Letter Sequence Meeting |
---|
|
|
MONTHYEARML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl Project stage: Meeting ML20205Q1051986-05-23023 May 1986 Forwards Vols 1-1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Representative Sample of Equipment Will Be Installed & Available for Insp in Support of NRC Audit Project stage: Other ML20206E6191986-06-16016 June 1986 Notification of 860701 Meeting W/Util in Bethesda,Md to Discuss Technical Issues Re Util 860523 Equipment Qualification Rept,Identified as SER Confirmatory Issue 14, in Preparation for NRC Audit Project stage: Meeting ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 Project stage: Meeting ML20205C3281986-08-0404 August 1986 Forwards Addendum 1 to 2BVM-166, Sqrt & Pump & Valve Operability Review Team (Pvort) Audit Program & Updated Master Equipment List,Per Sqrt/Pvort 860723 Premeeting.List Submitted to Support NRC 860930 Audit Project stage: Meeting ML20210F6021986-09-20020 September 1986 Forwards Rev 1 to Vols 1,1A,1B & 1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Review & Schedule of NRC Audit Requested.List of Specs & Status of Util Response Also Encl Project stage: Other ML20215N2011986-10-23023 October 1986 Discusses Results of 860701 Meeting W/Util & Contractor in Preparation for Equipment Qualification Onsite Review.Onsite Review Scheduled for 861117-21.Access for Review Team Members Requested Project stage: Meeting ML20214E5881986-11-19019 November 1986 Notification of 861120 Meeting W/Util in Shippingport,Pa to Discuss Applicant Personnel Findings Made During Equipment Qualification Site Audit Project stage: Meeting ML20214V9041986-12-0303 December 1986 Forwards Updated Environ Qualification Program for Safety- Related Mechanical Equipment in Response to FSAR Questions 270.2 & 270.3 Identified in FSAR Amend 4.Qualification Methodology & Results Discussed Project stage: Other ML20207D4731986-12-19019 December 1986 Forwards Supplemental Info Re Evaluation of Superheated Steam Blowdown on Environ Qualification of Facility Equipment,Per 861125 Telcon.Response Provides Addl Info on Computer Codes Utilized in Superheat Evaluation Project stage: Supplement ML20212J5431987-03-0404 March 1987 Forwards Response to Specific & Generic Comments from Nrc/ NRR Environ Qualification Audit on 861118-20.Info Indicates That Action to Address Specific Comments Completed & Action to Address Generic Comments Prior to Fuel Load Underway Project stage: Other ML20207R0571987-03-0505 March 1987 Forwards Comments for Resolution Re SER Confirmatory Issue 14 Identified During Equipment Qaulification Review Team 861118-20 Audit.Response Requested within 45 Days of Ltr Receipt Project stage: Other ML20205G3791987-03-24024 March 1987 Forwards Responses to NRC Requests for Info Re Environ Qualification Program,Including High Energy Line Break W/ Superheat & Qualification Methodology for Submergence Project stage: Other ML20205F9351987-03-26026 March 1987 Forwards Environ Qualification of Safety-Related Mechanical Equipment, Including Rev 1 to Books 1-3 Re Masonelian air-operated Valves,Rev 4 Re Xomox Plug Valves & Rev 5 Re Pacific Charging Pumps,Per P Tam 870317 Telecopy Project stage: Other ML20214J6701987-05-18018 May 1987 Notifies of Completion of Environ Qualification (EQ) Effort for Facility EQ Packages in Compliance w/10CFR50.49. Potential 10CFR50.55(e) Items Re Improper Sealing of EQ Program Equipment Will Be Submitted within 30 Days Project stage: Other ML20214J4911987-05-25025 May 1987 Interim Significant Deficiency Repts 87-16 & 87-17 Re Conduit Sealing of 50 Class 1E Items.All Physical Work Re Re Environ Qualification Program Complete W/Exception of Four Bisco Seals Project stage: Other 1986-07-28
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl 1999-06-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl ML20132C7381985-02-21021 February 1985 Summary of 841210-14 Site Visit 5 to Observe INPO Accreditation Team Evaluation of Adequacy of INPO Accreditation Process in Meeting Intent of Policy Statement on Training & Qualifications for Power Plants 1999-06-16
[Table view] |
Text
-
m y 0 6 mon Docket No.: 50-412 APPLICANT: Duquesne Light Company FACILITY: Beaver Valley Power Station, Unit 2 (BVPS-2)
SUBJECT:
BVPS-2 EQUIPMENT QUALIFICATION PROGRAM A meeting was held with Duquesne Light Company (DLC) on Monday, December 19, 1983 at NRC Headquarters in Bethesda, Maryland. DLC was accompanied by representatives of Stone and Webster Engineering Corporation. The NRC was represented by the Division of Licensing and the Division of Engineering. A list of attendees is included as Enclosure 1.
