J LICENSEE:
Duquisnm Light CompIny February 4, 1999 1
' s FACILITY:
Buv:r Vallsy Pow:r Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING WITH DUQUESNE LIGHT COMPANY (DLC) STAFF CONCERNING CURRENT AND ANTICIPATED LICENSING ISSUES F OR l
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (BVPS-1 and BVPS) l On January 19,1999, Nuclear Regulatory Commission (NRC) staff met with representatives of DLC to have a general discussion regarding current and anticipated licensing issues for BVPS-1 and BVPS-2. The licensee had requested this meeting. Enclosure 1 is a list of meeting attendees. Enclosure 2 is a copy of the handout material.
The meeting attendees initially discussed the licensing actions currently under NRC review for which DLC would prefer te have reviews completed first. This list is included at the front of. The licensee noted that their priorities for these were established based on need
]
for an upcoming outage, need for resolving operator workarounds, or need for closing out l
voluntarily instituted administrative controls. The NRC staff noted that a timely response by DLC to any requests for additional information will be required in order for the technical staff to complete the reviews in a time frame which supports DLC's schedule.
The open licensing issues for BVPS-1, BVPS-2 and DLC's plans for near-term license f
amendment request (LAR) submittals were subsequently discussed. NRC staff noted that open licensing actions which are more than 2 years old are receiving heightened attention within the NRC to ensure these reviews are completed this year. This primarily affects BVPS-2 since the open BVPS-1 licensing actions are allless than 2 years old. Regarding DLCs plans j
for near-term LAR submittals, DLC noted that all LARs for BVPS-1 which resulted from the multi-discipline analysis team's (MDAT) reviews in 1998 have been submitted to the NRC.
There are 2 LARs for BVPS-2, which were identified during the MDAT reviews, that will be submitted to the NRC in March 1999. DLC also noted that they will be submitting 2 or 3 i
Quality Assurance Program Changes, which affect both units, for NRC review.
Original signed by:
Daniel S. Collins, Project Manager
\\
Project Directorate 1-1 k
Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation
- Docket Nos. 50-334 and 50-412 g
O
Enclosures:
- 1. List of Attendees"
- 2. Licensee Handouts cc w/encis: See next page DISTRIBUTION:
See next page q
,y,g
.q q7-~7 M
t_m u m
_a w DOCUMENT NAME: G:\\ BEAVER \\BVMTGMIN.WPD -
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy l 0FFICE -
PM: POI-1 N
lE LA:PDI 1
,p l
D:PDI 1 M d l
l l
l NAME DColLins/rsL /)M -
Mo'Brien i t Af D SBalwa AM l DATE 02/ '//99 02/ V /99 02/1J /99 9902100132 990204
- ^"icial Record Copy PDR ADOCK 05000334 P
PDR-
e oneog j
g
'a UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WA5 HIN GTON,' D.C. 20655-0001 h,% g,,
n l
Fetruary 4,1999 l
LICENSEE:
Duquesne Ught Company l
FACILITY:
Beaver Valley Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING WITH DUQUESNE LIGHT COMPANY (DLC) STAFF CONCERNING CURRENT AND ANTICIPATED LICENSING ISSUES FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (BVPS-1 and BVPS)
On January 19,1999, Nuclear Regulatory Commission (NRC) staff met with representatives of DLC to have a general discussion regarding current and anticipated licensing issues for BVPS-1 and BVPS-2. The licensee had requested this meeting. Enclosure 1 is a list of meeting attendees. Enclosure 2 is a copy of the handout material.
The meeting attendees initially discussed the licensing actions currently under NRC review for which DLC would prefer to have reviews completed first. This list is included at the front of. The licensee noted that their priorities for these were established based on need for an upcoming outage, need for resolving operator workarounds, or need for closing out voluntarily instituted administrative controls. The NRC staff noted that a timely response by DLC to any requests for additional information will be required in order for the technical staff to complete the reviews in a time frame which supports DLC's schedule.
