| issue date = 03/11/1983
| issue date = 03/11/1983
| title = Requests Extension to 830615 to Provide Addl Info Requested in Generic Ltr 82-28 Re Inadequate Core Cooling Instrumentation Sys.Summary of Previously Submitted Info Re Westinghouse Differential Pressure Monitoring Sys Encl
| title = Requests Extension to 830615 to Provide Addl Info Requested in Generic Ltr 82-28 Re Inadequate Core Cooling Instrumentation Sys.Summary of Previously Submitted Info Re Westinghouse Differential Pressure Monitoring Sys Encl
| author name = HERING R F
| author name = Hering R
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,AREGULAYINFORMATION DISTRIBUTI SYSTEM(RIDS)'AOCESSION NBR'8303280050 DOC~DATE:83/03/11NOTARIZED:
{{#Wiki_filter:,A REGULA    Y  INFORMATION DISTRIBUTI             SYSTEM   (RIDS)
NOFACIL:503i'5DonaldO~Cook<<Nuclear PowerPlantiUni.t1RIndianaL'503i6DonaldO.CookNuclearPowerPlantiUni,t2iIndiana8AUTH~NAME'UTHOR AFFIL-IAT.IONHERINGiR~F~Indiana8MichiganElectricCo,'IRBCI.P~NAME-RECIPIENT AFFILIATION OEhlTONiH
'AOCESSION NBR'8303280050                 DOC ~ DATE:   83/03/11      NOTARIZED:   NO          DOCKET FACIL:50 3i'5 Donald O ~ Cook<<Nuclear Power Pl anti Uni.t 1R Indiana                      L 05000315
~R.Office-ofNuclearReactorRegulationr,Director
            '50 3i6 Donald O. Cook Nuclear Power Planti Uni,t 2i Indiana                      8 05000316 AUTH ~ NAME'UTHOR AFF IL-IAT.ION HERINGi R ~ F ~         Indiana    8  Michigan      Electric    Co,
    'IRBCI.P ~ NAME-         RECIPIENT AFFILIATION OEhlTONiH ~ R.           Office- of Nuclear Reactor Regulationr,Director


==SUBJECT:==
==SUBJECT:==
Requestsextension;to 830615to;provide addiinfo<<requested inGenericL<<tr82"28re,'inadequate corecoolinginstrumentation
Requests        extension;to 830615 to;provide addi info <<requested in Gener ic L<<tr 82"28 re,'inadequate core cooling instr umentation <<sys;Summa< y of previously submitted info re Nestinghouse differential pressure- monijtor ing sys encl.
<<sys;Summa<
Dl'STRISUTION,CODE: A046S            COPIES "RECEIVED:LTR           ENCI- L    SIZE:.
yofpreviously submitted inforeNestinghouse differential pressure-monijtoringsysencl.Dl'STRISUTION,CODE:
TITLE:     OR  Submittal'. TMI  Action Plan .Rgqt        NUREG  0737 L NUREG-0660 NOTES!
A046SCOPIES"RECEIVED:LTR ENCI-LSIZE:.TITLE:ORSubmittal'.
RECIPIENT            COPIES                RECIPIENT            COPIES ID <<CODE/NAME         LTTR ENCL          -ID 'CODE/NAME       'LTTR ENCL NRR ORB1  BC  01                <<7 INTIERNAL: ELO/HDS3                          1      *0     'IE/DEPER DIR 33                1 IE/DEPER/EPB              ~
TMIActionPlan.RgqtNUREG0737LNUREG-0660 NOTES!DOCKET0500031505000316RECIPIENT ID<<CODE/NAME NRRORB1BC01COPIESLTTRENCL<<7RECIPIENT
3      3    ~
-ID'CODE/NAME COPIES'LTTRENCLINTIERNAL:
IE/DEPER/IRB             1    1 NRR PAWLSON,N            1    ~ 1      NRR/DHFS/DEPY29           1    1 NRR/DL DIR      10          1    .1      NRR/DL/ADL       16      1    1 NRR/DL/ADSA 17              1      1      NRR/OL/DRAB 18          "3    3 NRR/DSI/ADRS '27                    1      NRR/OS  I/AEB            1    1 I/RAB NRR/OSI/ASB
ELO/HDS3IE/DEPER/EPB NRRPAWLSON,N NRR/DLDIR10NRR/DL/ADSA 17NRR/DSI/ADRS
                .NRR/OST DIR RGN3 30 1
'27NRR/OSI/ASB
1 1
.NRR/OSTDIR30RGN31*0~331~11.11111~111111111111"33111=104,11'IE/DEPER DIR33~IE/DEPER/IRB NRR/DHFS/DEPY29 NRR/DL/ADL 16NRR/OL/DRAB 18NRR/OSI/AEBNRR/OSI/RABEXTERNAL:
                                                    ~ 1 1
ACRSI.PDRNSIC1010'NPOiJ;STARNES 0322NRC'PDR020511NTIS.1.11111<<TOTALNUMBEROF"COPIESREQUIRED:
1 NRR/OS 04,1    1    =1 1
l<<TTR44ENCLQ3 tttlt'1l>>w(wc' 0.INDIANARMICHIGANELECTRICCOMPANYP.O.8OX1880WLINGGREENSTATIONNEWYORK,N.Y.10004March11,1983AEP:NRC:0761 DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74INADEQUATE CORECOOLINGINSTRUMENTATION SYSTEM(GENERICLETTERNO.82-28)REQUESTFOREXTENSION Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
EXTERNAL: ACRS                            10      10    'NPOi J;STARNES             .1    .1 I.PDR          03          2      2      NRC 'PDR        02      1    1 NSIC            05          1      1      NTIS                      1    1
<<TOTAL NUMBER OF "COPIES REQUIRED:               l<<TTR    44    ENCL    Q3


