ML091490314: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/29/2009
| issue date = 05/29/2009
| title = Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company
| title = Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company
| author name = Musser R A
| author name = Musser R
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Scarola J
| addressee name = Scarola J
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 29, 2009 Mr. James Scarola Senior Vice President and Chief Nuclear Officer Carolina Power and Light Company 410 S. Wilmington St. Raleigh, NC 27601-1748  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 29, 2009 Mr. James Scarola Senior Vice President and Chief Nuclear Officer Carolina Power and Light Company 410 S. Wilmington St.
Raleigh, NC 27601-1748


==SUBJECT:==
==SUBJECT:==
Line 21: Line 22:


==SUMMARY==
==SUMMARY==
- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS. 50-302, 50-325, 50-324, 50-400, 50-261  
- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS.
50-302, 50-325, 50-324, 50-400, 50-261


==Dear Mr. Scarola:==
==Dear Mr. Scarola:==


This refers to the meeting conducted at your request at the NRC Region II Office on May 22, 2009 , at 1:00 pm
This refers to the meeting conducted at your request at the NRC Region II Office on May 22, 2009, at 1:00 pm. The meeting's purpose was for Carolina Power and Light Company and Florida Power Corporation (doing business as Progress Energy Carolinas, Inc. and Progress Energy Florida, Inc., respectively) to discuss Brunswick Steam Electric Plant Performance and to introduce their new organizational strategies and initiatives within the company.
. The meeting's purpose was for Carolina Power and Light Company and Florida Power Corporation (doing business as Progress Energy Carolinas, Inc. and Progress Energy Florida, Inc., respectively) to discuss Brunswick Steam Electric Plant Performance and to introduce their new organizational strategies and initiatives within the company.
The topics discussed included organizational and personnel changes, Brunswick Steam Electric Plant Performance, and company initiatives and challenges. Enclosed are a list of attendees, the presentation handouts, and the licensees fleet alignment model.
The topics discussed included organizational and personnel changes, Brunswick Steam Electric Plant Performance, and company initiatives and challenges. Enclosed are a list of attendees, the presentation handouts, and the licensee's fleet alignment model.
In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 562-4603. Sincerely,             /RA/
Should you have any questions concerning this meeting, please contact me at (404) 562-4603.
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-302, 50-325, 50-324, 50-400, 50-261 License Nos.: DPR-71, DPR-62, DPR-72, DPR-23, NPF-63  
Sincerely,
                                              /RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-302, 50-325, 50-324, 50-400, 50-261 License Nos.: DPR-71, DPR-62, DPR-72, DPR-23, NPF-63


==Enclosures:==
==Enclosures:==
As stated cc w/encl.: (See page 2)
As stated cc w/encl.: (See page 2)