The open licensing issues for BVPS-1, BVPS-2 and DLC's plans for near-term license amendment request (LAR) submittals were subsequently discussed. NRC staff noted that open licensing actions which are more than 2 years old are receiving heightened attention within the NRC to ensure these reviews are completed this year. This primarily affects BVPS-2 since the open BVPS-1 licensing actions are allless than 2 years old. Regarding DLCs plans for near-term LAR submittals, DLC noted that ali LARs for BVPS-1 which resulted from the multi-discipline analysis team's (MDAT) reviews in 1998 have been submitted to the NRC.
There are 2 LARs for BVPS-2, which were identified during the MDAT reviews, that will be submitted to the NRC in March 1999. DLC also noted that they will be submitting 2 or 3 Quality Assurance Program Changes, which affect both units, for NRC review.
/
J C do -
Daniel S. Collins, Project Manager Project Directorate I-1 l
Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encis: See next page
'~
LICENSEE:
Duqutsn3 Light C:mpany February 4, 1999 FACILITY:
Berv:r Vallay Power Station, Units 1 cnd 2
SUBJECT:
SUMMARY
OF MEETING WITH DUQUESNE LIGHT COMPANY (DLC) STAFF l
CONCERNING CURRENT AND ANTICIPATED LICENSING ISSUES FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (BVPS-1 and BVPS)
On January 19,1999, Nuclear Regulatory Commission (NRC) staff met with representatives of DLC to have a general discussion regarding current and anticipated licensing issues for BVPS-1 and BVPS-2. The licensee had requested this meeting. Enclosure 1 is a list of meeting attendees. Enclosure 2 is a copy of the handoul material.
The meeting attendees initially discussed the licensing actions currently under NRC review for which DLC would prefer to have reviews completed first. This list is included at the front of j. The licensee noted that their priorities for these were established based on need i
for an upcoming outage, need for resolving operator workarounds, or need for closing out voluntarily instituted administrative controls. The NRC staff noted that a timely response by DLC to any requests for additional information will be required in order for the technical staff to l
complete the reviews in a time frame which supports DLC's schedule.
l l
The open licensing issues for BVPS-1, BVPS-2 and DLC's plans for near-term license amendment request (LAR) submittals were subsequently discussed. NRC staff noted that open licensing actions which are more than 2 years old are receiving heightened attention within the NRC to ensure these reviews are completed this year. This primarily affects BVPS-2 since the open BVPS-1 licensing actions are allless than 2 years old. Regarding DLCs plans for near-term LAR submittals, DLC noted that all LARs for BVPS-1 which resulted from the multi-discipline analysis team's (MDAT) reviews in 1998 have been submitted to the NRC.
There are 2 LARs for BVPS-2, which were identified during the MDAT reviews, that will be
- submitted to the NRC in March 1999. DLC also noted that they will be submitting 2 or 3 Quality Assurance Program Changes, which affect both units, for NRC review.
Original signed by:
Daniel S. Collins, Project Manager Project Directorate 1-1 Division of Reactor Projects - l/II Office of Nuclear Reactor Regulation i
Docket Nos. 50-334 and 50-412
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encis: See next page DISTRIBUTION See next page DOCUMENT NAME: G:\\ BEAVER \\BVMTGMIN.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy t
with attachment / enclosure "N" = No copy l
DFFICE PM:PDI 1 lE LA:PDI-1 l
D:PDI-1 M A l
l l
.w NAME DCollins/rst /)E M0'Brien.1* m Stajwe KR DATE 02/'f/99 '
02/ V/99 D2/lf /99
~
Official Record Copy
-e, -
i iL Meeting Summary Distribution E-Mail (Enclosure 1)
Hard Coov (all enclosures)
S. Collins /R. Zimmerman
. Docket File ;
B.Boger PUBLIC
-J. Zwolinski PDI-1 R/F S. Bajwa.
D. Collins S. Little -
OGC G. Shear.
ACRS P. Eselgroth, RGN I D. Screnci cc: Licensee & Service List _ (with all enclosures)
L
(
.b
- )
s i
g
_m:
4
,S
- _w.
