Letter Sequence Other |
---|
|
|
MONTHYEARML20213G1731987-04-30030 April 1987 Advises That Encl Notice of Consideration of Issuance of Amend to License DPR-66 & Proposed NSHC Determination Re 861009,870203 & 0416 Applications to Remove Partition Separating Control Rooms Forwarded for Fr Publication Project stage: Other ML20210C3141987-04-30030 April 1987 Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required Project stage: RAI ML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review Project stage: Other ML20214A7591987-05-12012 May 1987 Forwards Request for Addl Info Re 870402 Tech Spec Amend Request 126,Rev 2 in Order to Complete Review Project stage: RAI ML20206A7351988-11-0808 November 1988 Advises That Util 880722 Submittal of 1987 Rept of Facility Changes,Tests & Experiments Meet Criteria in 10CFR50.59 & Acceptable.Comments Listed Project stage: Other 1987-05-12
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl 1999-06-16
[Table view] Category:TRIP REPORTS
MONTHYEARML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review ML20132C1311984-05-10010 May 1984 Trip Rept of 840430-0501 Site Visit Re Status of Open & Confirmatory Items 1987-05-08
[Table view] |
Text
p uy] y/>
~
B&O MEMORANDUM T0: John Stolz, Director Project Directorate 14
' Division of Reactor Projects i FROM: Roger Pedersen, Project Engineer Project Directorate 14 Division of Reactor Projects
SUBJECT:
TP.IP REPORT - BEAVER VALLEY CONTROL ROOM HABITABILITY
, REVIEW (TAC #63I84)
On April 30 and May 1, 1987, I visited the Beaver Valley site with Fred 1 Burrows and Jim Knight to inspect the licensee's documentation and drawings of the Beaver Valley (BV) Units 1 and 2 Control Room Habitability Systems. This inspection was needed to support our review of the proposed Technical Speci- i fications (TS) regarding the combined BVl&2 control room. The visit was successful, in that the technical reviewer (Fred Burrows) believes that he
..? has everything he needs at this time to complete his safety evaluation.-
g Attachment 1 is a list of system flow and electrical wiring diagrams that we i received from the licensee during the visit.
During the site visit several questions came up regarding Fred's concerns that g we transmitted in our April 30, 1987 reauest for additional information. The 5 ' licensee committed to respond to our concerns the week of May 4,1987.
Currently the licensee intends to provide revised TS pages that clarify the applicability of several LCOs and Action Statements in the proposed TS.
Specifically movement of loads over irradiated fuel will be addressed in each TS dealing with movement of irradiated fuel. The licensee will also address L how the " bypass and inoperable" status of shared systems / equipment will be communicated to the control room operators. Additionally, their response will clarify the definition of operability of the habitability systems to ensure a that functional testing of each chlorine and radiation instrumentation channel
{ (from the detector through the slave relay) is required.
I If you have any questions regarding this tHp report, I would be glad to L discuss' them at your convenience.
/s/
Roger Pedersen, Project Engineer
, Project Directorate I-4 0 Division of Reactor Projects I/II cc: Fred Burrows DISTRIBUTION Jim Knight (Docket,0r_ Central: File' j Joe Joyce NRC A Local PDRs Peter Tam PDI-4 Readir.g J. Stolz AcKSd
?. %i Gifordned OErc WPg&Q e.ma LAPDI- PDI- PDI-4 F -j RPed rsenP. Tam; JS 7/8 5/ 7/87 5/7/84 5/] / ,
^)
l l
Attachment 1 l BV-2 DWG Index L
Drawings received by F. Burrows (NRC) on April 30, 1987 and May 1, 1987:
- 1. 2001 409 001 024G
'2. E-3E
- 3. E-3H
(.
- 4. E-3K
[
- 5. E-3N
- 6. E-4T
, 7. E-6JD
( 8. E-6JE j 9. E-6JF
- 10. E-64Q Shl.2.3
- 11. E-64X
- 12. E-11CL
- 13. E-11CN i 14. E-11GB Shl 3
- 15. E-11GF Sh2
} 16. E-11GG Sh2 i -17. E-11GN Sh4
- 18. E-11GJ Sh1
! 19.. E-11GK Shi L 20. E-11JP Sh1
-21. E-11JP Sh2
! 22. E-11LK b 23. E-11LL
24 E-11GP Sh2
.