_________________________ X   SUNSI REVIEW COMPLETE RAM OFFICE RII:DRP RII:DRP     SIGNATURE KME /RA/ RAM /RA/     NAME KEllis RMusser     DATE 05/28/2009 05/29/2009     E-MAIL COPY?     YES NO  YES NO   YES NO  YES NO   YES NO  YES NO   YES NO CP&L 2   cc w/encl: Brian C. McCabe, Manager Nuclear Regulatory Affairs Progress Energy Electronic Mail Distribution Director, Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company P.O. Box 10429 Southport, NC   28461-0429 R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Benjamin C. Waldrep Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB5 Carolina Power & Light Company Electronic Mail Distribution Edward L. Wills, Jr.
_________________________                         X SUNSI REVIEW COMPLETE RAM OFFICE               RII:DRP           RII:DRP SIGNATURE           KME /RA/         RAM /RA/
Plant General Manager Brunswick Steam Electric Plant Carolina Power and Light Company Electronic Mail Distribution  
NAME                 KEllis           RMusser DATE                   05/28/2009       05/29/2009 E-MAIL COPY?           YES       NO  YES         NO   YES       NO  YES       NO   YES     NO  YES       NO   YES NO CP&L                                     2 cc w/encl:                                 Garry D. Miller, Manager Brian C. McCabe, Manager                   License Renewal Nuclear Regulatory Affairs                 Progress Energy Progress Energy                            Electronic Mail Distribution Electronic Mail Distribution Gene Atkinson Director, Site Operations                   Supervisor Brunswick Steam Electric Plant             Licensing/Regulatory Programs Carolina Power & Light Company             Brunswick Steam Electric Plant P.O. Box 10429                             Electronic Mail Distribution Southport, NC 28461-0429 James Ross R. J. Duncan, II                           Nuclear Energy Institute Vice President                             Electronic Mail Distribution Nuclear Operations Carolina Power & Light Company             John H. O'Neill, Jr.
Electronic Mail Distribution               Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Benjamin C. Waldrep                         Washington, DC 20037-1128 Vice President Brunswick Steam Electric Plant             Beverly O. Hall Carolina Power & Light Company             Chief, Radiation Protection Section Electronic Mail Distribution               Department of Environmental Health N.C. Department of Environmental Paul Fulford, Manager                       Commerce & Natural Resources Performance Evaluation and Regulatory       Electronic Mail Distribution Affairs PEB5 Carolina Power & Light Company             Peggy Force Electronic Mail Distribution               Assistant Attorney General State of North Carolina Edward L. Wills, Jr.                       P.O. Box 629 Plant General Manager                       Raleigh, NC 27602 Brunswick Steam Electric Plant Carolina Power and Light Company           Chairman Electronic Mail Distribution                North Carolina Utilities Commission Electronic Mail Distribution Donald L. Griffith, Manager Brunswick Steam Electric Plant              Robert P. Gruber Progress Energy Carolinas, Inc.            Executive Director Electronic Mail Distribution                Public Staff - NCUC 4326 Mail Service Center Randy C. Ivey, Manager                      Raleigh, NC 27699-4326 Support Services Brunswick Steam Electric Plant                                      (cc w/encl cont - See next page)
Progress Energy Carolinas, Inc.
Electronic Mail Distribution


Donald L. Griffith, Manager Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution Randy C. Ivey, Manager Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution Garry D. Miller, Manager License Renewal Progress Energy Electronic Mail Distribution  
CP&L                                   3 cc w/encl: cont                          Tommy Emerson, Chair Board of County Commissioners of Public Service Commission                Chatham County State of South Carolina                  186 Emerson Road P.O. Box 11649                            Siler City, NC 27344 Columbia, SC 29211 Kelvin Henderson David R. Sandifer                        Plant General Manager Brunswick County Board of Commissioners  Carolina Power and Light Company P.O. Box 249                              Shearon Harris Nuclear Power Plant Bolivia, NC 28422                        Electronic Mail Distribution Warren Lee                                Eric McCartney Emergency Management Director            Director Site Operations New Hanover County Department of          Carolina Power & Light Company Emergency Management                      Electronic Mail Distribution 230 Government Center Drive Suite 115                                Ernest J. Kapopoulos, Jr.
Wilmington, NC 28403                      Plant General Manager Carolina Power & Light Company J. Wayne Guganious                        Electronic Mail Distribution Training Manager Harris                                    Curt A. Castell, Supervisor Progress Energy Carolinas, Inc.           Licensing/Regulatory Programs Electronic Mail Distribution             Carolina Power & Light Company H. B. Robinson Steam Electric Plant Kimberly Harshaw, Manager                 3581 West Entrance Road Support Services                         Hartsville, SC 29550 Progress Energy Carolinas, Inc.
Electronic Mail Distribution             C. T. Baucom, Manager Support Services - Nuclear David H. Corlett, Supervisor              Carolina Power & Light Company Licensing/Regulatory Programs            Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution              Susan E. Jenkins Director, Division of Waste Management David T. Conley                          Bureau of Land and Waste Management Associate General Counsel                S.C. Department of Health and Legal Dept.                              Environmental Control Progress Energy Service Company, LLC      Electronic Mail Distribution Electronic Mail Distribution R. Mike Gandy Herb Council, Chair                      Division of Radioactive Waste Mgmt.
Board of County Commissioners of Wake    S.C. Department of Health and County                                    Environmental Control P.O. Box 550                              Electronic Mail Distribution Raleigh, NC 27602 (cc w/encl cont - See next page)