4 A
a h
-aA._
q s
...L_-
J w
4,4_,,
a4 4
.;.J AAu4
.,,4 p
J Meeting Summary Distribution E-Mail (Enclosure 1)
Hard Coov (all enclosures) 1 S. Collins /R. Zimmerman Docket File 1
B.Boger
- PUBLIC J. Zwolinski PDI-1 R/F S. Bajwa D. Collins S. Uttle OGC G, Shear ACRS i
P. Eselgroth, RGN I D. Screnci cc: Licensee & Service List (with all enclosures) i
+
4 Duquesne Ught Company Beaver Valley Power Station, Units 1 & 2 cc:
~
Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.
Environmental Resources Washington, DC 20037 ATTN: MichaelP. Murphy Post Office Box 2063 Director-Safety and Ucensing Harrisburg, PA 17120
' Department (BV-A)
Duquesne Light Company Mayor of the Borough cf Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith Regional Administrator, Region l West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission -
Post Office Box 298 180 East 3 road Street Shippingport, PA 15077
- Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Ught Company Management Agency Beaver Valley Power Station 3
Post Office Box 3?21 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President Ohio EPA-DERR Nuclear Services (BV-A)
ATTN: Zack A. Clayton Post Office Box 1049 -
Mr. J. E. Cross Columbus, OH 43266-0149 President-Generation Group Duquesne Ught Company Dr. Judith Johnsrud Post Gifice Box 4 National Energy Committee Shippingport, PA 15077 Sierra Club 433 Orlando Avenue Mr. J. A. Hultz, Manager
. State College, PA 16803 Projects & Support Services First Energy Duquesne Ught Company 76 South Main Street i
Beaver Valley Power Station Akron, OH 44308 PO Box 4 -
Shippingport, PA 15077 ATTN: Kevin L Ostrowski, Division Vice
]
President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)
N
{
-.. =. - - -
y LIST OF ATTENDEES DUQUESNE LIGHT COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 JANUARY 19,1999 1
I NAME ORGANIZATION D. Collins NRC/NRR M. Ackerman DI C L. Berry DLC R. Hruby DLC i
(
1
(As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Pnonty Trsk No.
Task Description Date Action By DLC person Completed No.
Comments MA4149 BV Extend SG Tube 11/11/98 NRC_
K. Pointer 1
LAR 1A-261 inspection Surveillance Interval Requested amendment from 6/26/99 to 13th Refueling by 12/31/98.
Outage MA0746 BV USQ for increased 01/29/98 NRC R. Ireland 2
LAR 2A-120; submitted Control Room Operator additionalinformation by Radiological Doses letter L-98-195 dated 11/9/98.
BCO 2-98-001 due restart 2R7.
MA2324 BV Revise Reactor Trip 07/09/98 NRC Pointer / Berry 3
Setpoint for Operation with BCO 1-98-008 expires
(
Inoperable Main Steam Safety 1R13.
[
Valves j
MA2325 BV Revise Reactor Trip 07/09/98 NRC Pointer /Beny 3
LAR 2A-81 Setpoint for Operation with BCO 2-98-007 expires inoperable Main Steam Safety 4/28/99.
l Valves MA0622 BV Review of UFSAR 01/17/98 NRC F. Lipchick 4
LAR 1 A-250; submitted Change forincrease in Control additionalinformation on Room Operator Dose 11/9/98 by letter L 196. BCO 1-98-001 expires 7/17/99.
mad 440 BV TS & Bases changes to 12/24/98 NRC R. Ireland 5
LAR 1A-262 remove rod pos., deviation, Operations requests insertion limit, & axial flux diff.
amendment by 7/21/99 monitors C$winwonnmisc\\ajdtask3 Enclosure 2
... ~.
~
t BVPS TAC List by Priority N3. (Cont.)
l (As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Pnonty Tcsk No.
Task Description Date Action By DLC person CcH fi.;ed No.
Comments MA4441 BV TS & Bases changes to
.12/24/98 NRC R. Ireland 5
LAR 2A-135 remove rod pos. deviabon, Operations requests insertion limit, & axial flux diff.
amendment by 7/21/99.
i monitors.
t f
MA3839 BV Revise TS to Modify 10/15/98 NRC R. Ireland 6
LAR 1 A-246 Reporbng Requrements and Letter L-98-250 dated Make Administratwe Changes 12/14/98 forwarded typed pages. CARF 971578-02 requwes amendment by 12/31/99.