The purpose of the meeting was the discuss DLC's Equipment Qualifications Program. The technical reviews associated with the environmental qualifications of both the electrical and mechanical equipment were discussed. DLC presented their position on Regulatory Guide 1.89,
" Qualification of Class 1E Equipment for Nuclear Power Plants." The position, dated September 22, 1983, states that Class 1E equipment presently delivered or on order will meet or exceed the intent of IEEE 323, 1971 and Category II of NUREG-0588, Rev. 1. When determined possible by DLC, the qualification of this equipment will be upgraded to meet the standards set forth in Category I of NUREG-0588, Rev. 1. Replacement safety related electrical equipment will meet the standards set forth in 10 CFR 50.49 unless there are sound reasons to the contrary as outlined in proposed Rev. I to Regulatory Guide 1.89, dated May 1983.
DLC is scheduled to have 85% of their electrical equipment environmentally qualified and installed in the March-June 1985 time frame.
The handouts presented at the meeting are attached as Enclosure 2.
Lisamarie Lazo, Pro,iect Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated DISTRIBUTION Docket File LB#3 Readino '
Llazo B507090417 850606 GWKnighton PDR ADOCK 05000412 A PDR DL:L 4 DL #3 Llazo f GW/:nlghton 05/25/85 05 j/85
r ga aggg
, [g I$g UNITED STATES NUCLEAR REGULATORY COMMISSION 5 ?j WASHINGTON, D. C. 20555
'% . . . . + /
M P 6 $85 Docket No.: 50-412 APPLICANT: Duquesne Light Company FACILITY: Peaver Valley Power Station, Uni 2 (BVPS-2)
SUBJECT:
BVPS-2 EQUIPMENT OUALIFICATION PROGRAM A meetina was held with Duauesne Light Company (DLC) on Monday, necember 19, 1983 at NRC Headquarters in Bethesda, Maryland. DLC was accompanied by representatives of Stone and Webster Engineering Corporation. The NRC was represented by the Division of Licensing and the Division of Engineering. A list of attendees is included as Enclosure 1.
The purpose of the meeting was the discuss DLC's Equipment Oualifications Program. The technical reviews associated with the environmental qualifications of both the electrical and mechanical equipment were discussed. DLC presented their position on Regulatory Guide 1.89 "0ualification of Class 1E Equipment for Nuclear Power Plants." The position, dated September 22, 1983, states that Class 1E equipmant presently delivered or on order will meet or exceed the intent of IEEE 323, 1971 and Category II of NUREG-0588, Rev. 1. When determined possible by DLC, the qualification of this equipment will be upgraded to meet the standards set fcrth in Category I of NUREG-0588, Rev. 1. Replacement safety related electrical equipment will meet the standards set forth in 10 CFR 50.49 unless there are sound reasons to the contrary as outlined in proposed Rev. I to Regulatory Guide 1.89, dated May 1983.
DLC is scheduled to have 85% of their electrical equipment environmentally oualified and installed in the March-June 198E time frame.
The handouts presented at the meeting are attached as Enclosure 2.
