ML18022A438: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/01/1986
| issue date = 10/01/1986
| title = Forwards Addl Info Re Emergency Operating Procedures in Response to Audit Conducted on 860710 & 11.Encl Responses Satisfy Util Commitments Re Training Program Documented in 860929 Ltr & 860814 Meeting
| title = Forwards Addl Info Re Emergency Operating Procedures in Response to Audit Conducted on 860710 & 11.Encl Responses Satisfy Util Commitments Re Training Program Documented in 860929 Ltr & 860814 Meeting
| author name = ZIMMERMAN S R
| author name = Zimmerman S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~
REGULA,  Y INFORNATION      DIBTRIBUTI        YSTEN  (RIDS)
ACCESS/ON NBR: Sb10090482 FACIL; 50-400 Shearon DQC. DATE:    Sb/10/01 Harris Nuclear Power Planti Unit NOTARIZED:
ii NQ, Carolina DOCKET 0 05000400 AUTH. NANE            AUTHOR AFFILIATION ZINNERNANe B. R.      Carolina Power  Cc    Light Co.
RECIP. NANE          RECIPIENT AFFILIATION DENTONi H. R.        Office of Nuclear Reactor Regulationi" Director (post 851125
 
==SUBJECT:==
Forwards addi inFo re emergency operating procedures in response to audit conducted on Sb0710            Ze 11. Encl responses satisfy util commitments re training program documented in Bb0929  ltr 5  Sb0814 meeting.
DISTRIBUTION CODE: AOOSD      COPIEB RECEIVED: LTR TITLE: QR/Licensing Submittal: Suppl          1 t  ENCL  J BIIE:
to NUREG-0737(Generic Ltr 82-33)
NOTES: Application for permit renewal filed.                                      05000400 I
REC IP ENT        COPIES                RECIPIENT            COPIES ID CODE/NANE      LTTR ENCL            ID CODE/NANE        LTTR ENCL PWR-A ADTS                1    1        PWR-A  EB                      1 PWR-A EICSB              2    2        PWR-A  FQB              1 PWR-A PD2 LA              1    1        PWR-A  PD2 PD            7    7 BUCKLEY, B                1    i.      PWR-A  PBB                    1 PWR-A RBB.              '1 E
INTERNAL: ADN/LFNB                        0        IE/DEPER/EPB            3    3 NRR BWR ADTS              1              NRR PAULSONe,'W          1    1 NRR PWR-B ADTS          '1      1        NRR/DSRO ENRIT                1 1    1        NRR/DSRO/RSIB            1    1 REG  FILES              1    1        RGN2                    1    1 EXTERNAL: LPDR                        1    1        NRC PDR                  1    1 NSIC                      1    1 TOTAL NUNBER OF COPIES REQUIRED'TTR                31  ENCL    30
 
s''  Cf
                                    !  It  "I ir, h
f 0                  ll Ql    '1                        I Itch t ~ '          I I th
                        ! hf                                                                                                          ll        II tJ I
C  h lf t j    h ti I  hJ  476                                                                                                          h h
h'h<<h                  h        Pt
                                                                                                          'k  h
                                                                                                                            , h
                                                                                                                                ~ lk kt I tt        I b It                                        >>I I,    'E) h  '$ ~ h)                                              ,"h      $ f'h,      ~
it,, h, h
f '"                                                      1  I', b  t~ll                                    II    I"            C          "~,', I  ~ ~
f h'hlh!      g                                                                                                                                              h I'"
      '4h lhthh h>>
h
                                                                                                                                                            )            'I            J b)hCl I<<                          p   
                                                                '                      h t I
                                                                                                                                                                            ',,  lt I~
ph)                                                                ~
                                                                                                                                                                                $ I 44
                                                                                                                                                            <<I'hi hh <<h C.l,'lt        4 ~ kl t'It h) $ h ii) ht j
 
                                                @ME, Carolina Power 8 Light Company SERIAL: NLS-86-379 SENT      zm Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC      20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-000 EMERGENCY OPERATING PROCEDURES
 
==Dear Mr. Denton:==
 
Carolina Power R Light Company (CPRL) hereby submits additional information concerning the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Operating Procedures. The attached information (Enclosure 1) is provided in response to NRC concerns identified during an audit of the SHNPP Emergency Operating Procedures conducted on 3uly 10 and 11, 1986. Resolution of these concerns was discussed in a subsequent meeting with the NRC on August 10, 1986. The attached responses satisfy CPRL's commitments concerning the training program documented in CPdcL letter dated August 29, 1986 and discussed in the August 10, 1986 meeting.
Several of the NRC's concerns relate to the Procedures Generation Package (PCP). It should be noted, however, that the PCP is not the governing document for licensed operator training at SHNPP. Plant Training Instructions and the SHNPP FSAR provide the training requirements for operators. Emergency Operating Procedure training and evaluation have always been a requirement of these documents. The PCP will be revised to cover the NRC's comments, but it should be recognized that the Training Instructions and the FSAR remain the controlling documents.
  ,If you have any questions    on this subject or require additional information, please contact me at (919) 836-6202 Yours very truly,
                                                                  . R. Zi merman ager Nuclear Licensing Section 3HE/mf      (50193DK)
Enclosure CC:    Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Dr. 3. Nelson Grace (NRC-RII)
Sbi00904S2        Sb100 PDR    *DOCK 05000400 F                        PDR 411 Fayettevilte Street o P. O. Box 155'1 o Raleigh, N, C. 27602
 
~ >
W' I
 
ENCLOSURE 1 Concern IA Certain plant-specific information which is called for in the Westinghouse ERG's has not yet been provided in the Harris EOPs. The applicant should perform a systematic review of training to assure that the information that    is missing  has been included  in the training program. Evidence that current operators have all of the required      skills and knowledge necessary to implement the EOPs should be documented      for NRC  review.
~Res oese A  systematic review of the SHNPP EOP network and training to support the EOP  network has been completed'ttachment 1 is a WOG/SHNPP Step Matrix identifying where, plant, specific information was not provided. , "Emergency Procedures and Task Training Matrix" provides documentation as to where training to support the "deleted plant specific information" was- conducted. The matrix includes both the Cold License Training Program which has been completed and the Hot License Training Program which will be conducted beginning in mid 1987. The materials to support the Hot License Training Program are presently under development and are scheduled to be completed by mid 1987.
In our  letter of August 29, 1986, CP&L committed to complete additional training and/or EOP revision to ensure operator skill in using the EOPs prior to fuel load. Attachment 2 shows that training on plant specific information required to execute Emergency Operating Procedures is adequately provided in Cold License System Training, Continuing Training (1985), 'and Prelicense Review Training. CP&L considers the current status of EOPs and training to be adequate to ensure operator skill in using the EOPs. The commitments'.in Attachment 1 to revise the procedures are'enhancements to the training that has already been provided, and are not necessary prior to fuel load. These revisions will be completed by December 12, 1986 along with the human factors update as committed to in our August 29, 1986 letter.
Three tasks have been    identified for  which additional training will be provided. These tasks are considered  to be minor items and are listed  in . This training will be incorporated in the Licensed Requalification Program and completed by December 31, '1986. also shows that training on the deleted plant specific information is covered by the various portions of the Hot License Training Program. Specifically the Hot License EOP Training will include step-by-step discussion of each procedure and bases for each step.
Additionally, the EOPs will be fully exercised during the simulator portion of the Hot License Training.
 