==DearMr.Denton:==
tt tl t'1 l>> w( w c'
UponreceiptofGenericLetterNo.82-28,aninternalreviewwasestablished, inordertoprovidetherequested additional information concerning ourInadequate CoreCooling(ICC)Instrumen-tationSystem'sconformance
 
'withNUREG-0737, ItemII.F.2.Weare,however,presently unabletorespondtothisrequestintheformatoftheGenericLetter'sattachedchecklist.
0                            .
Theinability tocomplywiththe90-dayresponsetimearisesfromalackofavailable information concerning thefinalization ofthereplacement in-corethermocouple system'sdesign.AEPSCiscurrently negotiating withthreevendorsforthecontracttoreplaceexistingin-corethermocouple system.Additionally, ongoingdiscussions arebeingconducted withWestinghouse regardi'ng theReactorVesselLevelInstrumentation System's(RVLIS)calibration difficulties andequipment location.
INDIANA R MICHIGAN ELECTRIC COMPANY P. O. 8OX 18 80 WLING GR E EN ST ATION NEW YORK, N. Y. 10004 March 11, 1983 AEP:NRC:0761 Donald C. Cook Nuclear Plant Unit Nos.      1  and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INADEQUATE CORE COOLING INSTRUMENTATION SYSTEM (GENERIC LETTER NO. 82-28) REQUEST FOR EXTENSION Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Accordingly, weherebyrequestanextension toJune15,1983,sothatwemayappropriately addresstheconcernsofGenericLetterNo.82-28.Wewishtostatefortherecord,however,thattheWestinghouse differential pressuremonitoring system(RVLIS)isinstalled, intheDonaldC.CookNuclearPlanttoserveastherequiredreactorcoolantinventory trackingsystem.AsstatedinGenericLetterNo.82-28,theNRChascompleted itsgenericreviewoftheRVLISanddeemeditacceptable fortrackingreactorcoolantsysteminventory.
 
