ML19260D091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 34: Line 34:
N /A
N /A
: 9. Power Level To Which Restricted. If Any (Net MWe):                                      M/A
: 9. Power Level To Which Restricted. If Any (Net MWe):                                      M/A
: 10. Reasons For Restrictioni,If Any:                                                        N/A
: 10. Reasons For Restrictioni,If Any:                                                        N/A This Month                Yr..to-Date          Cumulative
                                                                                                                                          ;
This Month                Yr..to-Date          Cumulative
: 11. Hours in Reporting Period                            744                        5.811                10 Ra9
: 11. Hours in Reporting Period                            744                        5.811                10 Ra9
: 12. Number Of Hours Reactor Was Critical                744                        4,896.2                9.581
: 12. Number Of Hours Reactor Was Critical                744                        4,896.2                9.581

Latest revision as of 07:26, 22 February 2020

Revised Monthly Operating Rept for Aug 1979
ML19260D091
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/29/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19260D082 List:
References
NUDOCS 8002070394
Download: ML19260D091 (2)


Text

bd VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH August YEAR 1979 Revised 1-29-80 SUBMITTED:

\ Sd E.E.w.,A SUPERINTENDENL - OPERATIONS APPROVED:

MANAGE 8 /

1937 195 800207e <399

OPERATING DATA REPORT DOCI(IT NO. 50-3P DATE l/d' Y COMPLETED BY W. R. TIIdison TELEPHONE /ud)m4-5151 OPERATING STATUS North Anna, Unit 1 N 5

1. Unit Name:
2. Reporting Period: Aono' 1070 / Pn "i c o rn

- - --,1. Licensed Thermal Power (MWt): 2775 ' ' ~~ ~~~'

4. Nameplate Rating (Gross MWe):

N' -

5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 928 - - -

7'. Maximum Dependable Capacity (Net MWe): 898

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report. Give Reasons:

N /A

9. Power Level To Which Restricted. If Any (Net MWe): M/A
10. Reasons For Restrictioni,If Any: N/A This Month Yr..to-Date Cumulative
11. Hours in Reporting Period 744 5.811 10 Ra9
12. Number Of Hours Reactor Was Critical 744 4,896.2 9.581
13. Reactor Reserve Shutdown Hours 0 4A 7 1as c
14. Hours Generator On-Line 744 4.810 1 4 471
15. Unit Resen e Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,044,516 12.948.750 29_14s Aac
17. Gross Electrical Energy Generated (MWH) 633.164 _ _ . 4 1n0 llo o nno ccc
18. Net Electrical Energy Generated (MWH) 597,915 1 RA9 177 7 q19 7no
19. Unit Service Factor 100 R? 6 A7 1
20. Unit Availabdity Factor 100 92.6 '

87.3

21. Unit Capacity Fsetor IUsing MDC Net) 89.5 73.9 77.3
22. Unit Capreity Factor (Using DER Net) 88.6 73.1 76.6
23. Unit Forced Outage Rate 0 5.3 3.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Refuelinc; Seoternber. Octobar. Nnvernbe r _ naromhor- 19 4..nn te e

25. If Shur Do vn At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status iPrior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY

(, -

INITIAL ELECTRICITY COMMERCIAL OPERATION 1937 196 t oi- >