MA3840 BV Revise TS to Modify 10/15/98 NRC R. Ireland 6
[
Reportmg Requirements and Typed pages forwarded Make Administratwe Changes by L-98-250 dated 12/14/98. CARF 971578-I 02 requwes amendment by 12/31/99.
MA3837 BV Revise TS Bases to 10/15/98 NRC L Berry 7
Provide Tolerances for RPS 204) dated 10/23/98 Time Constants forwarded typed pages NRC reissuing pages I
(Not on current TAC list)
MA3838 BV Revise TS Bases to 10/15/98 NRC L Berry 7
LAR 2A-133;L-98-204 Provide Tolerances for RPS dated 10/23/98 forward Time Constants typed pages NRC to reissue pages _
(Not on current TAC list) i C$winwordmischjdtask3 l l
l
g BVPS TAC List by Priority No. (Cont.)
(As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Prionty Task No.
Task Description Date Action By DLC person Completed No.
Comments MA0333 BV-2 -2nd Ten YearISI Plan 12/09/97 NRC F. Lipchick 8
(L-97-069); RAI on with ten ISI Relief Requests 6/1/98; Reply to RAI on 7/29/98 by letter (L-98-163)
MA4438 BV TS 3/4.8.1 "AC Sources" 12/24/98 NRC K. Pointer 9
LAR 1 A-258 changes for EDG fuel oil vol.,
BCO 1-98-010 and load rejechon, and frequency BCO 1-98-011 expire.
i rqmts.
1/31/2000 MA4439 BV TS 3/4.8.1 "AC Sources" 12/24/98 NRC K. Pointer 9
LAR 2A-129 changes for EDG fuel oil vol.,
BCO 2-98-009 and load rejection, and frequency BCO 2-98-010 expire rqmts.
2-28-2000. BCO 2 012 expires 3/12/2000.
M98137 BV TS 3.4.5 to Allow Steam 03/10/97 NRC R. Ireland 10 1.AR 2A-111 GeneratorTube Sleeving Use RAI response by letter CE Process L-97-023 dated 9/17/97.
May request DLC to revise RAI response.
Engineering would like amendment in Spring 2000.
I I
C:\\winword\\ misc \\ajdtask3
~
~
-~
-(As of 1/11/99)
Date DLC NRC Application Required
- Responsible Action to be Pnonty Tcsk No.
~ Task Description Date Action By DLC person Completed No.
Comments M83590 BV-1 -IPEEE for Extemal 06/30/95 NRC J. Maracek N/A RAI response to NRC by Events (GL 88-20) letter Supplement 4 L-98-073 dated 4/19/98
[
I M93429 BV GL 95 Pressure 10/16/95 NRC J. Maracek N/A 180 Day Response Locking and Thermal Binding of provided byletter dated Safety-related Power-operated 2/13/96 Gate Valves l
M96777 BV Assurance of Equipment 10/29/96 DLC R. Fedin 1/31/99 N/A RAI response by letter L-Operability and Containment 98-129 dated 6/30/98 j
integnty, GL 96-06 Letter to NRC to correct i
statement in L-98-129 M97015 BV GL 96-05 MOV 11/18/96 NRC J. Maracek N/A Updated response l
Capability Penodic VenficatKm provided by letter L i 072 dated 4/13/98 M98545 BV Degradation of CRD 04/30/97 NRC B. Sepelak N/A Original response Mech. Nozzles & OtherVessel provided by letter dated Closure (GL 97-01) 7/30/97.
Response to RAIwas due by 11/25/98, requested extension to 1/15/99. RAI submitted
[
by letter L-99-001 dated 1/7/99.
i i
i C:\\winworemisc\\ajdtaskt l
~
^-
~-
(As of 1/11/99)
DMe DLC NRC l'
Application Required Responsible Action to be Prionty Trsk No.
Task Description Date Action By DLC person Completed No.