Thesubcooling marginmonitorsareinstalled andoperational.
==Dear Mr. Denton:==
Information regarding theRVLISandthesubcooling marginmonitorshaso~48303280050 8303iilFanAOOCK050003isI'iPPDRJl
 
'P*IKIhIJIJ\~lgg~eV...i,~rQ9gI/td(JI3~Jrai.>ia~wa~"Jiv'a~a~la~~a)~t~~
Upon    receipt of Generic Letter No. 82-28, an internal review was  established, in order to provide the requested additional information concerning our Inadequate Core Cooling (ICC) Instrumen-tation System's conformance 'with NUREG-0737, Item II.F.2. We are, however, presently unable to respond to this request in the format of the Generic Letter's attached checklist. The inability to comply with the 90-day response time arises from a lack of available information concerning the finalization of the replacement in-core thermocouple system's design. AEPSC is currently negotiating with three vendors for the contract to replace existing in-core thermocouple system.
Mr.HaroldR..onA.iRC:0761beenpreviously submitted totheNRCviavariouslettersassummarized inAttachments 1and2,ofthisletter.Weareintheprocessofconducting engineering studiesconcerning thein-corethermocouple systemforUnitl.Itiscurrently anticipated thattheinstallation ofthisnewthermocouple systemshouldcommenceduringthe1985refueling outage.Thisscheduleisbasedonananticipated oneyearleadtimefortheequipment.
Additionally, ongoing discussions are being conducted with Westinghouse regardi'ng the Reactor Vessel Level Instrumentation System's (RVLIS) calibration difficulties and equipment location. Accordingly, we hereby request an extension to June 15, 1983, so that we may appropriately address the concerns of Generic Letter No. 82-28.
Following Unit1'sinstallation aplanwillbedeveloped toinstallanewthermocouple systeminUnit2.Thisdocumenthasbeenpreparedfollowing corporate procedures whichincorporate areasonable setofcontrolstoinsureitsaccuracyandcompleteness priortosignature bytheundersigned.
We wish to state    for the record, however, that the Westinghouse  differential pressure monitoring system (RVLIS) is installed, in the Donald C. Cook Nuclear Plant to serve as the required reactor coolant inventory tracking system. As stated in Generic Letter No. 82-28, the NRC has completed its generic review of the RVLIS and deemed it acceptable for tracking reactor coolant system inventory.
Verytrulyyours,/osR.F.HeringVicePresident cc:JohnE.Dolan-ColumbusR.S.HunterM.P.AlexichR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffNRCResidentInspector atCookPlant-Bridgman Attachment 1toAEP:NRC:0761 Thefollowing submittals havebeentransmitted byAEPorbyWestinghouse ElectricCompany(W)totheNRCinsupportoftheRVLISdesign.'a)
The  subcooling margin monitors are installed and operational.
LetterNo.AEP:NRC:0398D, datedMarch311981Thisletterservedtotransmitaversionofthe"SummaryReport,Westinghouse ReactorVesselLevelInstrumentation SystemforMonitoring Inadequate CoreCooling(7300System),December, 1980",whichisapplicable totheDonaldC.CookNuclearPlant.(b)LetterNos.AEP:NRC:0398F andAEP:NRC:0398G, datedSetember171981andNovember20,1981respectively Theselettersresponded toMr.S.A.Varga'sletterofAugust8,1981whichrequested additional information ontheWestinghouse SummaryReportontheRVLIS.(c)Sulementary Information Submittal letterfromMr.E.P.Rahe(W)toMr.L.E.Phillips(NRC)NS-EPR-2579 ofMarch19,1982.(d)'WestinhouseEvaluation ofTestsMr.E.P.Rahe's(W)lettertoMr.L.E.Phillips(NRC)NS-EPR-2526 ofDecember9,1981providedtheresultsoftestsS-UT-3,S-UT-6,S-UT-7,S-NC-2,S-NC-3,andS-NC-8,whichsupporttheevaluation oftheRVLISdesign.(e)WestinhouseEvaluation ofTestsS-UT-8LetterfromMr.E.P.Rahe(W)toMr.L.E.Phillips(NRC),NS-EPR-2542 ofJanuary13,1982.(f)Westinghouse Evaluat'ion ofTestS-1B-1andFunctional TestLetterfromMr.E.P.Rahe(QWtoMr.L.E.Phillips(NRC),SED-SA-0081 ofJune28,1982.(g)ResponsetoReuesttoWOGforAdditional Information LetterfromMr.E.P.Rahe(W)toMr.DennisM.Crutchfield (NRC),NS-EPR-2597 ofMay14,1982.  
Information regarding the RVLIS and the subcooling margin monitors has o~4 8303280050  8303ii l
(h)RCSMi.deRangePressureInstrumentation rLetterfromMr.E.P.Rahe(W)toMr.R.C.Young(NRC),NS-EPR-2586 ofApril21,1982.
'i Fan AOOCK 050003is P                        I PDR  Jl
Attachment 2toAEP:NRC:0761 Thcfollowing submittals havebeentransmitted totheNRCin-supportofthesubcooling marginmonitordesign..(a)LetterNo.AEP:NRC:0253 datedOctober241979ThisletterservedtonotifytheNRCofourintention toinstallsubcooling marginmonitorsandofourinterimmethodofdetermining subcooling margin.(b)LetterNo.AEP:NRC:0253A, datedNovember26,1979Thisletterresponded toanNRCrequestforadditional information onthesubcooling marginmonitorcontained inMr.HaroldR.Denton'sletterofOctober30,1979.(c)LetterNo.AEP:NRC:0253B, datedDecember191979Thisletterprovidesadescription oftheplantparameters employedtocalculate subcooling marginariththeProdacplantcomputer, anddisplayoptionsavailable.
 