r it l<t I
+](
A t+
 
Evidence that current operators have        all  the required skills and knowledge necessary to implement the        EOPs  is provided by the following:
: 1. The  NRC  licenses each operator. The licensing process  includes a written exam, simulator exam, and a plant oral walk-through.      Each exam relates in part to the emergency operating procedures. Successful completion of the exam provides adequate evidence that the operator is capable of utilizing the Emergency Operating Procedures.
: 2. Prior to the    NRC  exam, CP&L administers an NRC-style written, simulator    and plant oral walk-through exam to ensure that the operators are well prepared to operate safely and are ready to be licensed by the NRC.
3~    During, the simulator training program (approximately 9 weeks for Cold License) the students are evaluated on their performance.      The scenarios include normal operations, off"normal operations, and emergency operating procedures. The scenarios have single and multiple failures included. Three examples of simulator scenarios are provided as Attachment 4.
: 4. Written  exams  are given throughout the classroom training  phases. These exams also include emergency operating procedures.
    ;5. NRC  Region-II conducted an Operational, Readiness Inspection during June, 1986. The training program
    '"" 'for"'Cold  License was reviewed and    it was determined that the training program was satisfactory with only minor inspector follow-up items.
: 6. As  indicated  by the  matrix,  all  EOPs were reviewed by Cold License Candidates      in either the Continuing Training Program or Pre-license Review. This training included a step-by-step discussion of the EOP's and the bases    for the steps.
I
: 7. The  training  program  for  Cold License meets or exceeds regulatory requirements.
Concern 1B:
Develop or provide evidence of a training program that systematically assures that information gaps in flowcharts and textual procedures are addressed speci'fically during future training, the program should include development of standards for the evaluation of task-level performance so that the applicant can identify whether all operators possess the appropr'iate enabling skills and knowledge to implement the"EOPs.
 
            ~  7 f  )
1%C g sp gA'
 
      ~Res  onse As  stated in response in IA above, Attachment 2 is provided showing the task listing for the Hot License Training Program. Also, as stated in IA
                                                                ~
response above, the programiis under development and will be completed prior to conducting Hot License Training for future operators. The program is based on an INPO job task analysis.      Attachment 2 will also be used to ensure that items referenced as training required for the usage of the EOPs will be included in the Hot License Program.
Evaluation of the operators to ensure they possess the appropriate skills and knowledge    to implement the EOPs, will be similar to the Cold License Training Program which is: 1) written exams during classroom training 2) evaluation during simulator exercis'es 3) CPSL (NRC style) written, simulator,. and.plant oral-,walk~through exams prior to the NRC licensing exams; 4) NRC licensed operatorexams which include written, simulator, and plant oral. walk-through. Tasks identified by the INPO task analysis are to be incorporated into the simulator scenarios now in development.
The operators will be evaluated'individually on each task.      The simulator exercise guides will reference the tasks and include the criteria for evaluation. Unsatisfactory performance of an evolution requires a repeat of that particular scenario.
Training conducted. during the Cold License Training Program Continuing Training and Pre-license Review Training was based on present emergency operating procedures. As changes are made to EOPs they are formally factored into the training program (Refer to Response to Comment 2 for discussion of process).
","..sEncLosures~4    DetailedComments. (Trainin  Pro ram)
Comment    1:
The  extensive use of flowcharts in the EOPs as described in the writer' guide reduces the amount of information that procedures can provide to operators. The training program must compensate for this lack of written information, i.e., the operators knowledge of plant. procedures must be greater. A training program description must be provided which specifically describes how the training program will maintain the high level of operator knowledge necessary for-"the use of flowchart EOPs.
This program description should address training program for EOPs distinct from training on other plant operating procedures.
      ~Res  onse
  .. Plant Training Instruction 200 (TI-200), "Licensed Operator Requalification Program", maintains operator knowledge of the EOPs through three portions of the program. The "On-The-Job Training" portion "requires that the EOPs be reviewed quarterly by each operator.
Additionally, the "Formal Classroom Lectures" portion includes a session
      ,on .Emergency Operating Procedures. Finally, the simulator portion requires sixty-four (64) hours of simulator training each year for each
 
j ~ 7 f
4
          ~
r I n ~)4
'I ~g sQ 1i ~,
 
licensed operator. Exercising the EOPs and ensuring operators can utilize    the procedures is a major part of the simulator requalification training program. A review of the EOPs, with emphasis on the plant specific information required is scheduled for the lecture portion of the Requalification    Program for 1986.
In order to ensure adequate operator knowledge, TI-200 requires that the following be performed as a part of the requalification training program'. 1) Operators will be evaluated during simulator training as to their ability to implement EOPs 2) CPSL will administer annual NRC-style written requalification exams, simulator exams, and plant oral walk-throughs. Additionally, the NRC may examine selected operators yearly in conjunction with the requalification program.
.Comment 2:
The  PGP "should describe a program of retraining to be used in the event of revision of EOPs, including explicit designation. of how the need to retrain is to be determined (e.g., assignment of an individual to monitor revisions and retraining).
~Res ense:
Plant" Training'Instruction 901A, "Dissemenation of Training Related Information" describes the mechanism for review of revisions to plant procedures and EOPs. The instruction gives guidance for review of revisions and provides a tracking mechanism to ensure that the appropriate changes are included into training materials and training is conducted as appropriate.      The Harris Training Unit assigns individuals as Subject,Matter Expertseto review the material.. The material is then routed as appropriate and tracked to ensure that the required training is completed. As described in the response to Comment 1 of Enclosure 4, Plant Training Instruction TI-200 "License Operator Requalification Program" requires that the EOPs be reviewed, and exercised on the simulator as a part of the training program on a continuing cycle with emphasis    on any changes.
Additionally, On-Site Nuclear Safety (ONS) reviews reports (LERs, SOERS, etc.) concerning operational incidents at. SHNPP and other plants. ONS makes recommendations as to inclusion of the information into training.
HTU is a member of the ONS review group.      The PGP will be reviewed and submitted to the NRC by April 15, 1987.
Comment 3A:
Although. the PGP states that a simulator will be used for operator training, the training program description should be expanded to address the following:
Discuss the method to be used to train the operators in areas where, the simulator is not like the control room or does not react like the plant, and in parts of the EOPs that can not be run on the simulator.
 
1 II r
 
      ~Res  onse:
A  lesson plan    titled "Simulator Differences" is    used in simulator training programs.      If parts of the  EOPs  can not be run on the simulator, they are discussed as"part of      the lesson plan or critiqued at the end of the exercise. ANSI/ANS 3.5 Section 3.1 dated 1981 requires that the simulator respond the same as the plant. The requirement goes into effect 18 months after the plant is in commercial operation. Until that time,  if  the simulator responds differently (now or once the plant is on line) the-differences will be discussed in the "Simulator Differences" lesson plan.
Comment 3B:
  .,  Indicate the use of a wide, variety of, scenarios including mutliple (simultaneous and .sequential) failures, to fully. exercise the EOPs on the simulator and thus expose the operators "to a wide variety of EOP uses.
    .~Res  onse Attached are three (3) scenarios (including evaluation check sheets) indicating the use of a wide variety of scenarios including multiple (simultaneous and sequential) failures. This is only a sampling of the large number of scenarios that, we utilize in the simulator training program. The scenarios are from the Cold License Training Program that was conducted for the presently licensed operators.
Comment    4:
..".,The PGP."should. include. a -commitment;,to..train every, operator on .every EOP prior to    EOP 'implementation in the control room.
      ~Res  onse The  presently licensed operators have been trained on all EOPs in the classroom and have been evaluated on simulator scenarios fully exercising the EOPs. The EOP review to be conducted in the 1986 Requalification Program will include training on changes and the EOP User's Guide. For future licensed operator training programs the operators will also be trained on all EOPs and have simulator training fully implementing the EOP procedures.      The PGP will be revised to include comment 4 prior to startup following the first refueling outage as requested.
Comment    5:
The    training program should indicate that operators will perform their assigned roles 'during training and that operators will be trained as teams.
 
