Summary of 850215 Meeting W/Util,S&W & Westinghouse in Bethesda,Md Re Instrumentation & Control Sys.List of Attendees Encl
ML20128A195
Person / Time
Site: Beaver Valley
Issue date: 05/03/1985
From: Lazo L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-62881, NUDOCS 8505240150
Download: ML20128A195 (5)


Text

,

l x arq p 7:p g7 ry pq Qlp3 7,w g a y c. .

g MAY 3 1985 Docket No.: 50-412 APPLICANT: Cuquesne Light Company FACILITY: Beaver Valley Power Station, Unit 2

SUBJECT:

INSTRUMENTATION AND CONTROL SYSTEMS A meeting was held with Duquesne Light Company (DLC) on Wednesday, February 15, 1984 at NRC Headgearters in Bethesda, Maryland. DLC was accompanied by repre-sentatives of Stone & Webster Engineering Corporation (SWEC) and Westinghouse El ElectricCorporation(W). The NRC was represented by members of the Division of Licensing and the Division of Systems Integration. A list of attendees is en-closed as Enclosure 1.

The purpose of the meeting was to continue discussion of the Beaver Valley,\

Unit 2 instrumentation and control systems. At an earlier meeting in BostF Massachusetts during the week of December 5,1983, the staff identified arus of the r review which required further discussion with the applicant. This follow-up meeting addressed several of those issues. The applicant provided further information to the staff on items categorized as confinnatory or open at the previous meeting in Boston. Of the six open items, five were dtscussed.

Three of the five have been recategorized as confirmatory items pending FSAR changes or further information from the applicant. The other two remain open items.

1. Three steam generator level channels are used in a two-out-of-three logic for isolation of feedwater on high steam generator level. One of the three level channels is used for control. This design for actuation of feedwater isolation does not meet the requirements of Paragraph 4.7 of IEEE 270 on " Control and Protection System Interaction" in that the failure of the level channel used for control could require protective action and the remainder of the protection system channels would not satisfy the single - failure criterion.
2. The staff has expressed concern that the lack of redundancy for protective action initiated by low T avg. coincident with reactor trip may be a safety significant issue.

These issues will be discussed further with the applicant in future meetings.

9505240150 850503 PDR A ADOCK 05000412 Lisamarle Lazo, Project Manager PDR Licensing Branch No. 3 DL e

Enclesar:;

onc > . . . . .1. s. . .s. .t.a.

i..................... ..LB#3:DL m,,L.,,,,,,,, ,,,,,,,,,,,,,,,, ,,,, ,,,,,,,,,,,, ,,,,,,,, ,, ,,,,,,,, ,,,,

.t. e. .................., ,, ,

a:arr> Llazo:ft

~ ~ ~ ~ ~ ~ ~ -

ighton

-~~~~~~~~~. ~~~~.~~~~.~. ..................... .................,..

""1;cr See next"page ~~

""""""""" """~~~~~~~ ~ ~ .4 /. M /.N . . . ...b..d8.i..... .................. .. .................. . . . . . . . . . . . . . . . . . . ,

  • a opo i m -4* w uncro:w eno scinacu o24 OFFICIAL RECORD COPY . . - . . . . . - . . . ,.m ~ , ,,.m,

9 Beaver Valley Mr. John J. Carey

} Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 110 PA Route 60 Pittsburgh, Pennsylvania 15205 Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Engineering day E. Silberg, Esq. Beaver Valley Two Pro.fect Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Robinson Plaza Building No. 2 Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager- Assistant Counsel Quality Assurance Department Governor Energy Council Duquense Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. John J. Carey Vice President, Nuclear Duquense Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Pittsburgh, Pennsylvania 15205 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17170 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Padiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Dox 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 U. S. NRC. John A. Lee, Eso.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229

Mr. E. F. Kurtz, Jr., Manager Regulatory Affairs Beaver Valley Two Project Duquense Light Company Robinson Plaza Buidling No. 2 Suite #210 PA Route 60 Pittshurgh,.Pennsylyania 15205 5

l l

J

,g' ENCLOSURE 1 ATTENDEES NRC APPLICANT L. Lazo K. Troxler. DLC F. Burrows R. Fedin, DLC T. Dunning E. Kurtz, DLC A. Sterdis, W J. Mesmeringer, W S. Phillips, W T. Blackburn, W G. Bellamacina, SWEC J. Catahogna, SWEC 4

MEETING

SUMMARY

DISTRIBUTION Sh lie (s).;M60-412 NRC PDR ~ * %c Local POR NSIC PRC System LB3 Reading Attorney, 0 ELD GWKnighton Project Manager Lisamarie Lazo JLee NRC PARTICIPANTS .

L. Lazo F. Burrows T. Dunning bec: Applicant & Service List 4