(d)LetterNo.AEP:NRC:0334 datedJanuary181980Thisletterdetailsourcompliance withNUREG-0578 Section2.1.3.b,"Instrumentation forInadequate CoreCooling".
                                                                  'P K
(e)LetterNo.AEP:NRC:0334B, datedMarch101980Thisletterprovidesadescription ofthesubcooling marginmonitorinputprocessing employedtocalculate thesubcooling margin.Thequalification ofthesubcooling marginmonitorcomponents isalsoaddressed.
* I Ih IJ  IJ      \               ~lg g  ~ eV         ...i , rQ
(f)LetterNo.AEP:NRC:0346 datedJanuary30,1980Thisletterprovidesthesubcooling margincriteriaforthetermination ofsafetyinjection.
                                                          ~
TheNRCreviewdetermined thatthesaturation marginmonitorsmeettheshorttermlessonslearnedrequirements forSection2.1.3.bofNUREG-0578.
9  gI  /       td(J    I3  ~J r ai . >i a ~ wa ~ "J i v'           a ~ a ~ la ~ ~ a )~   t~ ~
ThesummaryofthisreviewisincludedinaletterfromMr.A.Schwencer toMr.J.Dolan(AEP)datedMarch20,1980.  
 
~Y'gpJ,Itt}}
Mr. Harold  R.. on                          A . i RC:0761 been  previously submitted to the NRC via various letters as summarized in Attachments  1 and 2, of this letter.
We are in the process of conducting engineering studies concerning the in-core thermocouple system for Unit l. It is currently anticipated that the installation of this new thermocouple system should commence during the 1985 refueling outage. This schedule is based on an anticipated one year lead time for the equipment.
Following Unit 1's installation a plan will be developed to install a new thermocouple system in Unit 2.
This document has been prepared following corporate procedures which incorporate a reasonable set of controls to insure    its accuracy and completeness prior to signature by the undersigned.
Very truly yours, R. F. Hering
    /os                                        Vice President cc:   John E. Dolan Columbus R. S. Hunter M. P. Alexich R. W. Jurgensen W. G. Smith, Jr. Bridgman R. C. Callen G. Charnoff NRC Resident Inspector at Cook  Plant  Bridgman
 