Comments i
I M99959 BV Assur. of Suff. NPSH for 11/06/97 NRC J. Maracek N/A (GL 97-04); Response ECCS & Containment Heat prowded to NRC on i
Renywal Pump 1/6/98 (ND3NSM:8025)
Meeting with NRC l
1/19/99 MA0525 BV RAI on Reactor Vessel 07/09/98 NRC R. Ireland N/A Submitted by letter L f Integrity (follow-up to MPA 133 L201G) i MA0822 BV Review of UFSAR 01/17/98 NRC F. Lipchick 4
LAR 1 A-250; submdted i
Change forincrease in Control additionalinformation on r
Room Operator Dose 11/9/98 by letter L !
196. BCO 1-98-001 expires 7/17/99.
MA0895 BV Degradation of Steam 03/30/98 NRC R. Ireland N/A Response prowded by GeneratorInternals (GL 97-08) letter L-98-009 i
i MA1665 BV Part Length CRDM 04/28/98 NRC R. Fedin N/A Response prowded by i
Housing issue letter (L-98-084)
I e
MA1806 BV Year 2000 Readiness of 08/06/98 DLC J. Maracek 7/1/99 N/A Follow-up response due i
Computer Systems at Nuclear to NRC by 7/1/99 i
Power Plants (GL 98-01)
't J
CAwinworamischyttaski l
=-
. (As of 1/11/99)
'i Date DLC NRC Application Required Responsible Action to be Pnonty l
Tcsk No.
Task Description Date Action By DLC person Completed No.
Comments MA2324 BV Revise Reactor Trip 07/09/98 NRC Pointer / Berry 3
LAR 1A-214 Setpoint for Operation with BCO 1-98-008 expires inoperable Main Steam Safety 1R13.
Valves MA3839 BV Revise TS to Modify 10/15/98 NRC R. Ireland 6
LAR 1A-246 Reporting Requirements and Letter L-98-250 dated Make Administrative Changes 12/14/98 forwarded typed pages. CARF 971578-02 requires amendment by 12/31/99.
j MA4149 BV Extend SG Tube 11/11/98 NRC K. Pointer 1
L.AR 1A-261 inspechon Surveillance Interval Requested amendment from 6/26/99 to 13th Refueling by 12/31/98.
Outage 9
MA4376 BV QA Program change; 12/8/98 NRC G. Beatty N/A Submitted byletter L.
condshonal release of material 221 dated 12/8/98. 60 pending documentation receipt day response required by l
NRC.
MA4438 BV TS 3/4.8.1 "AC Sources" 12/24/98 NRC K. Pointer 9
LAR 1A-258 changes for EDG fuel oil vol.,
BCO 1-98-010 and load rejechon, and frequency BCO 1-98-011 expire rqmts.
1/31/2000 i
?
l C$winworemisd-N1 '
l L
t BVPS Unit 1 TAC List (Cont.)
~ (As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Pnonty Task No.
Task Description Date Action By DLC person C_ompleted No.
Comments
[
MA4440 BV-1 -TS & Bases changes to 12/24/98 NRC R. Ireland 5
LAR 1A-262 remove rod pos., deviabon, Operabons requests
}
inserbon limit, & axial flux diff.
amendment by 7/21/99
[
monitors t
BV QA Program description -
12/24/98 NRC G. Beatty N/A Sutwnstted by letter L !
change (Limit QS review) 224 dated 12/24/98. 60 f
day response required by NRC.
(Not on current TAC list)
MA3837 BV Revise TS Bases to 10/15/98 NRC L Berry 7
LAR 1A-260; letter (L i Provide Tolerances for RPS 204) dated 10/23/98 Time Constants forwarded typed pages NRC reissuing pages
[
(Not on current TAC list)
M72264 BV Licensee Performance NRC N/A PM Activity Evaluabon M72383 BV Headquarters Focal NRC N/A PM Activity l
Point forInformabon &
i Commumcabon i
M72503 BV SALP Report Preparation NRC N/A PM Activity 5
&.".ti.";.s Attendance MA2514 BV PM Regional interface NRC N/A PM Activity i
3 C:\\winword\\misciajdtaski >
. BVPS Unit i TAC List (Cont.)