M)fAllG L sa arie Lazo, Project anager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated
Beaver Valley Mr. John J. Carey Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 110 PA Route 60 Pittsburgh, Pennsylvania 15205 Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Enginee-ing Jay E. Silberg, Esq. Beaver Valley Two Project Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Robinson Plaza Building No. 2, Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15EC5 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquense Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 s
Mr. John J. Carey Vice President, Nuclear Duquense Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Pittsburgh, Pennsylvania 15205 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NRC John A. Lee, Esq.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229
Mr. E. F. ~ Kurtz.- Jr. , Manager Regulatory Affairs Beaver Valley Two Project Duquense Light Company Robinson Plaza Buidling No. 2 Suite #210-
.PA Route 60 Pittsburgh, Pennsylvania 15205 I
L t
i I
l
~
i.
l' l~
f.
k-
l l
ENCLOSURE 1 E0 Meeting December 19, 1983 ATTENDEES
-NPC
-L. Lazo R. LaGrange
-D. Reiff APPLICANT.
E..Eilmann, DLC C.- Hill, DLC W. Rutherford, DLC
-K. Woessner, OLC J. Hutlz, DLC-N. Sacco, SWEC K. Rendiksen, SWEC t
i
ENCLOSURE 2 t
DUQUENSE LIGHT COMPANY MEETING WITH NRC ON EQUIPMENT QUALIFICATION ISSUES BETHESDA, MD DECEMBER 19, 1983 9:30 A.M.
AGENDA I) Introduction and Scope of Meeting
- 2) Organization
- 3) Seismic Qualification
- 4) Environmental Qualification of Electrical Equipment
- 5) Environmental Qualification of Mechanical Equipment
- 6) Closing Remarks
-~
NUCLEAR CONSTRUCTION DIVISION PERSONNEL INVOLVED IN ENVIROMLNTAL QUALIFICATION i
j VICE PRESIDENT
! E.J. WOOLEVER I PROJECT ' DEPUTY PROJ.
MANAGER _ MANAGER R.J. Washabaugh J.A. Huitz
' I' I i STONE MANAGER MANAGER MANAGER MANAGER
& REGULATORY ENGINEERING CONSTRUCTION OUALITY
^ ^
J l WEBSTER E.F. Kurtz H.M. Seigel R.J. Swiderski C.E. Ewing i i i i I I I l g LEAD ENGINEER CONSULTING SENIOR PROJ. ENGINEERING -
- LICSENSING PROJECT ENGINEER &
g SUPPORT ENGINEER STRUCTURAL CONSTRUCTION SERVICES ELECTRICAL SUPPORT DIVISION SYSTEM SYSTEMS PROJECT ENGINEER
- g E.T. Eilman Bill Rutherford Pete Cadena Bill Laughlin l ,
l l~ l I I SR. ENGINEER PROJECT IN I ENVIRONMENTAL p i 3 OUALIFICATION SYSTEMS l t
]
C.L Hill - l Sanlib Mukherjee WESTINGHOUSE ENGINEER ENVIRONMENTAL i OUALIFICATION I
K.E. Woessner i
9 N
O I
. T C
N U
F M
E T N S O Y I S T A W D C E N I I S A F V W I E E N T R I O N V I E M E T D A R A I R C G L I T O A F N R C I E P I T M N N N .
H E O O.
C D R E I I E T V T N N E E
M C P
I .
U B .
Q E
O.
E A
/- . ..
-:m A. E.O. EQUIPMENT IDENTIFICATION AND SYSTEM FUNCTION
- 1. SYSTEM DESIGN FUNCTION
- 2. PERFORMED BY SYSTEM ENGINEERS OF VARIOUS DISCIPLINES
- 3. EOUIPMENT TRACKED BY THE PRO.TECT EQUIPMENT, SYSTEM (PES) 4 ., FUNCTIONS TRACKED BY THE ESSENTIAL SYSTEMS, COMPONENTS, AND. INSTRUMENTATION REQUIRED FOR SAFETY FUNCTIONS (2BVM-ll4) e D
l
'i, B. ENVIRONMENT IDENTIFICATION - LOCATION ORIENTED
- 1. NON-SEISMIC a) PERFORMED BY NUCLEAR TECHIJOLOGY AND POWER DIVISIONS b) TRACKED BY ENVIRONMENTAL CONDITIONS FOR E.D. REQUIREMENTS (2BVM-119)
- 2. SEISMIC a) PERFORMED BY ENGINEERING MECHANICS DIVISION b) TRACKED BY SEISMIC DATA S!!EET 9
4
i
. .. .l.
