| title = 10/06/1972 Summary of Meeting with Commonwealth Edison Company on Reporting and Organization of Information - Dresden Units 2 and 3
| title = Summary of Meeting with Commonwealth Edison Company on Reporting and Organization of Information - Dresden Units 2 and 3
| author name = Silver R D
| author name = Silver R
| author affiliation = US Atomic Energy Commission (AEC)
| author affiliation = US Atomic Energy Commission (AEC)
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:"'* "' :--"'! * ¥f ' OCT 3 'O 1972 Files (Dc;>cket  
{{#Wiki_filter:*
..
                                                                                        ~/* ¥f
50-237 *l-r2 THRU: D. L. Ziemann, Chief, -2, L . D.-/L.
~
MEETING WITH Cb);ONWEALTH EDISON COMPANY ON REPORTING AND OF INFORMATION
:- - ~"'!
... On October 6, 1972, a meeting was held in Bethesda with Connnonwealth Edison Company to discuss (1) plans for organizing information on Dresden 2 and 3 dockets (ref: ltr. to CEC dtd 7/18/72 and ltr. from CEC dtd 9/19/72) and (2) reporting of abnormal occurrences.
OCT 3 'O 1972 Files (Dc;>cket ..No~. 50-237 THRU: D. L. Ziemann, Chief,
Attending the meeting were: R. Diggs, L:OR-2 R. Silver, L:OR-2 J. Brentlinger, NARS Dell Butterfield, CEC Bob Lemke, CEC (assigned to H. Hoyt) Tom Tramm, CEC (assigned to B. Lee) George Wagner, CEC (to be assigned H. Hoyt) The CE representatives agreed to develop a cumulative subject index to include all technical submittals including the SAR, amendments to.the SAR, technical specifications change applications, special operations reports and semiannual reports of modifications.
                                                ~ l-r2 -2, L                             ~  .
The subject index will be based primarily on the SAR table of contents which_ will be_ expanded as necessary to .incorporate all relevant subject information by reference to document nu\llber, date and page thereof.
D.-/L. ~,._._,.~,..--.-...
The cumulative locater index will be revised semiannually and revised pages will be submitted' along with the semiannual report..  
MEETING WITH Cb);ONWEALTH EDISON COMPANY ON REPORTING AND             ORGANiZ~TION    ...
' -Regarding contents of abnormal occurrence  
OF INFORMATION On October 6, 1972, a meeting was held in Bethesda with Connnonwealth Edison Company to discuss (1) plans for organizing information on Dresden 2 and 3 dockets (ref: ltr. to CEC dtd 7/18/72 and ltr. from CEC dtd 9/19/72) and (2) reporting of abnormal occurrences. Attending the meeting were:
: reports, CE plans to set up a review mechan,i$I,Tl.
R. Diggs, L:OR-2                           Dell Butterfield, CEC R. Silver, L:OR-2                           Bob Lemke, CEC (assigned to H. Hoyt)
to_ assure that the discussions, especially of corrective  
J. Brentlinger, NARS                        Tom Tramm, CEC (assigned to B. Lee)
: actions, are complete arid that corrective actions at both Dresden Units and* both Quad-Cities Units are discussed.  
George Wagner, CEC (to be assigned ~o H. Hoyt)
(The Dresden plant superintendent discuss corrective actions at. Quad-Cities and visa versa and therefore a central review mechanism is necessary.)
The CE representatives agreed to develop a cumulative subject index to include all technical submittals including the SAR, amendments to.the SAR, technical specifications change applications, special operations reports and semiannual reports of modifications. The subject index will be based primarily on the SAR table of contents which_ will be_ expanded as necessary to .incorporate all relevant subject information by reference to document nu\llber, date and page thereof. The cumulative locater index will be revised semiannually and revised pages will be submitted' along with the semiannual report..                   ' -
The tentative plans.also call for*a central analysis of operating experience trends as part of the QA program.
Regarding t~e contents of abnormal occurrence reports, CE plans to set up a review mechan,i$I,Tl. to_ assure that the discussions, especially of corrective actions, are complete arid that corrective actions at both Dresden Units and*
CE also has begun an error analysis pr_ogram.
both Quad-Cities Units are discussed. (The Dresden plant superintendent can~ot discuss corrective actions at. Quad-Cities and visa versa and therefore a central review mechanism is necessary.)
The CE representatives stated that after an abnormal occurrence at one station, the nee,d for investigation.
The tentative plans.also call for*a central analysis of operating experience trends as part of the QA program. CE also has begun an error analysis pr_ogram.
and corrective action at the other station is q.lways checked.
The CE representatives stated that after an abnormal occurrence at one station, the nee,d for investigation. and corrective action at the other station is q.lways checked. CE agreed that whenever an abnormal occurrence involved the need for long term followup, the initial report would include a tentative date for submittal of 'the final report.
CE agreed that whenever an abnormal occurrence involved the need for long term followup, the initial report would include a tentative date for submittal of 'the final report. cc: See next page R. D. Silver . Operating Reactors Branch #2 Directorate of Licensing cc: D. J. Skovholt T. J. Carter D. L. Ziemann R. D. Silver R. M *. Diggs OGC RO (3) M. Jinks J. Brentlinger, NARS * ."" ..... ''i{;.. . *1: ',* i1' *1: ,, .'
R. D. Silver .
: 9. UNITED STATES ATOMIC EN,ERGY COMMISSION WASHINGTON, D.C. 20545 October 1972 ' R. C. DeYoung, Assistant Director for PWR' s, L TURKEY POINT 3 -INITIAL CRITICALITY We were informed by our Region' II (Atlanta)
Operating Reactors Branch #2 Directorate of Licensing cc:  See next page
Office that Turkey Point 3 achieved criticality at 10:03 p.m. (EDT) on October 20, 1972. Our reactor inspector, who was at the site, reported that the f-pproach to criticality was conducted in a safe and orderly manner and that the reactor coolant boron concentration at criticality was in reasonably close agreement with the predicted value. cc: E. J. Bloch, DDR s. H. Hanauer, DRTA F. E. Kruesi, RO \l* F. O'Leary, L E. G. Case, L A. Giambusso, L D. J. Skovholt, L R. s. Boyd, L R. L. Tedesco, L H. R. Denton, L D. F. Knuth, L R. R. Maccary, L D. R. Muller, L J. G. Keppler, RO K. Kniel, L P. s. Check, L w. c. Seidle, RO:II RO Regional Directors PDR Local PDR R. H. Engelken, Assistant Director for Inspection and Enforcement Directorate of Regulator)r Operations*
 
