ML20212N168

From kanterella
Jump to navigation Jump to search

Requests Exemption from Requirements of 10CFR50,App J,Section III.D.2(b)(ii) Re Testing Air Locks Opened During Periods When Containment Integrity Not Required by Tech Spec.Tech Spec 4.6.1.3.b Deviates from Requirement
ML20212N168
Person / Time
Site: Beaver Valley
Issue date: 03/06/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2NRC-7-042, 2NRC-7-42, TAC-62942, NUDOCS 8703120385
Download: ML20212N168 (2)


Text

-- - - - - - - - -

~

e

'A@

M 2NRC-7-042 Beaver Valley No. 2 Unit Project Organization Telecopy ( 1 ) 643 2 Ext.160 S.E.G. Building j

P.O. Box 328 March 6, 1987 Shippingport. PA 15077 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station Unit No. 2 Docht No. 50-412 Exemption Request - Appendix J Gentlemen:

10 CFR 50 Appendix J, Section Ill.D.2(b)(ii), states that " Air locks open-ed during periods when containment integrity is not required by the plant Tech-nical Specifications shall be tested at the end of such periods at not less t h an P a" .

However, Technical Specification surveil lance requirenent 4.6.1.3.b requires an overall air lock leak rate test at a (44.7 psig) to be performed only "Upon completion of maintenance which has been performed on the air lock that could affect the air lock sealing capability". Therefore, since this technical specification constitutes a deviation from the subject regulation, we are requesting an exemption with respect to the requirements of 10 CFR 50, Appendix J, Section ll1.D.2(b)(ii). This request is in accordance with the provisions of 10 CFR 50.12 and reflects an identical exemption granted for BV-1, dated November 19, 1984 and described in the NRC SER for Amendment No. 85 to the BV-1 Technical Specifications.

DUQUESNE LIGHT COMPANY V. J. Carey Senior Vice President REM /ijr NR/JJC/APPNDX/J AR/NAR cc: Mr. P. Tam, Project Manager Mr . J. Beall, NRC Sr. Resident Inspector hCO(

Ms. A. Asars, NRC Resident inspector f INP6 Records Center I

(

NRC Document Control Desk 0703120385 8'70306 PDR ADOCK ObOOO412 A PDR

o United States Nuclear Regulatory Commission Exemption Request - Appendix J Page 2 COMMONWEALTH OF PENNSYLVANIA )

) SS:

1 COUNTY OF BEAVER )

On this d day of( dM ,

/MN, before me, a Notary Public in and for said Commonwealth and County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (1) he is Senior Vice President of Duquesne Light, (2) he -is -duly authorized to execute and

-file the foregoing Submi ttal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

A /?) W Notary Public 5XUl4 8.1ATIC21, ACTMY FueuC SH:PPlHGPORT90RO, BEAVE2 COUliTY BY C0EMIS$100 UPIRES 007. 23. !?89 Ipereber. #enespmh Asso:iatiw of EcWw