ML20212M232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20212M232
| number = ML20212M232
| issue date = 01/13/1987
| issue date = 01/13/1987
| title = Responds to 861112 Ltr Re Safety Concerns at Plant.Special Insp Conducted on 861113-14 to Investigate Concerns Received from Employee Legal Project.Rept,Issued on 861219,concluded That No Specific New Safety Issues Raised
| title = Responds to Re Safety Concerns at Plant.Special Insp Conducted on 861113-14 to Investigate Concerns Received from Employee Legal Project.Rept,Issued on 861219,concluded That No Specific New Safety Issues Raised
| author name = Murley T
| author name = Murley T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8701300043
| document report number = NUDOCS 8701300043
| title reference date = 11-12-1986
| package number = ML20212M235
| package number = ML20212M235
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA, OUTGOING CORRESPONDENCE

Latest revision as of 05:55, 5 May 2021

Responds to Re Safety Concerns at Plant.Special Insp Conducted on 861113-14 to Investigate Concerns Received from Employee Legal Project.Rept,Issued on 861219,concluded That No Specific New Safety Issues Raised
ML20212M232
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 01/13/1987
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Donnelly J
AFFILIATION NOT ASSIGNED
Shared Package
ML20212M235 List:
References
NUDOCS 8701300043
Download: ML20212M232 (2)


Text

u- -

1-(

es y JAN 131987 J. K. Donnelly 66 Western Avenue Cambridge, Massachusetts 02139

Dear J. K. Donnelly:

This refers to your letter of November 12, 1986 regarding safety concerns at Sea-brook Station. Your letter has been referred to me for response.

In July of this year, the NRC Region I Office learned of the establishment of the Employee's Legal Project of Amesbury, Massachusetts, which was designed to help current and former nuclear power plant employees to report safety problems at their work place. The Region I Office has been in frequent communication with the pro-ject's director, Ms. Sharon Tracy, since early August, 1986. NRC Region I received several pieces of correspondence from the Employee's Legal Project in September and October, 1986, which provided a number of safety concerns pertaining to the Seabrook Station.

These safety concerns, as they became available, were given to the NRC Resident Inspectors as well as Public Service of New Hampshire for preliminary investigation.

In the final analysis, some 61 potential safety concerns were formulated from the various documents received from the Employee's Legal Project. In order to thoroughly investigate these concerns collectively, a special team inspection was conducted by seven NRC Region I inspectors at Seabrook during the period November 3-14, 1986. In addition to their inspection activities at the site, these inspec-tors also interviewed those former workers who had given their concerns to the Employee's Legal project and who were willing to talk to the NRC.

The NRC Region I inspection team issued its final report on December 19, 1986.

The report concludes that the concerns raised by the Employee's Legal Project do not raise any specific new safety issues which adversely impact on safety at Sea-brook Station. At the conclusion of our inspection, we again told Ms. Tracy to contact NRC Region I immediately if she received additional concerns or more speci-fic information regarding existing concerns. NRC Region I is prepared to act promptly on any additional information provided by the Employee's Legal Project or others.

As a separate matter, I note that you indicated that you are a ratepayer in Massachusetts. In that regard, you may also wish to contact Catherine Morris, Director, Electric Power Division, Department of Public Utilities at the following address: Room 1206, 100 Cambridge Street, Boston, Massachusetts, 02202. The De-partment of Public Utilities has responsibility for economic regulation of power generating facilities serving the Commonwealth of Massachusetts.

Sincerely, Original Signed liy B701300043 8 **MW h ADOCK o kook 43 Thomas E. Murley PDR Regional Administrator

a; .-

e- p J. K. Donnelly 2 JAN 131987 bec:

T. Murley W. Kane E. Wenzinger T. Elsasser PDR (w/ original incoming letter)

V IDP RI:DRP y' h Rhy/ /FI:DRP RP er W

nger J

We Mu e A OFFICIAL RECORD COPY}}