MAY Z 0 BBS Docket No. 50-412 APPLICANT: Duquesne Light Company (DLC)
FACILITY:
Beaver Valley Power Station-Unit 2 (BVPS-2)
SUBJECT:
SUMMARY
OF MECHANICAL ENGINEERING MEETING A meeting was held on October 2,1984 in Bethesda, Maryland with representatives of the applicant, Westinghouse and Stone and Webster. A list of meeting attendees is provided as Enclosure 1.
The purpose of the meeting was to discuss the overall status of the mechanical engineering open items, as previously discussed at the April 3-5, 1984 audit, and for the applicant to address the staff's concerns which were identified at the July 26, 1984 ASME Code Baseline Document Meeting. The meeting agenda is presented in Enclosure 2.
A total of eleven questions were discussed. By the conclusion of the discussions, three questions remained open, three were confirmatory and five were closed.
However, three of these five were closed pending minor applicant action as discussed at the meeting. The results are presented in Enclosure 3, and were confirmed by the applicant in a letter dated October 24, 1984.
/S Marilyn Ley, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc: See next page D
BJ3 y/es/
G pghton.
/y/85.
5
/85
~
8506O60434 850520
{DR ADOCK O g 4y 2
Beaver Valley Mr.' John J. Carey Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 110 PA Route 60 Pittsburgh, Pennsylvania 15205 Gerald.Charnoff, Esq.
Mr. R. E. Martin, Manager Engineering Jay E. Silberg,.Esq.
Beaver Valley Two Project Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W.
Robinson Plaza Building No. 2, Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205.
Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant. Counsel Quality Assurance Department Governor Energy Council
.Duquense Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. John J. Carey
-Vice President, Nuclear Duquense Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Pittsburgh, Pennsylvania 15205 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J.-Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. 0. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg,-Pennsylvania 17120 Mr. P. RaySircar
-Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor
-P. O. Box 2325 Duquesne Light. Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NRC John A. Lee, Esq.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin.
Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I
'631 Park' Avenue King of Prussia, Pennsylvania 15229
, Mr. E. F. Kurtz, Jr., Manager
~
Regulatory Affairs Beaver Valley Two Project Duquense Light Company Robinson Plaza Buidling No. 2 Suite.#210-PA Route 60..
Pittsburgh, Pennsylvania 15205
BEAVER VALLEY UNIT 2 MECHANICAL ENGINEERING MEETING October 2, 1984 Bethesda, Maryland Name Organization ata 9 y
NRe} oQ LB3 d
f4 gf _n swec M +..~ / 5 M 3"sr.
y 7
T- ~
- 1., 5 x ri, sec Shws k.
Mueung C
M L 13emnu da/2r/na RJ. BoswHr uncps/nsa k Terao uxc/.ef//7st3 Ce o aye E ait suec A, t.
Van Snks/
J#8 J. J M ' /n e r ney
//. 6 G us/z m 0
R F Btaxe 5 "l E C sw er c-g p g,e im.o u' l
bLc R. 6. cv,:n p,
F C.
Lia DLC l
X #.4o49MGER S VEC D rwsceau/
s us ec.
i h
sw c
-v: &'s A WlL'INE..
s AGENDA MEB MEETING October 2, 1984 9:00 am Westinghouse Office, Bethesda, Maryland
-1.
Component Support Design A.
Primary Coolant Loop Component Supports (Question 210.43) 8.
Class 1, 2 and 3 Supports (Question 210.34(42*))
C.
Primary /SecondaryStresses(Question 210.39) 2.
Pipe Break Design Criteria A.
Primary Coolant Loops (Question 210.42)
B.
Arbitrary Intermediate Break Locations in High Energy Seismic Cate-gory I Piping 3.
RCS Isolation Yalves (Question 210.40) 4.
Design of HVAC Ductwork and Supports (Question 210.31(40*))
5.
Status of Other Questions / Responses A.
Pipe-Pipe Impact (Questions 210.10(28*) Closed?)
B.
Jet Impingement (Question 210.12(26*) Confirmatory?)
C.
Seismic Analysis of Piping between Structures (Question 210.28 Closed?)
D.
Functional Capability of Piping (Question 210.32(39*) Closed?)
E.
Snubber Testing (Question 210.37 Closed?)
- Draft SER Open Item Number
r Question No.-
Status Comments 210.10 closed No further DLC action 210.12 confirmatory DLC to submit jet impingement information (July,1985).
210.28 closed No further DLC action
' 210.31 open DLC to revise 7/2/84 response to include HVAC ductwork design information.
-210.32 confirmatory If exemption of analysis of branch lines for primary coolant loop breaks
-is granted, this question will be closed. Otherwise, DLC will report associated branch line stresses for LOCA effects.
210.34 confirmatory DLC to demonstrate that pipe and equipment supports are inherently designed for the effects of SSE anchor motion by the conservative design for i SSE anchor motion.
DLC will' revise Table 3.98-15.
210.37 closed No further DLC action 210.39 closed Pending formal submittal of the draft response discussed 210.40 open DLC to revise draft response to include a list of isolation valves and descriptions of leak testing procedures and acceptance criteria.
210.42 open DLC encouraged to clarify the GDC-4 exemption request. Specify exemption of-the analysis of branch lines for the effects of primary coolant loop breaks.
210.43 closed DLC to revise response in Amend-ment 7 to address welding pro-cedures. Revise Table 5.4 - 21 by noting that all stresses are within the yield stress when SSE and LOCA are combined by SRSS.
l i
.e
.e-m..
m._
y..y
,,,_,,.w...,.
,,_..-.y
,_,,_r-,....,,,.s
,,o,,,. -... _
...m_-..-.,.
'4 MEETING
SUMMARY
DISTRIBUTION
,DeiketN(ih?io-412 NRC PDR Local PDR NSIC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager MLey 5
JLee NRC PARTICIPANTS M. Ley H.' L. Brammer-R. J. Bosnak D. Terao
.: r bec: Applicant & Service List
.