Gene Atkinson Supervisor Licensing/Regulatory Programs Brunswick Steam Electric Plant Electronic Mail Distribution James Ross Nuclear Energy Institute Electronic Mail Distribution John H. O'Neill, Jr.
CP&L                                4 cc w/encl: cont                      Steven R. Carr Associate General Counsel S. D. West                            Legal Department Superintendent Security              Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant   P.O. Box 1551 Progress Energy                      Raleigh, NC 27602-1551 Electronic Mail Distribution William A. Passetti Jon A. Franke                        Chief Director Site Operations              Florida Bureau of Radiation Control Crystal River Nuclear Plant (NA2C)    Department of Health Electronic Mail Distribution          Electronic Mail Distribution Michael J. Annacone                  Craig Fugate Plant General Manager                Director Crystal River Nuclear Plant (NA2C)    Division of Emergency Preparedness Electronic Mail Distribution          Department of Community Affairs Electronic Mail Distribution Phyllis Dixon, Manager Nuclear Assessment                    Chairman Crystal River Nuclear Plant (NA2C)    Board of County Commissioners Electronic Mail Distribution          Citrus County 110 N. Apopka Avenue Stephen J. Cahill                    Inverness, FL 36250 Engineering Manager Crystal River Nuclear Plant (NA2C)    Attorney General Electronic Mail Distribution          Department of Legal Affairs The Capitol PL-01 Daniel J. Roderick                    Tallahassee, FL 32399-1050 Vice President Nuclear Projects and Construction Crystal River Nuclear Plant Electronic Mail Distribution David M. Varner, Manager Support Services - Nuclear Crystal River Nuclear Plant Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC  20037-1128 Beverly O. Hall Chief, Radiation Protection Section Department of Environmental Health N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution  
Florida Power Corporation Electronic Mail Distribution


Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC  27602 Chairman North Carolina Utilities Commission Electronic Mail Distribution
CP&L                                       3 Letter to J. Scarola from Randall A. Musser dated May 29, 2009
 
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC  27699-4326
 
(cc w/encl con't - See next page)
 
CP&L 3   cc w/encl: con't Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC  29211 David R. Sandifer Brunswick County Board of Commissioners P.O. Box 249 Bolivia, NC  28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC  28403 J. Wayne Guganious Training Manager Harris Progress Energy Carolinas, Inc. Electronic Mail Distribution Kimberly Harshaw, Manager Support Services Progress Energy Carolinas, Inc. Electronic Mail Distribution David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution Herb Council, Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC  27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC  27344 Kelvin Henderson Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Eric McCartney Director Site Operations Carolina Power & Light Company Electronic Mail Distribution
 
Ernest J. Kapopoulos, Jr. Plant General Manager Carolina Power & Light Company Electronic Mail Distribution
 
Curt A. Castell, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC  29550 C. T. Baucom, Manager Support Services - Nuclear Carolina Power & Light Company Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution (cc w/encl con't - See next page)
CP&L 4  cc w/encl: con't S. D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Phyllis Dixon, Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Daniel J. Roderick Vice President Nuclear Projects and Construction Crystal River Nuclear Plant Electronic Mail Distribution David M. Varner, Manager Support Services - Nuclear Crystal River Nuclear Plant Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) Florida Power Corporation Electronic Mail Distribution
 
Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC  27602-1551 William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL  36250 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL  32399-1050
 
CP&L 3  Letter to J. Scarola from Randall A. Musser dated May 29, 2009  


==SUBJECT:==
==SUBJECT:==
Line 70: Line 58:


==SUMMARY==
==SUMMARY==
- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS. 50-302, 50-325, 50-324, 50-400, 50-261 Distribution w/encl
- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS.
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource RidsNRRPMBrunswick Resource RidsNRRPMHarris Resource RidsNRRPMCrystalRiver Resource  
50-302, 50-325, 50-324, 50-400, 50-261 Distribution w/encl:
 
