SWEC Supervisor Struct. Engineer G. R. Tilton SWEC Principal Structural Engineer i
r -
e s --- -
12/7/84 e
Geosciences Meeting Attendance List Beaver Valley Unit 2 B. K. Singh NRC/NRR/DL/LBf3 Project Manager L. Heller NRC/DE/SGEB Geotechnical S. L.
A. Luchs S&W Chief Geotech Engineer J. D. O'Neil DLC Project Engineer J. D. Sutton SWEC Asst. Project Eng.
C. W. Lin W
Advisory Engineer G. R. Tilton 3WEC Principal Structural Engineer D. McMullen NRC/GSB Geologist G. Giese-Koch NRC/GSB Geophysicist L. Reiter NRC/GSB Section Leader, Seismology I. M. Idriss Woodward-Clyde Consultant to DLC J. T. Christian SWEC Consultant to DLC D. Hunt SWEC Lead Geotechnical Engineer P. A. Cadenia DLC Sr. Proj. Engineer K. C. Leu NRC/DE/SGEB Sr. Struct. Engineer H. K. Acharya SWEC Seismologist D. E. Shaw Consultant Consultant to DLC J. A. Jan DLC Sr. Proj. Engineer i
G. Lear NRC Chief SGEB l
4 l
l..
/
1/17/85 Attendance List Beaver Valley Unit 2 Mechanical Engineering Branch PIV Leak Testing B. K. Singh NRC/NRR/DL/LB#3 Project Manager
- 0. Rothberg NRC/NRR/DE/MEB Engineer F. C. Cherny NRC/DE/MEB Section Leader F. C. Lin DLC/NCD/Eng.
Project Engineer V. Ruppert DLC/0PS SVG F. Schuster DLC/0PS SUG J. R. Houghton DLC/NCD Eng.
Technical Consultant J. Szyslowski DLC/ Rec. Affairs Sr. Project Engineer l
R. Fedin DLC/ Regulatory Affairs Sr. Project Engineer E. Lantz NRC/NRR/RSB Nuclear Engineer i
4
i
/
(cont.)
PROPOSED AGENDA Pressure Isolation Valve Leak Testing Meeting (MEB Question 210.40) l DATE:
January 17, 1985 TIME:
1:00 p.m.
LOCATION: Air Rights Building, Room 5033, Bethesda, MD I.
Objective of Review Pertinent to SC-1/SC-2 Interface Valves II. Discussion of Valve Testing for SC-1/SC-2 Interface including:
)
A.
Other Adjacent Valves
~
B.
Applicability of ASME XI/10CFR50 Appendix "J" Testing C.
Limiting Conditions of Operation (Technical Specifications) i l
l i
j 8/?0/85 Beaver Valley Unit 2 Meeting with Power Systems Branch Attendance List B. K. Singh NRR/DL Project Manager C. H. Wilbur SWEC Asst. Project Engineer F. P. Walker SWEC Elec. Engineer - Staff H. Marcus SWEC Elec. Engineer E. F. Heneberry SWEC Sr. Elec. Engineer S. Rhow NRR/PSB E. F. Kurtz, Jr.
DLC Mgr. Regulatory Affairs A. R. Ungaro NRR/DSI/PSB Supervisor G. L. Beatty DLC Sr. Project Engineer R. E. Martin DLC Mgr. Engineering J. J. Konkus DLC Project Engineer j
=
9/19/85 Attendance List Beaver Valley 2, Multiflex Computer Code i
B. K. Singh NRR/DL/LBf3 Project Manager E. D. Throm NRR/DSI/RSB K. Takeuchi W Nucl. Safety D. Bhandari IT MED M. Wills il Nucl. Safety T. Timmons il Nucl. Safety Mgr. Reload Safegaurds K. Troxler Vlc Licensing Engineer H. L. Brammer NRR/DE/MEB Y. Li NRR/DE/MEB S. L. Wu NRR/DSI/CPB P. Y. Chen NRR/DL/SEPB G. W. Knighton NRR/DL/LBf3 J. McIwerney W Nucl. Safety Mgr. - Mech Equip Sys. Licensing B. Hall II Nucl. Safety Licensing Engineer 1
9 i
t k
I i
l I
i 10/22/86 Attendance List Beaver Valley 2, Fire Protection 4
R. L. Ferguson NRR/DE/CMEB K. S. West NRR/DE/CMEB J. D. Harding D'.C - BV2 - Eng.
E. Eilmann DLC-BV2 - Licensing F. Collins SWEC - BV2 - Eng.
F. Nelson DLC - BV2 - Pre-Op.
J. Maracek DLC - BV1 - Licensing B. K. Singh NRR/DL d
5 i
j i
- n. n-e.-..
--e, u - -
-n-
-- - - -, -