Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000261/2023004 | 31 January 2024 | Integrated Inspection Report 05000261/2023004 | |
IR 05000400/2023004 | 30 January 2024 | Integrated Inspection Report 05000400/2023004 | |
ML24009A243 | 25 January 2024 | Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
ML24009A271 | 24 January 2024 | Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | |
ML23342A094 | 9 January 2024 | Independent Spent Fuel Storage Installation Security Inspection Plan | |
ML23354A005 | 8 January 2024 | Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 | |
IR 05000324/2023011 | 26 December 2023 | NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management License Renewal Fire Protection Program |
ML23354A063 | 22 December 2023 | Cover Letter - Crystal River License Termination Plan Request for Additional Information | |
IR 05000324/2023402 | 14 December 2023 | Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 | |
ML23342A090 | 8 December 2023 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Condition Adverse to Quality Operability Determination License Renewal Maintenance Rule Program |
ML23345A188 | 6 December 2023 | Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project | |
IR 05000261/2023420 | 30 November 2023 | Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) | Safeguards Contingency Plan |
IR 05000261/2023010 | 28 November 2023 | Fire Protection Team Inspection Report 05000261/2023010 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management |
ML23297A026 | 27 November 2023 | Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections | Coatings Incorporated by reference |
ML23320A259 | 17 November 2023 | STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice | |
ML23313A132 | 15 November 2023 | Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant | License Renewal Environmental Justice |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
IR 05000400/2023003 | 9 November 2023 | Integrated Inspection Report 05000400/2023003 | Enforcement Discretion Probabilistic Risk Assessment Met Tower Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program |
ML23310A071 | 7 November 2023 | Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP | |
IR 05000261/2023003 | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Overtravel Maintenance Rule Program Fire Protection Program Substantial potential for overexposure Power change Overexposure |
IR 05000324/2023003 | 1 November 2023 | Integrated Inspection Report 05000324/2023003 and 05000325/2023003 | Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000324/2023010 | 17 October 2023 | Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 | |
IR 05000325/2023401 | 16 October 2023 | Security Baseline Inspection Report 05000324 and 05000325 2023401 | |
ML23226A086 | 12 October 2023 | Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b | Anticipated operational occurrence Surveillance Frequency Control Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23234A170 | 3 October 2023 | Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications | Incorporated by reference |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Fire Protection Program Unidentified leakage Operational leakage |
IR 05000400/2023005 | 23 August 2023 | Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) | Cyber Security |
ML23235A055 | 23 August 2023 | Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request COVID-19 Fire Protection Program |
IR 05000324/2023005 | 23 August 2023 | Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) | Commercial Grade Dedication Cyber Security License Renewal |
ML23234A254 | 22 August 2023 | RQ Inspection Notification Letter | |
IR 05000261/2023005 | 21 August 2023 | Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) | Commercial Grade Dedication |
IR 05000261/2023002 | 7 August 2023 | Integrated Inspection Report 05000261/2023002 | Enforcement Discretion Fire impairment Operating Basis Earthquake Temporary Modification Functionality Assessment Aging Management Operability Determination Earthquake Maintenance Rule Program Continuous fire watch Fire Protection Program Downpower |
IR 05000324/2023002 | 4 August 2023 | Integrated Inspection Report 05000324/2023002 and 05000325/2023002 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Local Leak Rate Testing Operability Determination Fire Protection Program Loss of condenser vacuum |
ML23201A204 | 28 July 2023 | Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner | |
IR 05000400/2023402 | 26 July 2023 | Security Baseline Inspection Report 05000400/2023402 | |
ML23187A111 | 25 July 2023 | Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements | |
ML23212B268 | 25 July 2023 | Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 | |
IR 05000324/2024301 | 25 July 2023 | Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 | |
IR 05000400/2023002 | 24 July 2023 | Integrated Inspection Report 05000400/2023002 | High winds High Radiation Area Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Fire Protection Program |
IR 05000400/2023440 | 17 July 2023 | Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter | Significance Determination Process Affidavit |
ML23107A272 | 13 June 2023 | Letter Transmitting NRC Survey Results for East Settling Pond | |
ML23160A296 | 9 June 2023 | Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan | |
ML23107A273 | 7 June 2023 | Orise Independent Survey Report Dcn 5366-SR-01-0 | |
IR 05000261/2023402 | 30 May 2023 | Cyber Security Inspection Report 05000261/2023402 | Cyber Security Affidavit |
ML23145A160 | 25 May 2023 | Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality | |
IR 05000302/2022003 | 25 May 2023 | Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 | Fire Barrier Locked High Radiation Area Fire Protection Program |
ML23212A950 | 24 May 2023 | Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material | |
ML23146A001 | 24 May 2023 | EN 56538 - Engine Systems Inc and Brunswick |