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource RidsNRRPMBrunswick Resource RidsNRRPMHarris Resource RidsNRRPMCrystalRiver Resource BNP NRC Performance Indicators Cornerstone/Barrier          Indicator Color        Industry Quartile (Margin Remaining in Green)
Enclosure 1 Enclosure 2  
Unit 1            Unit 2 Unit 1           Unit 2 Unplanned Scrams                        73%                33%    3rd              4th Unplanned Scrams with Complications      0%              100%    4th              1st Unplanned Power Changes                87%              100%    2nd              1st MSPI - Emergency AC Power              84%                86%    N/A              N/A MSPI - High Pressure Injection- HPCI    76%                78%    N/A              N/A MSPI - Heat Removal- RCIC              104%              100%    N/A              N/A MSPI - Residual Heat Removal- RHR      154%              141%    N/A              N/A MSPI - Service Water- SW                65%              102%    N/A              N/A Safety System Functional Failures      50%                33%    4th              4th RCS Specific Activity                  99.9%              97.2%  2nd              4th RCS Leakage                            72%                79%    4th              4th ERO Drill/Exercise Performance          75%                75%    2nd              2nd ERO Drill Participation                100%              100%    1st              1st ERO Alert & Notification System        100%              100%    1st              1st Occupational Exposure Control          100%              100%    1st              1st RETS/ODCM Effluents                    100%              100%    1st              1st 6                                          6 Enclosure 2


Enclosure 2
Generation Loss Events 2 Year Period                                                          Number of Events per Year 7                                                                                             8 Generation Loss Events 6                                                                                             7 5
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2 BNP NRC Performance Indicators 6Cornerstone/BarrierIndicator Color(Margin Remaining in Green)Industry Quartile Unit 1Unit 2 Unit 1Unit 2Unplanned Scrams 73%33% 3 rd 4 thUnplanned Scrams with Complications 0%100% 4 th 1 stUnplanned Power Changes 87%100% 2 nd 1 stMSPI -Emergency AC Power 84%86% N/AN/AMSPI -High Pressure Injection-HPCI 76%78% N/AN/AMSPI -Heat Removal-RCIC 104%100% N/AN/AMSPI -Residual Heat Removal-RHR 154%141% N/AN/AMSPI -Service Water-SW 65%102% N/AN/ASafety System Functional Failures 50%33% 4 th 4 thRCS Specific Activity 99.9%97.2% 2 nd 4 thRCS Leakage 72%79% 4 th 4 thERO Drill/Exercise Performance 75%75% 2 nd 2 ndERO Drill Participation 100%100% 1 st 1 stERO Alert & Notification System 100%100% 1 st 1 stOccupational Exposure Control 100%100% 1 st 1 stRETS/ODCM Effluents 100%100% 1 st 1 st 6 Enclosure 2 Generation Loss EventsUnit 1Unit 2 7 0 1 2 3 4 5 6 7200403200412 200509 200606 200703 200712 200809Generation Loss Events2 Year PeriodBNP-1Top QuartileMedian4th Quartile 0 2 4 6 8 10200403200412 200509 200606 200703 200712 200809Generation Loss Events2 Year PeriodBNP-2Top QuartileMedian4th Quartile 7 4 6 4 2 1 0 1 2 3 4 5
6 7
6 7
8200420052006200720082009 Qtr 1Number of Events per Year 9 8 5 0 3 1 0 1 2 3 4
4                                                                                                                          6 5
5 6 7 8 9 10200420052006200720082009 Qtr 1Number of Events per Year
3 2                                                                                              4 1                                                                                             3 4                    4 0
 