q)s~
L I i      V
 
~Res onse:
Plant Training Instructions, TI-201, "Reactor Operator Replacement Training Program", TI-202, "Senior Reactor Operator Replacement Training Program" and TI-200, "License Operator Requalification Program'        AI 26R "Simulator Training", emphasize simulator training both in the team concept and in the individual role. Operators are evaluated during simulator exercises as a team as well as individual roles.
Comment 6:
The  PGP  should indicate that operators  will be evaluated  after training and  that  all  operators will be evaluated.
~Res onse:
'As the  part of the training program, operators are evaluated by written exams  during'classroom training and during the simulator training they are evaluated on the exercises conducted. Unsatisfactory simulator evaluations require a repeat of the scenario. Prior to being licensed by the NRC, CP&L conducts NRC-style written, simulator, and plant oral walk-through exams to ensure that the operators possess the required knowledge to be licensed operators. The NRC provides written, simulator and plant oral walk-through exams to the operator prior to issuing individual licenses. Plant Training Instructions TI-200 "Licensed Operator Requalification Program, TI-201 "Reactor Operator Replacement Training Program", and TI-202 "Senior Reactor Operator Replacement Training Program" require that these evaluations be conducted.      The requirement to evaluate operators will be added to the PGP by April 15, 1987.
 
i I
                              .1 J ~ t -t* 'PP4' 1" fll, i, I h
t    u r
V'
 
Attachment  1
                                                          - NG/SOPP Step Natrix Task                CMments E-O,RM) 36a                            GI,RNO 47a1)                            10    Procedure  will be revised to E-I,RN  11a                                                                    13    indicate  how to verify proper'oading.
Try to restore offsite power to ac      Try to restore  offsite power to  ac emergency busses. IF offsite power  emergency busses. Verify EDGs can NOT be restored, THEN load the      proper ly loaded following equipment on ac emergency busses:
IEnter plant  specific  list) ~
E-3.RN  11                            G2,RNO 19                              10    Procedure    will be revised to 13    indicate  how to verify proper Try to restore    offsite  power. IF    Verify the following:                          loadina.
necessary,    THEN  manually load the following equipment on the ac          1)    EDG properly loaded emergency busses:
: 2)    Turbine  X lube oil puaps-
[Enter plant specific    list].            RUNNI%
: 3)    Turbine seal  oil backup puap-RUQ41%
: 4)    Instrument  air  cm4x essors-
                                            'MI%
E-1,12a                                G1,66a                                        PATH GUIIE    will be  revised to include  list of required items.
Verify cold leg recirculatim            RHR  system  - CAPABLE CF COLD LEG capability:                            RECIRCULATION
: 1)  Power  to low-head SI pumps-AVAILABLE
: 2)    IEnter plant specific Iist3 E-1,12b                                G1,66b                                        None.
Check  auxiliary building radiation-    Check  auxiliary  and waste processing NORNAL                                building radiaticn - M)RNL IEnter plant specific    list)
Page  1 of  18
 
Attachment  1
                                                        - N5/SOAP  Step matrix N6 Ste                                          SHNPP St                  Task            Comments E-l,RN  12b                          G1,RNO 66b                                14  None.
22 Try to identify and isolate leakage:  Try to identify and isolate leakage.
[Enter plant specific means'.
E-1,12(                                G),37                                    15  This step falls at the end of G1,51                                    16    the LKA guideline under the 24    high level step "Evaluate Plan Obtain samples:                      "
Request Periodic  Activity Samples,0f          Status.'t this time, this All SGs                                        would be directed by the
[Enter plant specific  1istl                                                        Technical Support Center vice the Cmtrol Room.
E-1, 12d                              None.                                        This step falls at the end oF the LOCA guideline under the Evaluate plant equipment:                                                            hioh level step "Evaluate Plan Status.'t this time, this
[Enter plant specific list)                                                        would be directed by the Technical Support Center vice the Control Room.
E-1,12e                                None.                                    24  This step falls at the end of 25  the LKA guideline under the Start additional plant equipment to                                            26  high level step "Evaluate Plan assist in recovery:                                                                  Status.'t this time, this would be directed by the iEnter plant specific  list3                                                        Technical Support Center vice the Control Room. The operat is continually evaluating this need and doing it.
E-1, 15b                              G1,69b                                        None.
Check SGs  radiation - NORNAL          Check SG radiation - NRNL (Enter plant speciFic means)
Page 2 oF 18
 
lg ~ ei Vw s,4 1R
 
Attachment  1
                                                        - NG/SNR'tep Hatrix NS St                                          SHNPP  St              Task              Corments E-l, 17                                G1,70                                      This is not a tice  critical step. There is no    explicit At  ( )  Hours  After Event Initiation At 18 Hours After Event Initiation,        need to pr epare  for doing Prepare For Hot Leg Recirculation:    Align SI System For Hot Leg                EPP-011.
Recirculation Using EPP-011, Check    control room valve switches in "TRANSFER TO  NT  LEG fKCIRCULATION,"
the following position:                Step 1.
[Enter plant specific list of normally deenergized valves used for transfer to hot leg recirculation with their correct position during cold leg recirculation3 Check    circuit breakers so that the following valves are energized:
[Enter plant specific list of valves used for    transfer to hot leg rec ir culat ion]
E-3,2                                  G1,31                                14 15 Hiah  radiation from any  SG blowdown SG  blowdown radiation - M3RNL line:
[Enter plant specific means)
E-3,RM) 19 1)                          G2,RNO 28 1)                          17  The procedure  will be  revised to  list which  parameters  to thnitcr following ccnditions      For  Ihnite  PRT conditions                    monitor.
indicatim of leakage    fry PRIR POfN:
[Enter plant specific    list].
Paae 3  of 18
 
T
      , ~ fT",,air g~
hJ, V
                    <l
 
Attachment    1
                                                          - NO/SHtFP Step matrix NX Ste                                            95PP St                    Task              Comments E-3,31                                G2,45                                      23  The  additional detail in this step  will also  appear in the Ninimize Secondary System            minimize Secondary System                        EPPs where  appropriate.
Contamination:                        Contamination
[Enter plant specific aeansI          a. Isolate thin Steam from Auxiliary Steam System by locally shutting 1%-121.
: b. Isolate hotwel I spillover to CST  by locally shutting ICE-139 ICE-146
: c. Establish condensate flow throuoh condensate polishers to maximize removal    of secondary radioactivity.
: d. Place  CVPETS  in service.
ES-3.1,RN  5c                        EPP-017,  RNO  5c                              This step will be revised to ES-3.2,RM  5b                        EPP-018,RNO 5c                                  address the plant OP m PORV ES-3.3,R%  5b                        EPP-019,  RNO  5b                              local operations.
ES-3.3,8%  14c                      EPP-019,RNO 14c Nanually or  locally dump steam from Ihip  steam  with intact  SG PORVs.
intact  SG(s):
o    Use PORV.
o    IEnter plant specific means'.
Page 4 of  18
 