*}}
cc: D. J. Skovholt T. J. Carter D. L. Ziemann R. D. Silver R. M *. Diggs OGC RO (3)
M. Jinks J. Brentlinger, NARS
                                      ''i{;..
                                . *1:,,
                                *1:
i1 '
                                  .' *\~*
 
9.
UNITED STATES ATOMIC EN,ERGY COMMISSION WASHINGTON, D.C. 20545 October   26~ 1972 '
R. C. DeYoung, Assistant Director for PWR' s, L TURKEY POINT 3 - INITIAL CRITICALITY We were informed by our Region' II (Atlanta) Office that Turkey Point 3 achieved initi~l criticality at 10:03 p.m.
(EDT) on October 20, 1972. Our reactor inspector, who was at the site, reported that the f-pproach to criticality was conducted in a safe and orderly manner and that the reactor coolant boron concentration at criticality was in reasonably close agreement with the predicted value.
                                    ~ "'5,rd.£)~-
R. H. Engelken, Assistant Director for Inspection and Enforcement Directorate of Regulator)r Operations*
* cc:   E. J. Bloch, DDR
: s. H. Hanauer, DRTA F. E. Kruesi, RO
    \l* F. O'Leary, L E. G. Case, L A. Giambusso, L D. J. Skovholt, L R. s. Boyd, L R. L. Tedesco, L H. R. Denton, L D. F. Knuth, L R. R. Maccary, L D. R. Muller, L J. G. Keppler, RO K. Kniel, L P. s. Check, L
: w. c. Seidle, RO:II RO Regional Directors PDR Local PDR}}

Latest revision as of 12:21, 4 February 2020

Summary of Meeting with Commonwealth Edison Company on Reporting and Organization of Information - Dresden Units 2 and 3
ML17252A115
Person / Time
Site: Dresden, Turkey Point  Constellation icon.png
Issue date: 10/30/1972
From: Silver R
US Atomic Energy Commission (AEC)
To:
References
Download: ML17252A115 (3)


Text

~/* ¥f

~

- - ~"'!