2 Unit 1 200403      200412        200509        200606    200703    200712        200809 2
Enclosure 2 Power History Results 81.Planned SW Outage2.Refuel Outage  B117R13.Planned 1A Recirc Pump Seal  Outage/EHC SCRAM 4.1A Reactor Feedpump Casing Drain Instrument1.Scheduled Valve Test, Replaced 2A & 2B RFP LO Motor Fans2.Repair  Steam Leak 5A FW Drain3.Power Load Unbalance SCRAM4.Circ Water Ocean Discharge Pump 5.Manual SCRAM -SRV-H6.Refuel Outage B219R1 Unit 1 12 3 Unit 2 1 2 3 4 5 4 64 Key Behaviors1)Human Performance 2)Accountability3)Risk Mitigation4)Technical RigorCommon cause analysis
1 1
 
0 BNP-1              Top Quartile                Median              4th Quartile          2004  2005      2006      2007      2008  2009 Qtr 1 2 Year Period                                                          Number of Events per Year 10                                                                                            10 Generation Loss Events 9
Enclosure 2  
8 8    9 6                                                                                              7            8 4                                                                                              6 5
 
2                                                                                             4                       5 Unit 2                                0                                                                                              3 2                                           3 200403      200412        200509        200606    200703  200712        200809      1                                0                    1 0
Enclosure 2
BNP-2             Top Quartile                Median              4th Quartile          2004  2005        2006      2007      2008  2009 Qtr 1 7                                                                                                                                                                                Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2  
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2 Enclosure 3


Enclosure 3}}
Power History Results
: 1. Planned SW Outage
: 2. Refuel Outage B117R1 4  3. Planned 1A Recirc Unit 1                              Pump Seal 1    2          3 Outage/EHC SCRAM
: 4. 1A Reactor Feedpump Casing Drain Instrument 4 Key Behaviors 1)Human Performance Common cause analysis  2)Accountability 3)Risk Mitigation
: 1. Scheduled Valve Test, 4)Technical Rigor 4            Replaced 2A & 2B RFP LO Motor Fans
: 2. Repair Steam Leak 5A Unit 2    1    2    3  5    6    FW Drain
: 3. Power Load Unbalance SCRAM
: 4. Circ Water Ocean Discharge Pump
: 5. Manual SCRAM -
SRV-H
: 6. Refuel Outage B219R1 8
Enclosure 2
              }}

Latest revision as of 13:05, 12 March 2020

Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company
ML091490314
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 05/29/2009
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Scarola J
Carolina Power & Light Co
References
Download: ML091490314 (30)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 29, 2009 Mr. James Scarola Senior Vice President and Chief Nuclear Officer Carolina Power and Light Company 410 S. Wilmington St.

Raleigh, NC 27601-1748

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS.

50-302, 50-325, 50-324, 50-400, 50-261

Dear Mr. Scarola:

This refers to the meeting conducted at your request at the NRC Region II Office on May 22, 2009, at 1:00 pm. The meeting's purpose was for Carolina Power and Light Company and Florida Power Corporation (doing business as Progress Energy Carolinas, Inc. and Progress Energy Florida, Inc., respectively) to discuss Brunswick Steam Electric Plant Performance and to introduce their new organizational strategies and initiatives within the company.

The topics discussed included organizational and personnel changes, Brunswick Steam Electric Plant Performance, and company initiatives and challenges. Enclosed are a list of attendees, the presentation handouts, and the licensees fleet alignment model.

In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-302, 50-325, 50-324, 50-400, 50-261 License Nos.: DPR-71, DPR-62, DPR-72, DPR-23, NPF-63

Enclosures:

As stated cc w/encl.: (See page 2)

_________________________ X SUNSI REVIEW COMPLETE RAM OFFICE RII:DRP RII:DRP SIGNATURE KME /RA/ RAM /RA/

NAME KEllis RMusser DATE 05/28/2009 05/29/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl: Garry D. Miller, Manager Brian C. McCabe, Manager License Renewal Nuclear Regulatory Affairs Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Gene Atkinson Director, Site Operations Supervisor Brunswick Steam Electric Plant Licensing/Regulatory Programs Carolina Power & Light Company Brunswick Steam Electric Plant P.O. Box 10429 Electronic Mail Distribution Southport, NC 28461-0429 James Ross R. J. Duncan, II Nuclear Energy Institute Vice President Electronic Mail Distribution Nuclear Operations Carolina Power & Light Company John H. O'Neill, Jr.