- (As of 1/11/99)
Date DLC NRC Applicabon Required Responsible Action to be Prionty Task No.
Task Desenpbon Date Action By DLC person Completed No.
Comments MA2622 BV PM Support to
-NRC N/A PM Actmty EDOCommission MA2730 BV PM Event Follow-up NRC N/A PM Actmty MA2838 BV PM Support for NRC N/A-PM Activity Information Systems MA2946 BV PM Visits to Site, Regen, NRC N/A PM Actmty Licensee MA3054 BV PM Effort Expended on NRC N/A PM Actmty l
FSAR/50.59 Report / Commitment Poll MA3162 BV PM Budgeting Actmbes NRC N/A PM Actmty MA4017 BV Potential for Degradation NRC N/A PM Actmty of ECCSCSS after LOCA GL-98-04 i
C:\\winwordmisc\\ajdtask1 !
~
-f,
i (As of 1/11/99)
Date DLC NRC Apphcation Required Responsible Action to be Pnonty Task No.
Task Descriphon Date Action By DLC person Completed No.
Comments M69428 BV GL 87 Seismic 09/22/92 DLC B. Sepelak End of 1R13 N/A SER received 12/9/98.
Qualif. of Mech. & Elec. Equip.
Resolve outhers by end in Operatog Plants of1R13. Forward completion letter to NRC M95792 BV Editorial Changes for 06/18/96 Complete R. Ireland N/A LAR 1A-235; Typed Steam GenemtorTS Regardmg pages sutmtted by L Requirements of GL 95-05 177 on 9/8/98 and L 193 on 9/30/98 Amendment 219 issued 12/21/98 M98139 BV Use Framatome Process 03/10/97 Complete R. Ireland N/A LAR 1 A-242; withdrawn for Steam GeneratorTank by letter L-98-198 dated Sleeving 10/13/98 M99673 BV Ti Ad 10 YearintervaiISI 09/17/97 Complete F. Lipchick N/A (L-97-024); RAI on Plan with 11 Relief Requests 4/16/98; Reply to RAI(L-98-126) on 6/18/98 SER dated 12/29/98 MA0182 BV Two New and Four 11/24/97 Complete
- F. Lipchick 2/28/99 N/A Telecon 3/11/98; new Revised ISI Relief Requests RRs sutetted on 5/12/98 (L-98-098)
NRC issued 11/12/98
- DLC to submit letter to correct SER MA0611 BV Modify Source Range 12/19/97 Complete R. Ireland N/A Amendment 217 Neutron Flux TS Requirements to Allow Use of Altemate Detectors C:\\winword\\misciajdtaski '
e
.....j, BVPS Unit 1 TAC List (Cont.) _
L(As of 1/11/99)
- i 1
Date DLC NRC Application Required Responsible Action to be '
Prionty
^
Task No.
Task Description Date Action By
. DLC person Completed No.
Comments y
MA1337 BV-1 -ISI Relief Request for 03/25/98 Complete
- F. Lipchick 2/28/99 N/A
(Not on current TAC list) t i
I 0
C:\\winword\\nusc\\ajdtaskt ?
BVPS Unit 2 TAC List (As of 1/11/99)
Date DLC NRC
'I Application Required Responsible Action to be Pnonty Task No.
' Task Description Dale Action By DLC person Completed No.
Comments M83591 BV-2 -IPEEE for Extemal 09/30/97 NRC J. Maracek N/A RAI response forwarded Events (GL 88-20) to NRC by letter (L -
Supplement 4 218) dated 11/12/98 Projected SER date is June 2000.