C. E.O. PROGRAM REVIEW FOR CLASS lE EQUIPMENT E.O. PROGRAM EVALUATION E.O. COORDINATOR 1 r ir 1 r 1r 1r PLANT SPECIFIC GENERIC EQUIPMENT SEISMIC CLIENT NUREG-0588 TEAM NSS/ BOP SYSTEM EVALUATION EVALUATION EVALUATION EVALUATION EVALUATION DISCIPLINE DISCIPLINE EMD DLC DLC/
E.O. DOCUMENT SPECIALIST MECilANICAL WNES/
, REVIEWER r r GROUP ,
SWEC if COMMENT .
RESOLUTION E.O. COORDINATOR
'I
>DLC 1r VENDOR O
)
7 L R A O C T .
I A I R N T I C D
. E R L O E O C
R O
T P R A U E N O
I W I _
D R T
- O G N R P R E O O N M T O O P A C L I I N A T U 2 I C ARQ - D C I NOE S R I N IF P O M A D E V O S H R l B C IDC O EME O S . SEM C S O.
. L E C S O O. L T E O A R N T I L .
N D O R E C O N O N C O S
R E
P .
N O
I S
R A I
T C S I I R _
N T I C M E D L A E
w PAGE 41 PIPOpi PC. SVZ-Sti PROJECT Efv!PttENT SYSTEM REPORT DATE 12/9e/83 SEISitIC Are DYttestIC SUAt IFICATION Are STATUS REPORT JCS flAf tE BVPS-t#41T 2 ftASTER LIST OF SAf ETY RELATED EQUIPMENT BY SYSTEH. SUPPLIIR, SPEC. EQUIPHENT IS EffGINE ER STONE & NEOSTER UTILITY DUQUESHE LIGHT CO.
HSSS SUPPLIER 2 NESTINGHOUSE 00Ct'ET to. 50-412 I- -
-- foutPetENT 1 --- LOCAT Inn ---I -- --tomoS ------l-- QUAL HETH --l---NAT FREQS --lSTATUSI DESCRIPTION BLDG ELEV IITG SEIS OTHER 199UT APE.YS FREQ D F/S S/S VERT EQUIrttENT 10 01AtAJFACTURER QUAL REPORT DYN. RE4'O I SPEC QTT R HDDEL e...eeeeeeeeeeeeeeeeeeessessesseeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeemseeeeeeeeeeeeeeeeeeeeeeeeeeeeees 2CHSolOV111 DEGAS TO VOL CONT TM ISO AS 99712 . . . . . . . . .
ListITORQUE MS REF-Ste-000-2 0424 CODES- '.
2CHSeeCV100A CHS HOTOR OPERATED WALVE AS 9748 . . . . . . . .
Lill! TORQUE MS REF-Ste-Set 991 CODES-2CHS.810V1006 CHS 91010R OPERATED VALVE AS 9740 . . . . . . . .
LIttITORQUE MS REF-Ste-See 091 CODES-2 CMS.TRS-P21C ttAM TRANSFER SM FOR 2CHSeP21C SS 99730. . . . . . .
I-T-E IIFERIAL CORP MS REF-HPLC 394 3 CODES-2 CMS-FL121 SORIC ACID FILTER AS 90725. . . . . . . .
CARSORUNDUM CO ##S REF-WA 525 1 CODES-2CHS-FLT22 REACTOR COOLANT FILTER AS 90723. . . . . . . . . .
CAR 90RufeUH CO WRS REF-N/A 525 1 CODES-2CHS-FLT23 SEAL MATER FILTER AS 99722. . . . . . . . . .
Calt90lMROUM CO M S REF-WA 525 1 CteES-2CHS-F L T 24 A SEALHTR IMJECTION FILTER AS 90723. . . . . . . . . .
CARBORUMOUH CO M S REF.
WA 525 1 CODES-2CHS-FLT246 SEAL MTR INJECTION FILTER AS 99723. . . . . .
CAR 80RuteUH CO WRS REF-WA 525 1 CODES-2CHS.FEIZ3A DORIC ACID EFER P W DISCH AS 9717 . . . . . . . .
MS REF-402 CODES-
=
DUQUESNE _ GHT COM?ANY BEAVER VALLEY POWER STATION UNIT NO. 2
~
REGULATORY GUIDE POSITION DATE 11/74 REGULATORY GUIDE NO.