Electronic Mail Distribution Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Benjamin C. Waldrep Washington, DC 20037-1128 Vice President Brunswick Steam Electric Plant Beverly O. Hall Carolina Power & Light Company Chief, Radiation Protection Section Electronic Mail Distribution Department of Environmental Health N.C. Department of Environmental Paul Fulford, Manager Commerce & Natural Resources Performance Evaluation and Regulatory Electronic Mail Distribution Affairs PEB5 Carolina Power & Light Company Peggy Force Electronic Mail Distribution Assistant Attorney General State of North Carolina Edward L. Wills, Jr. P.O. Box 629 Plant General Manager Raleigh, NC 27602 Brunswick Steam Electric Plant Carolina Power and Light Company Chairman Electronic Mail Distribution North Carolina Utilities Commission Electronic Mail Distribution Donald L. Griffith, Manager Brunswick Steam Electric Plant Robert P. Gruber Progress Energy Carolinas, Inc. Executive Director Electronic Mail Distribution Public Staff - NCUC 4326 Mail Service Center Randy C. Ivey, Manager Raleigh, NC 27699-4326 Support Services Brunswick Steam Electric Plant (cc w/encl cont - See next page)

Progress Energy Carolinas, Inc.

Electronic Mail Distribution

CP&L 3 cc w/encl: cont Tommy Emerson, Chair Board of County Commissioners of Public Service Commission Chatham County State of South Carolina 186 Emerson Road P.O. Box 11649 Siler City, NC 27344 Columbia, SC 29211 Kelvin Henderson David R. Sandifer Plant General Manager Brunswick County Board of Commissioners Carolina Power and Light Company P.O. Box 249 Shearon Harris Nuclear Power Plant Bolivia, NC 28422 Electronic Mail Distribution Warren Lee Eric McCartney Emergency Management Director Director Site Operations New Hanover County Department of Carolina Power & Light Company Emergency Management Electronic Mail Distribution 230 Government Center Drive Suite 115 Ernest J. Kapopoulos, Jr.

Wilmington, NC 28403 Plant General Manager Carolina Power & Light Company J. Wayne Guganious Electronic Mail Distribution Training Manager Harris Curt A. Castell, Supervisor Progress Energy Carolinas, Inc. Licensing/Regulatory Programs Electronic Mail Distribution Carolina Power & Light Company H. B. Robinson Steam Electric Plant Kimberly Harshaw, Manager 3581 West Entrance Road Support Services Hartsville, SC 29550 Progress Energy Carolinas, Inc.

Electronic Mail Distribution C. T. Baucom, Manager Support Services - Nuclear David H. Corlett, Supervisor Carolina Power & Light Company Licensing/Regulatory Programs Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management David T. Conley Bureau of Land and Waste Management Associate General Counsel S.C. Department of Health and Legal Dept. Environmental Control Progress Energy Service Company, LLC Electronic Mail Distribution Electronic Mail Distribution R. Mike Gandy Herb Council, Chair Division of Radioactive Waste Mgmt.

Board of County Commissioners of Wake S.C. Department of Health and County Environmental Control P.O. Box 550 Electronic Mail Distribution Raleigh, NC 27602 (cc w/encl cont - See next page)