OCT 3 'O 1972 Files (Dc;>cket ..No~. 50-237 THRU: D. L. Ziemann, Chief,

~ l-r2 -2, L ~ .

D.-/L. ~,._._,.~,..--.-...

MEETING WITH Cb);ONWEALTH EDISON COMPANY ON REPORTING AND ORGANiZ~TION ...

OF INFORMATION On October 6, 1972, a meeting was held in Bethesda with Connnonwealth Edison Company to discuss (1) plans for organizing information on Dresden 2 and 3 dockets (ref: ltr. to CEC dtd 7/18/72 and ltr. from CEC dtd 9/19/72) and (2) reporting of abnormal occurrences. Attending the meeting were:

R. Diggs, L:OR-2 Dell Butterfield, CEC R. Silver, L:OR-2 Bob Lemke, CEC (assigned to H. Hoyt)

J. Brentlinger, NARS Tom Tramm, CEC (assigned to B. Lee)

George Wagner, CEC (to be assigned ~o H. Hoyt)

The CE representatives agreed to develop a cumulative subject index to include all technical submittals including the SAR, amendments to.the SAR, technical specifications change applications, special operations reports and semiannual reports of modifications. The subject index will be based primarily on the SAR table of contents which_ will be_ expanded as necessary to .incorporate all relevant subject information by reference to document nu\llber, date and page thereof. The cumulative locater index will be revised semiannually and revised pages will be submitted' along with the semiannual report.. ' -

Regarding t~e contents of abnormal occurrence reports, CE plans to set up a review mechan,i$I,Tl. to_ assure that the discussions, especially of corrective actions, are complete arid that corrective actions at both Dresden Units and*

both Quad-Cities Units are discussed. (The Dresden plant superintendent can~ot discuss corrective actions at. Quad-Cities and visa versa and therefore a central review mechanism is necessary.)

The tentative plans.also call for*a central analysis of operating experience trends as part of the QA program. CE also has begun an error analysis pr_ogram.

The CE representatives stated that after an abnormal occurrence at one station, the nee,d for investigation. and corrective action at the other station is q.lways checked. CE agreed that whenever an abnormal occurrence involved the need for long term followup, the initial report would include a tentative date for submittal of 'the final report.

R. D. Silver .

Operating Reactors Branch #2 Directorate of Licensing cc: See next page

cc: D. J. Skovholt T. J. Carter D. L. Ziemann R. D. Silver R. M *. Diggs OGC RO (3)

M. Jinks J. Brentlinger, NARS

i{;..

. *1:,,

  • 1:

i1 '

.' *\~*

9.

UNITED STATES ATOMIC EN,ERGY COMMISSION WASHINGTON, D.C. 20545 October 26~ 1972 '

R. C. DeYoung, Assistant Director for PWR' s, L TURKEY POINT 3 - INITIAL CRITICALITY We were informed by our Region' II (Atlanta) Office that Turkey Point 3 achieved initi~l criticality at 10:03 p.m.

(EDT) on October 20, 1972. Our reactor inspector, who was at the site, reported that the f-pproach to criticality was conducted in a safe and orderly manner and that the reactor coolant boron concentration at criticality was in reasonably close agreement with the predicted value.

~ "'5,rd.£)~-

R. H. Engelken, Assistant Director for Inspection and Enforcement Directorate of Regulator)r Operations*

  • cc: E. J. Bloch, DDR
s. H. Hanauer, DRTA F. E. Kruesi, RO

\l* F. O'Leary, L E. G. Case, L A. Giambusso, L D. J. Skovholt, L R. s. Boyd, L R. L. Tedesco, L H. R. Denton, L D. F. Knuth, L R. R. Maccary, L D. R. Muller, L J. G. Keppler, RO K. Kniel, L P. s. Check, L

w. c. Seidle, RO:II RO Regional Directors PDR Local PDR