4'LI If ~ 4 rC&
  .~ ~
 
Attachment    1
                                                              -  16G/SSFP Step matrix 1(X Ste                                              9(NFP St                  Task              Corments ECA-I. I, RNO 3b                        EPP-012,RNO 3b                                    This step will be revised to address the plant P on PORV manually or locally dusq steam from      I)uaq steam from    intact  SG(s) using          local operations.
intact SG(s):                            PORV.
o    Use PORV.
o    [Enter plant specific means).
ECA-,I. I, RNO 17a                        EPP-012,  RNO  17a                                This step will be revised to address the plant P cn PORV thnually or locally der@ steam at        I)ump steam  at  maximum  rate using            local operat  its.
maximum rate from intact SG(s):          intact  SG PORVs.
o    Use PORV.
o    (Enter plant specific meansl.
ECA-1.1,(50 18a                          EPP-012,  Rt(O 18a                              This step Mill be revised to address the plant P cn PORV manually or    locally  dump steam  from  Duap steam    using intact    SG PORVs.          local operatims.
intact  SG(s) as necessary  to maintain RVLIS    full range  indication at (10):
o    Use PNV.
o    [Enter plant specific means).
Page 5  of 18
 
C l
IV>
4
                                        ~ a
              .1M% ~ t~ ~ '5 lpga
                        'I      yt J'-
          ~ '
g) ~ b C
 
Attachment    1
                                                              -  NO/SSPP Step Natrix MOG  Ste                                              SHNFP  St                Task                Corments KA-1 1,(M 21b
      ~                                  EPP-012,  RNO  21b                              This step  will be  revised to ECA-1.1, RNO 23b                        EPP-012,  RNO  23b                              address the plant    P  on PORV local operaticns.
Nanually or  locally  dump steam  From  Dump  steam using    intact SG PORV.
intact SG(s):
o    Use PORV.
DR--
o      (Enter plant specific means].
ECA-3.1, RNO 10c                        EPP-020,  RNO  11c                              This step  will be  revised to ECA-3,2, RNO 5c                          EPP-021,  RNO  5c                                address the plant    OP an PORV local operations.
Nanually or locally duxy steam from      Duap steam    using intact  SG PORVs.
intact SG(s):
o    Use PORV.
o    [Enter plant speciFic means].
ECA-3.3,(M 25b                          EPP-022,  RNO  26b                              This step Mill be revised to ECA-3.3,RNO 33c                          EPP-022,RNO    R                                address the plant    8'    PORV local operations.
Nanually or  locally  dump steam  from  Duap steam    using intact SG(s)    P(WV.
intact SG(s):
    -CR o    (Enter plant specific means).
Page 6  of  18
 
1 O'I  k v
1
~k      III h
 
Attachment    1
                                                                - )66/SSPP Step matrix NK Ste                                                SHNPP  St                Task ECA-0.1,8                                EPP-002, 10                                      This step will be revised to address the plant lP cn PORV Establish  SG  Pressure Control:        Establish    SG  Pressure Control:                local operatims.
: a. Set each  SG PORV  controller to  a. Coordinate with local operator maintain existing    SG pressure        and control SG PNVs to maintain existing SG pressure
: b. Place each SG PORV    controller in automatic mode
: c. Locally return    SG  PNVs  to remote  control:
(Enter plant specific means)
ES-O. I,R)4) 4b                          EPP-004, None.                                    EPP~    says to  verify chargin and letdown  in service. This thnually place in.ser vice:                                                                means  iF they are not in service to place them in
[Enter plant specific means).                                                              service.
ECA-3.3,4e                                EPP-022,5                                  18    None.
Try To Establish Auxiliary Spray:        Try To Establish Auxiliary Spray:
: e. Establish auxiliary spray flow:    a. Check    the following:
[Enter plant specific means]              1)    CSIPs  rurning
: 2)    Auxiliary spray path lined up
: 3)    Auxiliary spray available W
ECA-1.2, 1c                              EPP-013,  lc                                      None.
Verify Proper Valve Alignment:            Verify Proper Valve Alignment:
: c. Other paths    to outside          c. Check any    valves which failed containment    - CLOSEO                  to align in accordance with SI verification as a possible (Enter plant specific    list)          coolant loss flow path.
Page 7  of  18
 
f  lg  I l 14' Elkl I
 
Attachment  1
                                                          - N6/SSFP    Step Natr ix NOO  Ste                                        SHNPP  St                      Task                Corments EGA<.0, RNO 16b                        EPP-001,RNO 15b                                      This step will be revised to address the plant (P cn PORV Locally  dump steam using  SO PNVs:  Locally operate    SO PORVs.                          local oper aticns.
[Enter plant specific meansl ECA-1 ~ 1,7c                          EPP-012,7c                                          This procedure will be revised to  list requirements.-
Alion spray For recirculaticn:        Align  CNNT  spray  fcr recirculation (Enter plant  specific  means]
ECA-0.2, RNO 1a                        EPP-003, RNO  1a1)                                  This procedure will be revised to  list valve alignment.
manually align valves to establish    Align valves to establish cold leg cold leg recirculation alignment:    recirculation.
[Enter plant specific    list}.
ECA<.1,RNO 7a                        EPP-002, RNO 9a                                      None.
ECA-0.2,Rt8 6a                        EPP-003, Rt8 6a Establish required    AFN  valve      Establish required    AFM  valve alignment:                            alignment.
[Enter plant specific    list)
KA-3.1,29                              EPP-020,29                                    14    This procedure    will be revised ECA-3.2,23                            EPP-021, 22                                  23    to provide  more detail. See KA-3.3, 17                            EPP-022, 19                                          PATH-2 GUlDE, Step 45.
Ninimize Secondary System              Ninimize Secondary System Contamination:                        Contamination
[Enter plant specific meansl Page 8 oF 18
 
4~
a
.~>lf a ~ I
 
Attachment    1
                                                                - NOG/SIPP Step    Hatrix NK Ste                                                SHNPP  St                    Task              Crxrments ECA-1.2,2                                EPP-013,2                                      14    None.
22 Try To  Identify And  Isolate Break:      Try To Identify      And Isolate Break:
Sequentially close and open the          a. Dispatch an operator to      RAB  to Following valves and monitor for an            investigate.
RCS pressure increase:
: b. Use Radiation Honitoring System I)  Low-head SI purrp  cold leg                to determine possible source of injection valves                          leakage.
: 2)    fEnter plant specific    Iistl ECA-0.0,26                              EPP-001,24                                            This procedure    will be revised to provide  more detail  and  to Verify Service Hater    System,          Check EQI System Operation:                          verify EQ lineup to the    E16s.
Operation:
: a. Check  ESW    and ESN booster  purrps
: a. Verify valve alignment -    PRI'ER        running.
ALIGNNEHT
[Enter plant specific    list]
: b. Verify pump - RlMING ECA-3.1, RNO 7a                          EPP-020,RNO Sa                                        Hone.
Try to identify and isolate leakage:    PerForm the    following:
[Enter plant specific meansl    ~        o    Try to identify and isolate leakage.
o    EAL FLAG:      IF RCS leakage exists outside MT, THEN reference EAL, entry points        U and V.
Page 9  of 18
 
Attachment    1
                                                                - MK/SOAP Step Hatr  ix NX Ste                                              SHNPP  St                    Task            Ceeents ECA-3.1,7                                EPP-020,8                                    14    None.
15 Initiate Evaluation    Of Plant Status:  Initiate  Evaluation    OF Plant Status:    16 24
: a. Check  auxiliary buildina          a. Check auxiliary building              25 radiation -  NORNL                      radiation - NENL                      26
[Enter plant specific means)      b. Obtain samples    of RCS, SGs, and CNNT sump    as needed.
: b. ibtain  samples:
: c. Evaluate plant equipment.
Knter plant specific    means3
: d. Start additional plant
: c. Evaluate plant equipment:                equipment to assist in recoverye
[Enter plant specific list3
: d. Start additional plant equipment to assist in recovery:
(Enter plant specific    listl ECA-0.0, 12                              EPP-001, 11                                        None.
; Check  If SG Tubes Are Not Ruptured:. Identify  Any Ruptured SG(s) by using Radiation Nonita ing System.
o    Condenser  air ejecta'adiatim
        -  RENAL                          o    Condenser vacuum    effluent treatment monitcr      - NCRtNL o    SG  bludwn radiation - MENL o    SG  blmdtwn radiatim      monita-o    (Enter plant specific means]              NORNAL o    Nain steaml inc    radiation Mnitm -      NRAL Page 10 of 18
 
