Letter Sequence Meeting |
---|
|
|
MONTHYEARML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl Project stage: Meeting ML20137R0401985-11-22022 November 1985 Requests Rev to FSER to Eliminate Inconsistency in Representing Steam Generator High Level Trip Sys as Part of Emergency Safety Features Actuation Sys & Mistaken Representation as Part of Protection Sys Project stage: Other IR 05000917/20100221985-11-22022 November 1985 Notice of Violation from Insp on 850917-1022 Project stage: Request ML20136H0901986-01-0303 January 1986 Forwards Proprietary & Nonproprietary Comparison of Data for Beaver Valley Power Station,Unit 2 W/WCAP-9736/9735 Data. Repts Suppl Info in WCAP-9735 & 9736 Re Multiflex 3.0 Methodology.Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Request ML20137Z7601986-03-10010 March 1986 Provides Addl Info Re Backfit Issue 4, Steam Generator Level Control & Protection, Per SER (NUREG-1057).Addl Info & 850509 Transcript of Backfit Appeal Meeting Provide Justification for Closure of Issue Project stage: Meeting ML20155E9881986-04-11011 April 1986 Forwards Rev to Attachment I of Re GDC 51, Including Feedwater Lowest Svc Metal Temp Change,Feedwater Check Valve Cover Matl Change & Replacement Feedwater Check Valve Matl Info Project stage: Request ML20206Q8361986-06-30030 June 1986 Forwards Request for Addl Info Re SER Backfit Issue 4, Steam Generator Level Control & Protection, Based on Review of 851220 Response to NRC 851122 Request to Eliminate Inconsistency Re Main Feedwater Isolation Project stage: RAI ML20204J7471986-07-16016 July 1986 Responds to NRC Re Violations Noted in Insp Repts 50-366/86-08 & 50-321/86-08.Corrective Actions:Personnel Counseled on Importance of Generating Deficiency Repts When Applicable Per Mgt Bulletin MM-MGR-002-0386 Project stage: Other ML20212P3921986-08-31031 August 1986 Safety Evaluation Report Related to the Operation of Beaver Valley Power Station,Unit 2.Docket No. 50-412.(Duquesne Light Company,Et Al) Project stage: Approval 1986-03-10
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20215M2051987-05-0808 May 1987 Trip Rept of 870430 & 0501 Site Visits Re Control Room Habitability Review ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl 1999-06-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206K2201999-04-19019 April 1999 Summary of 990311 Meeting with Util Re Action Plan for Correcting Design Deficiencies of Various Small Bore Piping Supports ML20203A9151999-02-0404 February 1999 Summary of 990119 Meeting with Util Re Current & Anticipated Licensing Issues for Plant,Units 1 & 2.List of Meeting Attendees & Handout Matl Encl ML20210T1921997-08-26026 August 1997 Summary of 970805 Meeting W/Duquesne Light Co in Rockville, MD to Discuss Info Re Pressurized Thermal Shock Evaluation ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20059H0351993-10-28028 October 1993 Summary of Operating Reactors Meeting 93-40 on 931020 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20154P2601988-09-20020 September 1988 Summary of 880907 Meeting W/Util Re Thermal Stratification in Pressurizer Surge Line.Attendance List & Collection of Slides Used in Presentation Encl ML20196D3841988-02-10010 February 1988 Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl ML20237B6901987-12-0404 December 1987 Summary of 871122 Site Meeting W/Util Re Technical Issues Concerning Scram Experience & Efforts to Reduce Frequency of Future Scrams.Related Info Encl ML20236U6391987-11-25025 November 1987 Summary of Operating Reactors Events Meeting 87-041 on 871124.List of Attendees,Summary of Reactor Scrams & Comparison of Wk Statistics W/Industry Averages Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl ML20210T5651987-02-11011 February 1987 Summary of 870116 Meeting W/Util Re Issues That Remained Open as Result of Review of Whipjet Final Rept . Suggests Applicant Submit Formal Request for Exemption from GDC 4 for Piping Addressed in Rept.Related Info Encl ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl ML20212F3931987-01-0707 January 1987 Summary of 861209-11 Site Meeting W/Applicant & Consultants Re Tech Spec Review,Proposed Requirements Described in SER & Ssers & Differences Between Draft Tech Specs & Current Regulatory Requirements ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20210J5601986-09-22022 September 1986 Summary of 860827 Fifth Progress Rept Meeting W/Util, Westinghouse,Rl Cloud Assoc,S&W,Novetech,Etec,Epri & Bechtel Re Whipjet Program.Agenda & List of Attendees Encl ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively ML20205S5961986-05-29029 May 1986 Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl ML20203C2071986-04-16016 April 1986 Summary of Third Progress Rept 860410 Meeting W/Epri,S&W, Novetech Corp & Rl Cloud Assoc to Discuss Progress in Whipjet Program Re Use of leak-before-break Assumption on balance-of-plant Piping ML20199J6361986-03-31031 March 1986 Summary of 860312 Meeting W/Util Re Second Progress Report Meeting on Whipjet Program.Viewgraphs,Attendee List,Agenda & Summary of Questions Raised by NRC Encl ML20199E3861986-03-18018 March 1986 Summary of 860304 Meeting W/Util,Novetech Corp,Rl Cloud Assoc,Epri & S&W Re Progress on Whipjet Program.Attendee List Encl ML20154M5701986-03-10010 March 1986 Summary of 860228 Meeting W/Util Re Engineering Assurance Program & Independent Design Verification.Engineering Assurance Program Will Be Performed W/Nrc Participation to Assure Plant Built Per Util Commitments.W/O Encl Audits ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20137N3291986-01-24024 January 1986 Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987 ML20154H8601986-01-0707 January 1986 Summary of ACRS Subcommittee on Beaver Valley Unit 2 851101 Meeting in Washington,Dc Re Const Status & Plant Startup Schedule.Attendance List & Draft Agenda Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20126M1521985-07-0808 July 1985 Summary of 850619-20 Meetings W/Util & S&W in Boston,Ma Re Confirmatory Issue on soil-structure Interaction (SSI) & Auditing SSI-related Calculations.Response Spectra Plots Requested from Applicant.Meeting Handouts Encl ML20128G8711985-06-25025 June 1985 Summary of 850509 Meeting W/Util in Bethesda,Md to Hear Appeal on Steam Generator Channel Level Requirements.Meeting Notice & Transcript,W/Attendance Roster,Encl ML20129F2571985-06-0606 June 1985 Summary of 841120 Meeting W/Util in Bethesda,Md Re Dcrdr. Attendance List & Meeting Notice Encl ML20128G3301985-06-0606 June 1985 Summary of 850328 Meeting W/Util,Gao & S&W in Bethesda,Md Re PMP Issue & SER on Effects of Local Flooding.Meeting Notice, Agenda & List of Attendees Encl ML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20125C7971985-05-24024 May 1985 Summary of 831220 Meeting W/Util & S&W in Bethesda,Md Re Util Schedules,Plans & Progress in Resolving Electrical Separation Issues Involved in Complying W/Criteria of Reg Guide 1.75,Rev 2 ML20125C6951985-05-24024 May 1985 Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl ML20129C1721985-05-21021 May 1985 Summary of 850105 Meeting W/Util in Bethesda,Md Re Status of NRC Review of Applicant Reg Guide 1.97 Implementation Rept. List of Meeting Attendees Encl ML20129F3151985-05-20020 May 1985 Summary of 831214 Meeting W/Util & S&W in Bethesda,Md Re NRC Request for Addl Info Concerning Seismological Aspects of Fsar.List of Attendees ML20129E3071985-05-20020 May 1985 Summary of 841002 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Overall Status of Mechanical Engineering SER Open Items.List of Attendees & Meeting Agenda Encl ML20128A1951985-05-0303 May 1985 Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl ML20132C7381985-02-21021 February 1985 Summary of 841210-14 Site Visit 5 to Observe INPO Accreditation Team Evaluation of Adequacy of INPO Accreditation Process in Meeting Intent of Policy Statement on Training & Qualifications for Power Plants 1999-06-16
[Table view] |
Text
,
l x arq p 7:p g7 ry pq Qlp3 7,w g a y c. .
g MAY 3 1985 Docket No.: 50-412 APPLICANT: Cuquesne Light Company FACILITY: Beaver Valley Power Station, Unit 2
SUBJECT:
INSTRUMENTATION AND CONTROL SYSTEMS A meeting was held with Duquesne Light Company (DLC) on Wednesday, February 15, 1984 at NRC Headgearters in Bethesda, Maryland. DLC was accompanied by repre-sentatives of Stone & Webster Engineering Corporation (SWEC) and Westinghouse El ElectricCorporation(W). The NRC was represented by members of the Division of Licensing and the Division of Systems Integration. A list of attendees is en-closed as Enclosure 1.