CP&L 4 cc w/encl: cont Steven R. Carr Associate General Counsel S. D. West Legal Department Superintendent Security Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant P.O. Box 1551 Progress Energy Raleigh, NC 27602-1551 Electronic Mail Distribution William A. Passetti Jon A. Franke Chief Director Site Operations Florida Bureau of Radiation Control Crystal River Nuclear Plant (NA2C) Department of Health Electronic Mail Distribution Electronic Mail Distribution Michael J. Annacone Craig Fugate Plant General Manager Director Crystal River Nuclear Plant (NA2C) Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Phyllis Dixon, Manager Nuclear Assessment Chairman Crystal River Nuclear Plant (NA2C) Board of County Commissioners Electronic Mail Distribution Citrus County 110 N. Apopka Avenue Stephen J. Cahill Inverness, FL 36250 Engineering Manager Crystal River Nuclear Plant (NA2C) Attorney General Electronic Mail Distribution Department of Legal Affairs The Capitol PL-01 Daniel J. Roderick Tallahassee, FL 32399-1050 Vice President Nuclear Projects and Construction Crystal River Nuclear Plant Electronic Mail Distribution David M. Varner, Manager Support Services - Nuclear Crystal River Nuclear Plant Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution

CP&L 3 Letter to J. Scarola from Randall A. Musser dated May 29, 2009

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING WITH CAROLINA POWER AND LIGHT AND FLORIDA POWER CORPORATION REGARDING BRUNSWICK STEAM ELECTRIC PLANT PERFORMANCE AND ORGANIZATIONAL ALIGNMENT WITHIN THE COMPANY - DOCKET NOS.

50-302, 50-325, 50-324, 50-400, 50-261 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource RidsNRRPMBrunswick Resource RidsNRRPMHarris Resource RidsNRRPMCrystalRiver Resource BNP NRC Performance Indicators Cornerstone/Barrier Indicator Color Industry Quartile (Margin Remaining in Green)

Unit 1 Unit 2 Unit 1 Unit 2 Unplanned Scrams 73% 33% 3rd 4th Unplanned Scrams with Complications 0% 100% 4th 1st Unplanned Power Changes 87% 100% 2nd 1st MSPI - Emergency AC Power 84% 86% N/A N/A MSPI - High Pressure Injection- HPCI 76% 78% N/A N/A MSPI - Heat Removal- RCIC 104% 100% N/A N/A MSPI - Residual Heat Removal- RHR 154% 141% N/A N/A MSPI - Service Water- SW 65% 102% N/A N/A Safety System Functional Failures 50% 33% 4th 4th RCS Specific Activity 99.9% 97.2% 2nd 4th RCS Leakage 72% 79% 4th 4th ERO Drill/Exercise Performance 75% 75% 2nd 2nd ERO Drill Participation 100% 100% 1st 1st ERO Alert & Notification System 100% 100% 1st 1st Occupational Exposure Control 100% 100% 1st 1st RETS/ODCM Effluents 100% 100% 1st 1st 6 6 Enclosure 2

Generation Loss Events 2 Year Period Number of Events per Year 7 8 Generation Loss Events 6 7 5

6 7

4 6 5

3 2 4 1 3 4 4 0

2 Unit 1 200403 200412 200509 200606 200703 200712 200809 2

1 1

0 BNP-1 Top Quartile Median 4th Quartile 2004 2005 2006 2007 2008 2009 Qtr 1 2 Year Period Number of Events per Year 10 10 Generation Loss Events 9

8 8 9 6 7 8 4 6 5

2 4 5 Unit 2 0 3 2 3 200403 200412 200509 200606 200703 200712 200809 1 0 1 0

BNP-2 Top Quartile Median 4th Quartile 2004 2005 2006 2007 2008 2009 Qtr 1 7 Enclosure 2

Power History Results

1. Planned SW Outage
2. Refuel Outage B117R1 4 3. Planned 1A Recirc Unit 1 Pump Seal 1 2 3 Outage/EHC SCRAM
4. 1A Reactor Feedpump Casing Drain Instrument 4 Key Behaviors 1)Human Performance Common cause analysis 2)Accountability 3)Risk Mitigation
1. Scheduled Valve Test, 4)Technical Rigor 4 Replaced 2A & 2B RFP LO Motor Fans
2. Repair Steam Leak 5A Unit 2 1 2 3 5 6 FW Drain
3. Power Load Unbalance SCRAM
4. Circ Water Ocean Discharge Pump
5. Manual SCRAM -

SRV-H

6. Refuel Outage B219R1 8

Enclosure 2