Attachment  1
                                                            - NG/SNAP    Step Natrix N5 Ste                                              SHNPP  St                  Task                Coaments E-2,6a                                    EPP-014, 7a                                16    None.
Request  periodic activity samples of    Request  periodic activity samples of all SGs:                                  all SGs.
(Enter plant specific meansI ES-0.2,3                                  EPP-005,3                                  16    None.
Verify Cold Baron  Shutdown            'erify Cold Boron %utdow Concentration By Sampling:                Concentration By Saryling.
[Enter plant  specific  means)
ES-0.2, 17                                EPP-005, 17                                        No specific instructions are ES-0,3,8                                  EPP-006, 18                                      necessary  to maintain seal ES-0.4,7                                  EPP-007,17                                        injection.
Naintain Required  RCP Seal Injection    Naintain Required    RCP  Seal Injection Flow:                                    Flv  .
(Enter plant specific meansl ECA-3.3,24                                EPP-022,21                                        The 95PP step has the operator check both seal cooling Naintain Required  RCP  Seal  Injection  Check RCP Coolina    - NRNL                      mechanisms, and the RM3 column Flow:                                                                                      directs the operator to restore o      RCP CQ system flow                        them  if not  ncrmal.
IEnter plant specific meansI o      RCP seal injection flow Page 11  of  18
 
I je  .s' 0
~ g4
 
Attachment  1
                                                      -  NG/SOAP Step Natrix SHNPP  St                  Task            Comments ECA<.1,20                          EPP-002,21                                10  None.
13 Try To Restore Offsite Power To All Try To Restore Offsite Power To      All AC Busses:                          AC Busses. IF necessary, THEN perform the following:
IEnter plant specific means]
: a. Verify EDGs  have  started.
: b. Verify EDGs  have assumed the praper loads,
: c. Verify turbine    DC emergency bearing  oil  and  air side  seal oil backup  pumps  are runnina.
: d. Verify adequate    EDG capacity and load equipment as necessary to establish stable canditions.
: e. Determine the cause aF the loss of offsite  power. IF due to a failure of the startup transformer, request assistance fram maintenance crews    to restore power from either the main ar spare startup transformer. If the loss af power is the result of a lass oF grid, obtain assistance Fram the Load Dispatcher.
Page 12 of 18
 
t J
gt r
a
 
Attachment    1
                                                                -  NG/SUPP Step Matrix N6 St                                                  SHNPP    St                  Task            Comments ES-1 ~ 1,RM) 22                    EPP-008,          RNO  21                            10    None.
ES-I.2,)M    4                      EPP-009,          RNO  4                              13 ECA-2.1, RNO 30                    EPP-015,RN 31 ECA-3.1,RNO 4                      EPP-020,          RNO  4 Try to restore ofFsite power. IF    Try to restore              offsite    power. IF necessary,  %EN manually load the  necessary,          THEN    perform the following equipment on the ac      following'.
emergency busses:
Verify EDGs      have  started.
[Enter plant specific  lists
: b.            Verify EDGs      have assumed    the proper loads.
: c.            Verify turbine      DC  lube  oil and air side    seal  oil  backup pumps are running.
: d.            Verify adequate EDG capacity and load    the following equipment m the EKs:
: 1)    One  instrurent air compressor
: 2)    Battery chargers
: 3)    PRl heaters,      as needed.
: e.            Determine the cause        of the loss of offsite power.          If due  to  a failure of the startup transformer, request assistance from maintenance crews to restore power from either the main or spare startup transFormer.        If the loss oF power is the result oF a loss of arid, obtain assistance frm the Load Dispatcher.
Page 13 of 18
 
Attachment    1
                                                            - NG/SOAP Step matrix NS Ste                                                SHNPP  St                  Task              CMments EGA<.0,5a2)                              EPP-001,5b                                  10    This step will be revised to provide more detail.
Verify ac  emeroency bus                Verify AC    emergency bus automatically energized:                automatically eneregized.
IEnter plant specific meansl ES-0.1.RM) 7                            EPP-004,  RNO  8                            10    None.
13 Perform the Following:                  Perform the, following as necessary:
a.,  IF necessary,  THEN verify        a. Verify EI6s'have started.
diesel generators have  assumed the following loads:              b. Verify EDGs have      assuaged  the proper'oads.
IEnter plant specific  list).
: c. Verify turbine      DC &urgency
: b. Try to restore  offsite  power:          bearing  oil  and  air side  seal oil  backup pumps    are running.
[Enter plant specific meansl.
: d. Verify adequate EDG capacity
: c. IF necessary, THEN manually              and load the following load the following equipment m          equipment on the EDGs:
the ac emergency busses:
: 1)    One  instruaent    air (Enter plant specific  list).                'compressor
: 2)    Sattery chargers
: 3)    PRl heaters, as needed.
: e. Determine the cause        of the loss of offsite power.        If due  to a Failure of the startup transformer, request assistance from maintenance crews to restore power from either the main or spare startup transformer. If the loss of power is the result of a loss of grid, obtain assistance from the Load Dispatcher.
Page  N oF 18
 
Attachment    1
                                                                -  16G/SNOOP  Step Natr ix WOG  Ste                                            SHNPP    St                    Task              Comments ECA-0.0, RNO 5a1 ) -2)                  EPP-001,  RNO  5a1 ) -2)                        13  None.
: 1)    Emergency  start diesel            1)    Start  EDGs  by actuating SI from generator:                              the  NCD
[Enter plant specific meansl            IF  EDGs  will not start,    THEN  go to  Step Sb.
: 2)  'manually energize ac emergency bus. IF bus can NOT be            2)    Energize    AC emergency bus.      IF eneroized, THEN manually trip            bus can MT be energized, THEN diesel generator and eneroize            attempt to locally energize ac emergency bus using any              emergency busses at switchgear.
available power supply:
[Enter plant specific meansl ECA-0.1,3b1)                            EPP-002, None.                                        The  CCW pump is started in a following step. It will be p
~ Check  valve alignment and  start  CCW                                                        here to be consistent with the pumps                                                                                          ERGs and to provide additional guidance on valve alignment.
: 1)    Check  valve alignment:
[Enter plant specific  list)
FRP-S.I,RNO 5a                          FRP-S.1,  RNO  5a                              19  None.
Dispatch operator    to locally trip    Dispatch an    operata'o locally trip reactor:                                reactor trip breakers        or rod  drive sotor generate sets.
(Enter plant specific means).
FRP-S. I,RNO 5b                          FRP-S.1,  RNO Sb                                12  None.
Dispatch operator    to locally trip    Dispatch an operator to locally        trip turbine:                                turbine.
(Enter plant specific means].
Page 15  of  18
 