Attachment   1 to AEP:NRC:0761 The  following submittals have been transmitted by AEP or by Westinghouse  Electric  Company (W) to the NRC in support of the RVLIS design.'a)
Letter  No. AEP:NRC:0398D, dated March 31        1981 This letter served to transmit a version of the "Summary Report, Westinghouse Reactor Vessel Level Instrumentation System for Monitoring Inadequate Core Cooling (7300 System),
December, 1980", which is applicable to the Donald C. Cook Nuclear Plant.
(b) Letter  Nos. AEP:NRC:0398F and AEP:NRC:0398G, dated Se tember 17  1981 and November 20, 1981 respectively These  letters    responded to Mr. S. A. Varga's letter of August 8, 1981 which    requested additional information on the Westinghouse Summary Report on the RVLIS.
(c) Su  lementary Information Submittal   letter  from Mr. E. P. Rahe   (W) to Mr. L. E.
Phillips   (NRC) NS-EPR-2579   of  March 19, 1982.
(d) 'Westin house Evaluation of Tests Mr. E. P. Rahe's     (W) letter  to Mr. L. E. Phillips (NRC)
NS-EPR-2526   of  December 9, 1981    provided the results of tests S-UT-3, S-UT-6, S-UT-7, S-NC-2, S-NC-3, and S-NC-8, which support the evaluation of the RVLIS design.
(e) Westin house Evaluation of Tests S-UT-8 Letter from Mr. E. P. Rahe       (W) to Mr. L. E. Phillips (NRC),
NS-EPR-2542   of January 13,   1982.
(f) Westinghouse Evaluat'ion     of Test  S-1B-1 and Functional Test Letter from Mr. E. P. Rahe       (QW  to Mr. L. E. Phillips (NRC),
SED-SA-0081 of June 28, 1982.
(g) Response  to  Re  uest to  WOG  for Additional Information Letter from Mr. E. P. Rahe (W) to Mr. Dennis M.     Crutchfield (NRC), NS-EPR-2597 of May 14, 1982.
 
(h) RCS Mi.de Range Pressure Instrumentation      r Letter from  Mr. E. P. Rahe (W) to Mr. R. C. Young (NRC),
NS-EPR-2586 of April 21, 1982.
 
Attachment 2  to AEP:NRC:0761 Thc  following submittals have been transmitted to the      NRC  in support of the subcooling margin monitor design.
      . (a) Letter  No. AEP:NRC:0253   dated October  24  1979 This  letter served to notify the NRC of our intention      to install subcooling margin monitors and of our interim      method of determining subcooling margin.
(b) Letter  No. AEP:NRC:0253A, dated November 26, 1979 This  letter responded to an NRC request for additional information on the subcooling margin monitor contained in Mr.
Harold R. Denton's letter of October 30, 1979.
(c) Letter  No. AEP:NRC:0253B, dated December 19      1979 This  letter provides  a description of the plant parameters employed to  calculate subcooling margin arith the Prodac plant computer, and display options available.
(d) Letter  No. AEP:NRC:0334   dated January 18    1980 This  letter details our compliance with    NUREG-0578   Section 2.1.3.b, "Instrumentation for Inadequate      Core  Cooling".
(e) Letter  No. AEP:NRC:0334B, dated March 10      1980 This letter provides a description of the subcooling margin monitor input processing employed to calculate the subcooling margin. The qualification of the subcooling margin monitor components is also addressed.
(f) Letter No. AEP:NRC:0346     dated January 30, 1980 This letter provides the    subcooling margin  criteria for  the termination of safety injection.
The NRC review determined    that the saturation margin monitors meet the short term lessons  learned requirements for Section 2.1.3.b of NUREG-0578. The summary of this review is included in a letter from Mr. A. Schwencer to Mr. J. Dolan (AEP) dated March 20, 1980.
 
        ~ Y'g p J
,I tt}}

Latest revision as of 02:43, 4 February 2020

Requests Extension to 830615 to Provide Addl Info Requested in Generic Ltr 82-28 Re Inadequate Core Cooling Instrumentation Sys.Summary of Previously Submitted Info Re Westinghouse Differential Pressure Monitoring Sys Encl
ML17320A441
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/11/1983
From: Hering R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.2, TASK-TM AEP:NRC:0761, AEP:NRC:761, GL-82-28, NUDOCS 8303280050
Download: ML17320A441 (9)


Text

,A REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

'AOCESSION NBR'8303280050 DOC ~ DATE: 83/03/11 NOTARIZED: NO DOCKET FACIL:50 3i'5 Donald O ~ Cook<<Nuclear Power Pl anti Uni.t 1R Indiana L 05000315

'50 3i6 Donald O. Cook Nuclear Power Planti Uni,t 2i Indiana 8 05000316 AUTH ~ NAME'UTHOR AFF IL-IAT.ION HERINGi R ~ F ~ Indiana 8 Michigan Electric Co,

'IRBCI.P ~ NAME- RECIPIENT AFFILIATION OEhlTONiH ~ R. Office- of Nuclear Reactor Regulationr,Director

SUBJECT:

Requests extension;to 830615 to;provide addi info <<requested in Gener ic L<<tr 82"28 re,'inadequate core cooling instr umentation <<sys;Summa< y of previously submitted info re Nestinghouse differential pressure- monijtor ing sys encl.