1 89 REV. o TITLE: QUALIFICAHON OF CLASS IE EQUIPMENT FOR NUCLEAR POWER PLANTS 4
REV. D ATE 9-22-83 EVPS UNIT 2 POSITION Because of the NRC Commissioners' memorandum and order (CLI-80-21)u This rulingBVPS-2 super- must m the requirement s of NUREG-0588, Rev.1, for a Category II plant. The present BVPS-2 sedes the requirements of Regulatory Guide 1.89, November 1974.
position on qualification of Class IE equipment is as follows :
Class IE equipment presently delivered or on order will meet or exceed the
~ intent of IEEE 323, 1971 and Category II of NUREG-0588, Rev.1. Wen determined possible by Duquesne Light Company, the qualification of this equipment will be upgraded to meet the starziards set forth in Category I of NUREG-0588, Rev.1. Replacement safety related electrical equipment will meet the standards set forth in 10CTR50.49 unless there are sound reasons to the contrary as outlined in propo_ sed hvin4aa 1 to Regulatory _
Guide 1.89, dated May 1983.
A P PR OV ALS e .o pW O f~ 4/fd 7/2ol4 5 W MANAGER $ /J '? - /3 - 83 D C E P A A E?i / O A T E
%: A. C ,ldrs dNC mV'%%ENGSi ik' EE AING
~.'4C:7 VA p A G @ C/ 9 EG. A F.: A e A S. O A TE
.E A C .. CENSING dNG A./ O A 7 E
/dId WW6 0 chi /n J nuC.2. n m .cu, cars <
e STONE & WEBSTER EQUIPMENT QUALIFICATION PROCEDURES FOR BVPS#2 l
o 2BVM-114 ESSENTIAL SYSTEMS, COMPONENTS, AND INSTRUMENTATION REQUIRED FOR SAFETY
' FUNCTIONS.
o 2BVM-119 ENVIRONMENTAL CONDITIONS FOR EQUIPMENT QUALIFICATION REQUIREMENTS.
o 2BVM-128 ENVIRONMENTAL QUALIFICATION PROGRAM FOR CLASS 1E ELECTRICAL EQUIPMENT.
o 2BVM-135 ENVIRONMENTAL QUALIFICATION CONDITIONAL RELEASE PROGRAM FOR CLASS 1E EQUIPMENT.
4 i .
l
i DLC EQUIPMENT l
QUALIFICATION PROCEDURES l
0 NCDP 3.7 EQUIPMENT QUALIFICATION PROGRAM O NCDP 3.7.1 BVPS-2 EQUIPMENT QUALIFICATION CONDITIONAL RELEASE PROGRAM o NCDP 2.7.3 EQUIPMENT QUALIFICATION REVIEW
. SCHEDULE FOR ENVIRONMENTAL QUALIFICATION ACTIVITIES o SEPARATE SUBMITTAL
- 1. INITIAL - 2ND QUARTER OF 1984
- 2. UPDATE - 1ST QUARTER OF 1985 o 85% COMPLETELY QUALIFIED AND INSTALLED MARCH - JUNE 1985 l
l l
r l
l .,
MECHANICAL EQUIPMENT QUALIFICATION PROGRAM
- 1. Identification of the safety-related mechanical equipment loca t ed in harsh environment areas.
- 2. Identification of the non-metallic subcomponents of such equipment.
- 3. Identification of the postulated' environments for this equipment.
4 Identification of the non-metallic material capabilities.
- 5. Evaluation of the environmental ef fects on these materials.
t
- 1. A master list of all equipment included in this program.
- 2. A su m ry report for each piece of equipment indicating:
- a. List of non-estallies
- b. pos tulated parameters for the nomtallies
- c. qualification status for the equipment
- 3. Procedures ut ili zed in ac c ompli s hing the qua li fic a t io n of the equipment.
4 Amendments to the FSAR as required by the NRC staf f.
O 9
F MEETING
SUMMARY
DISTRIBUTION
Docket No(s): 50-412 NRC PDR Local POR NSIC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager Llazo JLee NRC PARTICIPANTS L. Lazo R. LaGrange D. Reiff bec: Applicant & Service List