        ,a ass n ~
1 4
1 +
* IX 4
4 IC
        '4
 
Attachment    1
                                                            - NG/SSPP Step Natrix NS Ste                                              SHNFP  St                Task            Comments FRP-C.1,RNO 2                            FRP-C.1, RNO  2                          4 Start  pumps and  align valves as      Start  pumps necessary. Try to establish any other high pressure injection:          Verify SI valve alignment -  PROPER ENERGENCT  ALIMENT Knter plant specific      listl Try to establish charging flow to RCS.
6o to Step 3.
Verify RHR 'valve alignment -  PRB'ER ENERGENCT  ALIMENT FRP-C.2,RNO 2a-b                        FRP-C.2, RNO  2a-b                            None.
: a. Start  pumps and align valves as  Start puris necessary. Try to estab lish any other high pressure            VeriFy Sl valve alignment  - PROPER injection:                        EMERGENCT  ALIGQENT IEnter plant specific Iist3        Try to establish charging flow to RCS.
: b. Start  pumps and align valves  as necessary. Try to establish any  other high pressure injection:
vf eqJ IEnter plant specific    list) k FRP-C.1,RNO 15                          FRP-C.1, RNO  15                              None.
FRP-C.1,RNO 22                          FRP-C.1, RNO  22 FRP-C.2,RNO 15                          FRP-C.2,RNO 15 Continue efforts to establish SI        Continue efforts to establish SI flow. Try to establish any other        f1~. Try to establish charging high pressure injection:                flow to  RCS.
lEnter plant specific    Iistl.
Page 16 of 18
 
ling
~ ++
41j
            ~ t t 4 J
lt(
          -1
 
Attachment  1
                                                          - I)6/SOAP    Step Hatrix N6 Ste                                          SHNPP    St                    Task              Coreents FRP-C.1, 19                            FRP-C.1, 19                                        This step will be revised to include steam drains upstream Try To Locally Depressurize All        Try To Locally Depressurize All                    oF HSIVs, and will address the Intact SGs To Atmospheric Pressure:    Intact SGs Ta Atmospheric Pressure.                (P an local operation of SG FORVs.
o    Use PORV o    (Enter plant specific means)
FRP-'C.2,RNO 10b                      FRP-C.2,RNO 10b                                      This step will be revised to FRP,-C.2,RNO 14b                      FRP-C.2,  RNO 14b                                    reference the plant OP on local SG PORV  oper atians.
thnually or lacally    dump steam from Duap steam  using    SG  PNVs.
SGs:
o    Use PNV.
o      [Enter plant specific meansl.
FRP-H.1,5c                            FRP-H.1,4c                                          None.
Establish Hain  FM Flow:              Establish i@in    FM  flow.
(Enter plant specific means)
FRP-H.3,8                              FRP-H.3,8                                    21    This step will be revised to address the plant (P m SG Establish Blowdow    Fram AFfected    Establish Blowdme      Fram  Affected              blawdawn.
SG(s):                                SG(s)  to  Lower  SG  Level.
(Enter plant specific means]
Page 17  of  18
 
e%% II ta
'i
              ~ ~
          ~ ~
I t
 
Attachment  1
                                                    - N6/SRFP Step Natrix N6 Ste                                        SNNPP St                Task FRP-l.1,3c                          FRP-J. 1,3c                                  This step vill be revised to list requirements.
Verify spray system valve alignment  Verify MT spray system valves-
- PROPER ENERGENCY ALIGhKNT          FRPER EtERGEXT ALIMENT (Enter plant specific  list for injection  and recirculation phases]
FRP-I.3, 16a                        FRP-I.3, 16a                          20    This step  vill be revised to 1 refer to the checklist in order Isolate containment:                Verify CNT ventilation isolation            to verify components.
IEnter plant specific  list)
Page 18  of  18
 
I IV
 
ATTA(3DIENT  l2  EMERGENCY PROCEDURES TASK TRA IN ING MATRI X Task            Task              Cold L I cense Tralnlng                          Coen)eats                          Hot License Training                        Ccn)sents Nunber Check If SI Is Actuated CLC-1-1-8, pp. 3 d 4                      Light panels d Per)sisslve Status      EOP-LP-3.1                            Steps and bases for Path-1. Task Slnulator Control  Roon Di f ferences    Panel reviewed. Sl status Indicated    Path-l, EPP~4) EPP~8                  required by procedure.
on panel.                              (In developnent)
CLC-2-4-1A, p. 3                          Discusses klckout      to EPP-4  If Sl  SIS-LP-3.0                            COC  Systens Training. Indications Review: Rx Trip Procedure                not required                            Safety Infection Systen              for  Sl (Pere)isslve Status Panel).
CLC-3-4-28) p. 6.                        Dlscusslon on Sl      verification. PLR-LP-3.2                            RO  Procedures Review.
Review: AOP-16, EPP-7, 8, 9 and 10                                                Energency Operating Procedures (To be developed)
CLC-3-5-)A, PD. 2-4                      Deno on SI  Indications and            RO  Hot License Sis)viator Scenarios  Exercises Involving use of Path-I Sl Denonstratlon                          veri f Ication. Also, each trainee      (In developnent) walks through each role.
CLC-3-5-18/3-5-2, p. 7                    CLC  Exercises with Sl actuation CLC-4-1-18/4-I-2A) pD 7-9
                                                      ~                exercises.                              SRO  Hot License Siaulator Scenarios CLC-4-3-18/4-2 DDT 9 d 10                                                        (In developxent)
CLC-4-4-2, pp. 6 d 7 CLC-5-1-1 ~ pp. 5 d 6 CLC-5-3-2, p. 5 CLC-5-4-2, pp. 6 d 7 CLC-5-5-1, pp. 10 d 11 CLC-5-1-2, pp. 7 d 8 CLC-6-1-1, pp. 6 d 7 CLC-6-)-28, p. 5 CLC-6-3-2, pp. 5 d 6 CLC 7 2-1, pp. 7 d 8 CLC-7-2-2, p. 8 CLC-7-4-2, pp. 8 d 9 CLC-7-5-1 ~ pp. 8 d 9 CLC-7-5-2, pp. 8 d 9 CLC-8-1-1, pp. 13 d 14 CLC 8 I 2) pp 9 d 10
                                              ~
CLC-8-2-2) pD. 5 d 6 CLC-8-3-2, PD. 5 d 6 CLC-9-1-1) p. 7 CLC-9-1-2, pp. 14 d 15 CLC-9-2-2, p. 4 CLC-9-3-2, pp. 8 d 9 I of 22
 
ATTACWENT l2  EHERGENCY PROCEDURES TASK TRAINING HATR I X Task            Task                  Cold License Training                      Couuents                          Hot License Training                      Couuents Nunber                            SS7221H                              PLR  Exercises with Sl actuation SS7222H SS7232H SS7241H SS7242H SS7251H SS7311H 557312H SS7322H SS7341H SS7342H SS742'IH SS7422H SS7431H SS7441H SS7442H SS7451H EOP Review, Section  I                Discussion on use ol Paths 6 EPPs.
Prelicense Review                    Haik through of HCB for Sl actuation Included.
Placing charing and letdown CYCS-LP-I.O                          CLC  Systeus Training.                CVCS-LP-3.0                          COC  Systeus  Tra I ning. Inc I udes in service                  Cheuical Yolune Control Systea                                              Cheolca I Voluue Control Systeu      f lowpath and Interlocks.
( In developnent)
CLC-3-4-28                            EPP~ (EPP~7        In old nuuberlng  EOP I.P  3 I                        Specific steps    and bases  for systeu) rev I awed. Requires          Path-l, EPP~4>      008              EPP~.      Requires annual operator to uanual ly align                                                aligneent of charging and charging and letdown.                                                      letdown.
CLC-3-5-IA                            SI DEHO. Each operator required to lupleeent  SI actuation 6 teralnation procedures. Requires  RO  Hot License Slaulator Scenarios Exercises Involving:
placing L/D 6 Charging In service.    (In developuent)                    I)  EPP-004, Rx  Trip  Response CLC-5-1-1                            Sisulator Scenarios Involving Sl      SRO    Hot License Sieulator        2) EPP-008, Sl Terelnation CLC 5 5  I) p. 12                    terulnat ion procedur e. Requires    Scenarios ( In dave lopuent)            (Hanual alignuent of letdown CLOD-1-28                            placing L/D 6 Charging in service.                                            letdown and charging)
CLC-7-2-2 CLC-9-3-2 SS7242H 2  of 22
 