Dl'STRISUTION,CODE: A046S COPIES "RECEIVED:LTR ENCI- L SIZE:.

TITLE: OR Submittal'. TMI Action Plan .Rgqt NUREG 0737 L NUREG-0660 NOTES!

RECIPIENT COPIES RECIPIENT COPIES ID <<CODE/NAME LTTR ENCL -ID 'CODE/NAME 'LTTR ENCL NRR ORB1 BC 01 <<7 INTIERNAL: ELO/HDS3 1 *0 'IE/DEPER DIR 33 1 IE/DEPER/EPB ~

3 3 ~

IE/DEPER/IRB 1 1 NRR PAWLSON,N 1 ~ 1 NRR/DHFS/DEPY29 1 1 NRR/DL DIR 10 1 .1 NRR/DL/ADL 16 1 1 NRR/DL/ADSA 17 1 1 NRR/OL/DRAB 18 "3 3 NRR/DSI/ADRS '27 1 NRR/OS I/AEB 1 1 I/RAB NRR/OSI/ASB

.NRR/OST DIR RGN3 30 1

1 1

~ 1 1

1 NRR/OS 04,1 1 =1 1

EXTERNAL: ACRS 10 10 'NPOi J;STARNES .1 .1 I.PDR 03 2 2 NRC 'PDR 02 1 1 NSIC 05 1 1 NTIS 1 1

<<TOTAL NUMBER OF "COPIES REQUIRED: l<<TTR 44 ENCL Q3

tt tl t'1 l>> w( w c'

0 .

INDIANA R MICHIGAN ELECTRIC COMPANY P. O. 8OX 18 80 WLING GR E EN ST ATION NEW YORK, N. Y. 10004 March 11, 1983 AEP:NRC:0761 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INADEQUATE CORE COOLING INSTRUMENTATION SYSTEM (GENERIC LETTER NO. 82-28) REQUEST FOR EXTENSION Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Upon receipt of Generic Letter No. 82-28, an internal review was established, in order to provide the requested additional information concerning our Inadequate Core Cooling (ICC) Instrumen-tation System's conformance 'with NUREG-0737, Item II.F.2. We are, however, presently unable to respond to this request in the format of the Generic Letter's attached checklist. The inability to comply with the 90-day response time arises from a lack of available information concerning the finalization of the replacement in-core thermocouple system's design. AEPSC is currently negotiating with three vendors for the contract to replace existing in-core thermocouple system.

Additionally, ongoing discussions are being conducted with Westinghouse regardi'ng the Reactor Vessel Level Instrumentation System's (RVLIS) calibration difficulties and equipment location. Accordingly, we hereby request an extension to June 15, 1983, so that we may appropriately address the concerns of Generic Letter No. 82-28.

We wish to state for the record, however, that the Westinghouse differential pressure monitoring system (RVLIS) is installed, in the Donald C. Cook Nuclear Plant to serve as the required reactor coolant inventory tracking system. As stated in Generic Letter No. 82-28, the NRC has completed its generic review of the RVLIS and deemed it acceptable for tracking reactor coolant system inventory.

The subcooling margin monitors are installed and operational.

Information regarding the RVLIS and the subcooling margin monitors has o~4 8303280050 8303ii l

'i Fan AOOCK 050003is P I PDR Jl

'P K

  • I Ih IJ IJ \ ~lg g ~ eV ...i , rQ

~

9 gI / td(J I3 ~J r ai . >i a ~ wa ~ "J i v' a ~ a ~ la ~ ~ a )~ t~ ~

Mr. Harold R.. on A . i RC:0761 been previously submitted to the NRC via various letters as summarized in Attachments 1 and 2, of this letter.

We are in the process of conducting engineering studies concerning the in-core thermocouple system for Unit l. It is currently anticipated that the installation of this new thermocouple system should commence during the 1985 refueling outage. This schedule is based on an anticipated one year lead time for the equipment.