The purpose of the meeting was to continue discussion of the Beaver Valley,\
Unit 2 instrumentation and control systems. At an earlier meeting in BostF Massachusetts during the week of December 5,1983, the staff identified arus of the r review which required further discussion with the applicant. This follow-up meeting addressed several of those issues. The applicant provided further information to the staff on items categorized as confinnatory or open at the previous meeting in Boston. Of the six open items, five were dtscussed.
Three of the five have been recategorized as confirmatory items pending FSAR changes or further information from the applicant. The other two remain open items.
- 1. Three steam generator level channels are used in a two-out-of-three logic for isolation of feedwater on high steam generator level. One of the three level channels is used for control. This design for actuation of feedwater isolation does not meet the requirements of Paragraph 4.7 of IEEE 270 on " Control and Protection System Interaction" in that the failure of the level channel used for control could require protective action and the remainder of the protection system channels would not satisfy the single - failure criterion.
- 2. The staff has expressed concern that the lack of redundancy for protective action initiated by low T avg. coincident with reactor trip may be a safety significant issue.
These issues will be discussed further with the applicant in future meetings.
9505240150 850503 PDR A ADOCK 05000412 Lisamarle Lazo, Project Manager PDR Licensing Branch No. 3 DL e
Enclesar:;
onc > . . . . .1. s. . .s. .t.a.
i..................... ..LB#3:DL m,,L.,,,,,,,, ,,,,,,,,,,,,,,,, ,,,, ,,,,,,,,,,,, ,,,,,,,, ,, ,,,,,,,, ,,,,
.t. e. .................., ,, ,
a:arr> Llazo:ft
~ ~ ~ ~ ~ ~ ~ -
ighton
-~~~~~~~~~. ~~~~.~~~~.~. ..................... .................,..
""1;cr See next"page ~~
""""""""" """~~~~~~~ ~ ~ .4 /. M /.N . . . ...b..d8.i..... .................. .. .................. . . . . . . . . . . . . . . . . . . ,
- a opo i m -4* w uncro:w eno scinacu o24 OFFICIAL RECORD COPY . . - . . . . . - . . . ,.m ~ , ,,.m,
9 Beaver Valley Mr. John J. Carey
} Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 110 PA Route 60 Pittsburgh, Pennsylvania 15205 Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Engineering day E. Silberg, Esq. Beaver Valley Two Pro.fect Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Robinson Plaza Building No. 2 Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager- Assistant Counsel Quality Assurance Department Governor Energy Council Duquense Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. John J. Carey Vice President, Nuclear Duquense Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Pittsburgh, Pennsylvania 15205 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17170 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Padiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Dox 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 U. S. NRC. John A. Lee, Eso.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229
Mr. E. F. Kurtz, Jr., Manager Regulatory Affairs Beaver Valley Two Project Duquense Light Company Robinson Plaza Buidling No. 2 Suite #210 PA Route 60 Pittshurgh,.Pennsylyania 15205 5
l l
J
,g' ENCLOSURE 1 ATTENDEES NRC APPLICANT L. Lazo K. Troxler. DLC F. Burrows R. Fedin, DLC T. Dunning E. Kurtz, DLC A. Sterdis, W J. Mesmeringer, W S. Phillips, W T. Blackburn, W G. Bellamacina, SWEC J. Catahogna, SWEC 4
MEETING
SUMMARY
DISTRIBUTION Sh lie (s).;M60-412 NRC PDR ~ * %c Local POR NSIC PRC System LB3 Reading Attorney, 0 ELD GWKnighton Project Manager Lisamarie Lazo JLee NRC PARTICIPANTS .
L. Lazo F. Burrows T. Dunning bec: Applicant & Service List 4