ATTA(78IENT l2  EMERGENCV PROCEDURES TASK TRAINING MATRI X Task            Task                      Cold License Training                          Cceeents                          Hot License Training                        Coeutcn to Mvebcr                              SS734IH Placing excess letdown In    CVCS-LP-I.O                              CLC  Systess Training. F lorpath          CVCS-LP-3.0                          COC  Systcu Tra I ning. F 1orpath service                      Cheslcol Voluve Control Systeo          and  interlocks Included.                Cheslcol Voluvc Control Systcu      and  interlocks Included
( In developoent)
CLC-3-3-18                              Exerc I ses requl r I ng excess          RO  Hot License Sivvlator            Exercises requiring excess CLC-5 3-1                                letdorn be placed In service.            Scenarios ( In developeent)          letdown be placed In service.
CLC-7-4-'I SS7322H                                                                            SRO  Hot Licenses Siuulator SS7222H                                                                            Scenarios (In developvent)
Alignment of SI for Injection SIS-LP-I.O, Sections 2.6.2 ond          CLC  Systess Tra I ning. Includes        R%-LP-3.0, Section 2.6.2 8 2.6.3    COC  Systcvs Training.      Includes ond recirculation            2.6.3                                    flowpath and bases for switchover.        Residual Heat Reuovol Systen        florpoths  and bases  for swltchove Sl Systeo RW-LP-I.O, Sections 2.7.2 ond            CLC  Systeas Training.      Inc I vdes  SIS-LP-3.0, Section 2.7.2 d 2.7.2    COC  Systeas Training. Includes 2.3.3                                    f lorpaths  and bases  for switchover. Safety InJectlon Systex              florpoth  and bases for switchover.
18R  Systes PFR-LP-I.O, Sections 2.5.2 and          Phase Four    Training reviers            MCO-LP>>2.1, Section  2.3.3          SRO  Nltl gating  Core Dauage 2.5.3                                    f lowpoths ond bases for switchover.      Post Accident Cooling                Training. Includes bases for sritchover.
MCO-LP-I.I, Section 2.3.3                Bases  for Switchover.                  EOP-LP-3.3                          Specific steps    ond bases  for Post Accident Cooling                                                              EPP~~ 010 01 1 g 012~ 013            EPPs-010 ond Oil. Task      required (In development)                    by procedures.
EOP-009                                  Specific Steps of      EPPs 9,  10 6 11.
Continuing Training  -  1985            Tosk required by procedures.
Meek I/Lesson 3 18R Systee                              Review of I8R Systeo.                    RO  Hot License Siaulotor Scenarios  Exercises  Involving switchover to Prelicense Revler                                                                  (In developnent)                    Hot Leg  Recirculation.
I8R 8 Sl Systens (RQ86203)              Florpaths ond interlocks Requallf Ication Training  - 1986        cephasizcd.
CLC  6-1-1                              Siaulator Scenarios Involving            SRO  Hot License Siavlotor Scenarios SS7221H                                  sritchover to H. L. Reclrc.              (In developacnt)
(See Task II for all exercise Involving Sl actuation).
3 of 22
 
ATTA(5afENT l2  EMERGENCY PROCEDURES TASK TRAINING MATRIX Task            Task                      Cold License Training                              Cocoa nts                        Hot License Training                        Ccxunents Nugber Ali noent of (yaIT S ra  for CSS-LP-I.O                                  CLC S  stea Tralnln . Flow aths  CSS-LP-3.0                            COC S  stea Tralnn . Includes InJection and  recirculation  Contalnaent Spray Systea                    actuation signals and Interlocks      Containnent Spray Systea ( In        I lo'wp&thS actuation signals ~
included.                            developaent)                          and  Interlocks.
Contalnaent Spray Systeo                    Euphasis on operation and            EOP-LP-3.13                          Specific steps    and bases  for Prelicense Review                            response to accidents.                FRP  J.l, J.2                        FRP-J.I. Task required by procedure.
Conte l neent Spray (R086204)                Eaphasis on systea oods, operation Requa  I  I f Ication Training-1986          and  Interlocks.                      RO  Hot License Slaulator Scenarios  Exercises requiring Spray (In developnent)                      Actuation.
EOP  Review                                  FRP-J.I reviewed.
Prelicense Review EPPs~,          010, 011                    Review of steps and bases for        SRO  Hot License Slnulator Scenarios Cont I nuing Training                        EPPs 9, 10 d    ll (EPP-10 address    (In developaent) 1985 Meek        I/lesson 3                  alignment for recirculation).
CLC-5-3 I                                    Siaulator Scenarios requIring use CLC-5-5-1) p.        11                    FRP-J.I or CV Spray.
CLC 6 I I CLC-8-2-2 CLC-8-3-1 SS7221H SS7341H SS7342H Verify AFM Valves properly    AFS  LP-I.O                                  CLC  Systeas Training.      Includes  AFS-LP  3.0                          COC  Systeus Training. Includes aligned.                      Auxiliary FM Systeu                          flowpaths, interlocks    4 puap      Auxiliary FW Systen                    fiowpaths, interlocks    8 puap operations.                            (ln developaent)                    operations.
ESMS-LP-I.O                                  CLC  Systeas Training. Eaergency  ESM-LP-3.0                            CLC  Systeus Training Norsal 8 Eoergency Service Mater            water source for AFW.                Noroal and Energency Service Mater    Eaergency source for AFW.
(In developaent)
Auxiliary FW Systea                          Review of  AFW  operations.          EOP-L.P-3.1                          Speclf Ic steps and Bases Prelicense Review                                                                  Path-l, EPP-004,  008                for Path-1. Task required by (In developaent)                      procedure.
Aux l I I cry FM Systen (R086205)            Interlocks  and puap  operations    RO  Hot License Siaulator Scenarios  Exercises Involving  AFW Requal    If  ication Training - 1986      exphaslzed.                            ( In developoent)                    failures.
4 of 22
 
ATTACIaIENT F2  EMERGENCY PROCEDURES TASK TRAINING HATR I X Task            Task                        Cold License Training                          Coooents                        Hot L I cense Training                      ~nts Nuuber                                  CLC  3-5-1A    . 2-4                    Deno on Sl    Indications d            SRO  Hot License Slaulator Scenarios verification. Each trainee ~elks        (In developuent.)
through each role. (For scenario with Sl actuation see Task    II)
CLC-6-3-1                              5 lou l ator Exercises  Involving CLC-8-1-1                              AFM  failures.
SS7342H SS7242H Aligncent of  ESW  on Safety    ESWS-LP-I.O                            CLC  Systeus Training.      AI lgnuent  ESMS-LP-3.0                          COC  Systeos Tra I ning. A I I gnnent Injection                        Norual and Eoergency Service Mater      for  Sl Included.                      Norual and Euergency Service Water  for  SI Included.
(In developnent)
Homal and Energency Service Water      Review of    SW  operation.            SEO-LP-3.0                          COC  Systens Training. List Prelicense Review                                                              Safeguards Sequencer                couponents started In each Load  Block.
Noraal and Euergency Service Mater      Flowpaths, puap operations and          EOP-LP-3.1                          Specific steps and bases for (RQ86213)                                Inter locks eephas Ized.              Path-l, EPP-004, 008                Path-1. Task required by Requallf lcatlon Training-1986                                                  (In developuent)                    by procedure.
CLC-3-5-1A, pp. 2-4                    Deuo on SI    Indications and          RO  Hot License Siuulator Scenarios  Exercises with  ESW  Failures.
Sl Deoonstratlon                        verification.      Each trainee walks  (In developoent) through each    role.  (For scenarios with Sl actuated see Task      il). SRO  Hot License Siuulator Scenarios (In developnent)
SS7221H                                Sinulator Exercises with      ESM SS7341H                                failures, SS7421H Halntainlng  RCP  Seal Injection CVCS-LP-I.O                            CLC  Systens Training.                CVCS-LP-3. 0                        COC  Systens Training. Seal Cheuical Voluue Control Systeu          Injection  and  return f lowpath      Cheulcal Volune Control Systeu        Injection  and return path Included.
Included.                              (In developnent)
RCP-LP-I.O                              CLC  Systen Training. RCP Seals 6 Reactor Coolant Puups                  Seal    Injection discussed.
5 of 22
 