Following Unit 1's installation a plan will be developed to install a new thermocouple system in Unit 2.

This document has been prepared following corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, R. F. Hering

/os Vice President cc: John E. Dolan Columbus R. S. Hunter M. P. Alexich R. W. Jurgensen W. G. Smith, Jr. Bridgman R. C. Callen G. Charnoff NRC Resident Inspector at Cook Plant Bridgman

Attachment 1 to AEP:NRC:0761 The following submittals have been transmitted by AEP or by Westinghouse Electric Company (W) to the NRC in support of the RVLIS design.'a)

Letter No. AEP:NRC:0398D, dated March 31 1981 This letter served to transmit a version of the "Summary Report, Westinghouse Reactor Vessel Level Instrumentation System for Monitoring Inadequate Core Cooling (7300 System),

December, 1980", which is applicable to the Donald C. Cook Nuclear Plant.

(b) Letter Nos. AEP:NRC:0398F and AEP:NRC:0398G, dated Se tember 17 1981 and November 20, 1981 respectively These letters responded to Mr. S. A. Varga's letter of August 8, 1981 which requested additional information on the Westinghouse Summary Report on the RVLIS.

(c) Su lementary Information Submittal letter from Mr. E. P. Rahe (W) to Mr. L. E.

Phillips (NRC) NS-EPR-2579 of March 19, 1982.

(d) 'Westin house Evaluation of Tests Mr. E. P. Rahe's (W) letter to Mr. L. E. Phillips (NRC)

NS-EPR-2526 of December 9, 1981 provided the results of tests S-UT-3, S-UT-6, S-UT-7, S-NC-2, S-NC-3, and S-NC-8, which support the evaluation of the RVLIS design.

(e) Westin house Evaluation of Tests S-UT-8 Letter from Mr. E. P. Rahe (W) to Mr. L. E. Phillips (NRC),

NS-EPR-2542 of January 13, 1982.

(f) Westinghouse Evaluat'ion of Test S-1B-1 and Functional Test Letter from Mr. E. P. Rahe (QW to Mr. L. E. Phillips (NRC),

SED-SA-0081 of June 28, 1982.

(g) Response to Re uest to WOG for Additional Information Letter from Mr. E. P. Rahe (W) to Mr. Dennis M. Crutchfield (NRC), NS-EPR-2597 of May 14, 1982.

(h) RCS Mi.de Range Pressure Instrumentation r Letter from Mr. E. P. Rahe (W) to Mr. R. C. Young (NRC),

NS-EPR-2586 of April 21, 1982.

Attachment 2 to AEP:NRC:0761 Thc following submittals have been transmitted to the NRC in support of the subcooling margin monitor design.

. (a) Letter No. AEP:NRC:0253 dated October 24 1979 This letter served to notify the NRC of our intention to install subcooling margin monitors and of our interim method of determining subcooling margin.

(b) Letter No. AEP:NRC:0253A, dated November 26, 1979 This letter responded to an NRC request for additional information on the subcooling margin monitor contained in Mr.

Harold R. Denton's letter of October 30, 1979.

(c) Letter No. AEP:NRC:0253B, dated December 19 1979 This letter provides a description of the plant parameters employed to calculate subcooling margin arith the Prodac plant computer, and display options available.

(d) Letter No. AEP:NRC:0334 dated January 18 1980 This letter details our compliance with NUREG-0578 Section 2.1.3.b, "Instrumentation for Inadequate Core Cooling".

(e) Letter No. AEP:NRC:0334B, dated March 10 1980 This letter provides a description of the subcooling margin monitor input processing employed to calculate the subcooling margin. The qualification of the subcooling margin monitor components is also addressed.

(f) Letter No. AEP:NRC:0346 dated January 30, 1980 This letter provides the subcooling margin criteria for the termination of safety injection.

The NRC review determined that the saturation margin monitors meet the short term lessons learned requirements for Section 2.1.3.b of NUREG-0578. The summary of this review is included in a letter from Mr. A. Schwencer to Mr. J. Dolan (AEP) dated March 20, 1980.