M93430 BV GL 95-07; Pressure 10/16/95 NRC J. Maracek N/A 180 Day Response Locking and Thermal Binding of provided by letterdated
{
Safety-related Power-operated 2/13/96 Gate Valves M95793 BV-2 -Implementation of GL 95-06/18/96 DLC R. Ireland 1/31/99 N/A LAR 2A-109; sutet 05 Requirements forVoltage-revised dose calculations based SG Tube Repair Criteria to NRC M96778 BV Assurance of Equipment 10/29/96 DLC R. Fedin 1/31/99 N/A RAI response provided in l
Operability and Containment letter L-98-129 dated Integrity, GL 96-06 6/30/98 Letter to correct i.-98-129 i
statement M97016 BV GL 96-05 MOV 11/18/96 NRC J. Maracek N/A Updated response Capability Periodic Verification provided by L-98-072 dated 4/13/98 M98137 BV TS 3.4.5 to Allow Steam 03/10/97 NRC R. Ireland 10 LAR 2A-111 GeneratorTube Sleeving Use RAI response byletter CE Process L-97-023 dated 9/17/97.
May request DLC to revise RAI response.
Engineering would like amendmentin Spring 2000.
Cdwinward\\ misc \\ajdtask2 i l
4 i
(As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Pnonty Task No.
Task Description Date Action By DLC person Completed No.'
Co.T.r w,G j
M98546 BV Degradabon of CRD 04/30/97-NRC-B. Sepelak -
N/A Original response Mech. Nozzles & OtherVessel prevM byletterdated Closure (GL 97-01)'
7/30/97.
Response to RAI due by 11/25/98, will request extension to 1/15/99.
RAI response submitted by letter L-99-001 dated 1/7/99.
M99828 BV Reduce RCS Spec;Tc 10/22/97 DLC R. Ireland 1/31/99 N/A LAR 2A-115; submit Activity Limit from 1.0 to 0.35 revised doss calculations Microcuries Per Gram MA0333 BV 2nd Ten Year ISI Plan 12/09/97 NRC F. Lipchick 8
(L-97-069); RAI on with ten ISI Relief Requests 6/1/98; Reply to RAI on 7/29/98 byletter (L-98-163) i
)
MA0526 BV RAI on Reacter Vessel 07/09/98 NRC R. Ireland N/A Submitted by letter L Integnty (Follow-up to MPA 133 L201G)
MA0746 BV USQ for increased 01/29/98 NRC R. Ireland 2
LAR 2A-120; submitted Control Room Operator additionalinformabon by Radiological Doses letter L-98-195 dated 11/9/98.
BCO 2-98-001 due restart 2R7.
-~~_
C3winword\\ misc \\ajdtask2 '
o
~
(As of 1/11/99)
'l Date DLC NRC Application Required Responsible Action to be Pnonty Task No.
Task Description Date Action By DLC person Completed No.
Comments MA0898 BV Degradation of Steam 03CO/98 NRC R. Ireland NIA Response provWuf by Generatorinternals (GL 97-08) letter L-98-009 j
MA1668 BV Part Length CRDM 04/28/98 NRC R. Fedin N/A Response provided by i
Housing issue letter (L-98-084)
L MA1807 BV Year 2000 Readiness of 08/06/98 DLC J. Maracek 7/1/99 N/A Follow-up response due Computer Systems at Nuclear to NRC by 7/1/99
[
Power Plants (GL 98-01) i MA2325 BV Revise Reactor Trip 07/09/98 NRC Pointer / Berry 3
LAR 2A-81 Setpoint for Operation with BCO 2-98-007 expires Inoperable Main Steam Safety 4/28/99.
Valves MA3840 BV Revise TS to Modify 10/15/98 NRC R. Ireland 6
LAR 2A-116 Reporting Requirements and Typed pages fonwarded Make Administrative Changes by L-98-250 dated 12/14/98. CARF 971578-
[
02 requires amendment
[
by 12/31/99.
MA4377 BV QA Program change:
12/8/98 NRC G. Beatty N/A Submitted by letter L conditional material release 221 dated 12/8/98.
pending documentation receipt 60 day response required by NRC.
i i
l t
C:\\winword\\ misc \\ajdtask2 l k
,]
(As of 1/11/99)
-l Date DLC NRC
[
}
Application Required Responsible Action to be Priority Tcsk No.
Task Description Date Action By DLC person Completed No.
Comments i
MA4439 BV TS 3/4.8.1 "AC Sources" 12/24/98 NRC K. Pointer 9
changes for EDG fuel oil vol.,
BCO 2-98-009 and load rejection, and frequency BCO 2-98-010 expire rqmts.
2-28-2000. BCO 2.
012 expres 3/12/2000.
l MA4441 BV-2 -TS & Bases changes to 12/24/98 NRC R. Ireland S
LAR 2A-135 remove rod pos. deviation.
Operations requests insertion limit, & axial flux diff.
amendmant by 7/21/99.
monitors.
BV QA Program description 12/24/98 NRC G. Beatty N/A Submitted by !etter L '!
change (Limit QS review) 224 dated 12/24/98.
80 day response required by NRC.
(Not on cunent TAC list)
BV Emergency Response 11/27/98 NRC J. Maracek N/A Submitted by letter L l Data Systems (ERDS) 228 J
(Not on cunent TAC list) l MA3838 BV Revise TS Bases to 10/15/98 NRC L Berry 7
Provide Tolerances for RPS -
dated 10/23/98 forward i
Time Constants typed pages NRC to reissue pages l
(Not on current TAClist)
M72265 BV Licensee Performance NRC N/A PM Activity
}
Evaluation t
I C:\\winwont\\misciajdtask2 f f
,l a.
(As of 1/11/99).
I Date DLC NRC Application Required Responsible Action to be Pnonty Task No.
Task Dek,i,, tion Date -
Action By DLC person Completed No.
Comments M72384 BV Headquarters Focal.
NRC N/A PM Actmty Point forInformation &
l Communication i
M72504 BV SALP Report Prepara mn NRC N/A PM Actmty j
a
& ".i ;.9 Attendance 1
MA2515 BV PM Regional Interface NRC N/A PM Actmty l
1 i
MA2623 BV PM Support to NRC N/A PM Actmty EDO/ Commission MA2731 BV PM Event Follow-up NRC N/A PM Actwity
[
r 1
MA2839 BV PM Support for NRC N/A PM Actmty information Systems i
MA2947 t BV PM Visits to Site, Region, NRC N/A PM Actmty i
4 Licensee s
N I
l l
C:\\winwo#misciajdtask2 i
{
I
(As of 1/11/99)
Date DLC NRC Application Required Responsible Action to be Pnonty Tcsk No.
Task Description Date Action By DLC person Completed No.
Comments i
't MA3055 BV PM Effort Expended on NRC N/A PM Actmty FSAR/50.59 Report /Co n niimsd Poll t
MA3163 BV PM Budgeting Actmbes NRC N/A PM Actmty MA4018 BV Potenbal for Degradabon NRC N/A PM Actmty of ECCS/ CSS after LOCA i
GL-98-04 i
M94646 BV Testing of Safety Related 04/04/96 Complete J. Maracek N/A-Response prowded by Logic Circuits (GL 96-01) letter L-98-191 dated 10/13/98 M98140 BV Use Framatome Process 03/10/97 Complete R. Ireland N/A LAR 2A-113 withdrawn for Steam GeneratorTube by letter L-98-198 l
Sleeving 10/13/98
[
l MA0183 BV Two New and Four 11/24/97 Complete
- F. Upchick 2/28/99 N/A Telecon 3/11/98; new j
Revised ISI Relief Requests RRs submitted on 5/12/98 (L-98-098)
Issued 11/12/98
- DLC to submit letter to I
correct SER l
L s
C3winword\\ misc \\njdtask2 l
.~ g F
- 3 (As of 1/11/99).
'l 0
Date DLC NRC i
Application Required Responsible Action to be Priority f
Task No.
Task Description Date Action By DLC person Completed No.
Comments MA0612 BV Modify Source Range 12/19/97 Complete R. Ireland N/A Amendment 94 Neutron Flux TS Requiremeits to Allow Use of Attemate Detectors MA1347 -
BV Ampacity Derating of 10/13/97 Complete J. Maracek -
N/A (GL 92-08) SER received Conduits Wrapped with Thermo-10/1/98 Lag 330-1 MA2200 BV Review 10 CFR 50.59 06/18/98 Complete L Beny N/A Forwarded to NRC by Annual Report for Period of letter L-98-122 11/1/96 - 10/31/97 t
i C:\\winworthmisc\\ajdtask2 j m.-
m m-. -