ATTACIaIENT l2 EHERGENCV PROCEDURES TASK TRAINING HATR I X Task            Task                    Col d L I cense Training                        Cacaents                        Hot License Training                          Coeaents Nuuber                              HCD-LP-I .0        . 3-6                  Seal De radatlon and ste s            RCS-LP-3.0                            COC S  stens Tralnln . RCP seal Loss  of  all  AC                        of EPPs-l, 2 8 3 dIscussed.            Reactor Coolant Systea                construction and operations ~
Task required by EPP-2.                                                                                        'ncluded.
EOP  Revlev                                Speci f c Steps of EPPs 1,2 6 3        AOP-LP-3.11                          Steps  for  AOP&18,    Abnoraal Pre-license Revler                        discussed. Task required by            AOP&18, 030                          RCR  Operations. Loss of seal EPP-2.                                (To be developed)                    InJectlon discussed.
CLC-4-2-1 A                                Revler of AOP-018, RCP Abnoreal        EOP-LP-3.7                            Steps and bases for EPPs-001, Ops. Loss of Seal Injection            EPP~I,    002, 003                  002, 003. Task required by discussed.                            ( In dave lopaent)                    EPP-002.
CLOD-5-1 A                                Revier of AOP-014, Loss ol    CCM.
CLC-4-2-18                                Sinululator Scenarios Involving    RCP HCO-LP  2.9                          SRO  Hit lgat lng Core Dauage CLC-5 4-18                                cooling nalfunctlons.                  Loss  of  AI I AC                    Loss of RCP Seal Cooling CLC-7-2-1                                                                                                              included.
SS7113H SS7142H                                    Siaulator Scenarios ulth Loss          RO  Hot License  Slaulator Scenarios Exercises Involving:
SS742IH                                    Sea I  InJect ion.                    (In developeent)                      I) RCP seal cooling smalfunctlons
: 2) Loss of seal injection SS7312H                                    Slaulator Scenario ulth loss of                                              3) Loss of all AC all  AC.
SRO  Hot LIcense Sieulator Scenarios (In developoent)
Local ly duuplng stean using HSSS-LP-1.0, Section 2.2.3                CLC  Systea Training.                HSSS-LP-3.0                          COC  Systens Training.
S/G PORVs                    Hain Steaa Supply Systen                  (Does not address senual ops.          Hain Stean Systee of S/G PORV).                          (In developeent)
HCD-LP-1.3, Section 2.4                    FRP-H.1 rev I cued. Copy of            EOP-LP-3.10                          Specific steps and bases for Loss of Feedvater Induced IOCAs            Gener I c MOG Procedure Included.      FRP&.1, C.2 and C.3                  for FRPs&.I and C.2. Task Task required by procedure.            In developuent)                      required by procedures.
EOP-Review (Handout)                      Steps and bases revleved    for        EOP-LP-3.11                          Specific steps    and bases  for Pre-license Reviev                        FRP-C.I, C.2 d H.l.                    FRY    lg H 2p H 3>>  H 4 6 H 5      FRP-H.I. Task required by (In  developnent)                    procedures.
EOP  Update                                Hanual operation of S/G PORVs    to    HCD-LP-2.1                            ICC  Indications  and stradegles.
Requallflcation Training-1986              be included In Meek    III.            Smal I Break LOCA  ulth  NO )ffSI 6 of 22
 
ATTACWENT l2  ENERGENCY PROCEDURES TASK TRAINING HATR I X Task            Task                  Cold L I cense Training                        Co>anent s                        Hot License Training                            Coeaents Nuaber                            CLC-8-1-1                              8 I au I ator Scenarios  I nvolv In use NCO LP    2.3                            Reviews Indications and strade    ies SS7242H                                of FPR&.I. Task required by              Loss of Feedwater      Induced LOCAs    for loss of    FW by procedure.
85572'IIH                              Slaulator Scenario Involving        use RO  Hot License Siaulator Scenarios    Exercises Involving:
of FRP-C.2.                              ( In deva  lopaent)                    I)  Use  of  FRP-C.1
: 2) Use of FRP-C.2 SRO  Hot License    Slaulator Scenarios 3) Use of FRP-H.I (In developnent)                        4) Local control of S/G      PORVs 10  Verify proper operation of SEO-LP-1. 0                            CLC    Systea Training.                  SEO-LP-3.0                              COC  Syste>s  Training t
the Sequencer              Safeguards Sequencer                                                            Safeguards Sequencer Sequences  Operations,                Review of    operations.                EOP-LP-3.1                              Specific steps    and bases  for Prelicense Review                                                                Path-1, EPP-004, 008                    Path-1. Task required by procedure.
EOP  Review                            Steps and bases for EPPs-001,            EOP-LP    3.7                            Specific steps    and bases for Prelicense Review                      002 8 003. Task required by              EPP~I    >  002, 003                    EPPs~i,      002 8 003. Task required by procedures.                                                                    by procedures.
RO  Hot License Sluulator Scenarios    Exercises Involving (In developuent)                        I) Loss of off-site power
: 2) Sl actuation CLC-3-5-1A, pp. 2-4                    S I Oea>onstrat  ion. Each trainee      SRO  Hot License Sla>viator Scenarios practices each role.                    (In developaent)
CLC-3-4-1/3-4-2A                        Exercises Involving:
CLC-5-5-1                              I) Station Blackout w/EOG functioning
: 2) Loss of AII AC Establ ishlng Hain FW Flow CFW-LP-I.O                              CLC    Systeas Training:                CFW-LP-3.0                              COC  Systeas Training Sections 2.2.6 through 2.2.10,          Includes f lowpath, coaponents and      Condensate and Feedwater                  Includes, flowpath, coaponents 2.4.6 through 2.4.10, d 2.4.13          14C.                                    ( In developaent)                      pars>isslves 6 interlocks.
Condensate  and Feedwater FW  Systea                              Flowpath, Interlocks d peralssives      EOP-LP-3      11                        Specific steps    and bases  for Continuing Training    - 1985          eaphaslzed.                              FRP H    I>  H 2> H 3  H 4~ H 5        FRP-H.I. Task required by Week I/Lesson 9                                                                  (In developaent)                        procedure.
7ol  22
 
ATTA(38(ENT l2  ENERGENCY PROCEDORES      TASK TRAINING HATR I X Task            Task                      Cold License Training                            Comments                              Hot License Training                        Comments Number                              CM) d FW S stem ERA-0IH                                    E10 d Flf Review. Emphasis on      valve Prelicense Review                          Interlocks and permissives.
FW  System (RO86201)                      Emphasis on      Interlocks  4            HCO-LP    2.3                          Reviews  indications  and Requa I lfI cat ion Training-1986          perml ss I ves.                            Loss of    FW  Induced LOCAs          stradegies for loss of    FW.
EOP  Review (Handout)                      Bases 8 steps of FRP-H.I reviewed.        RO  Hot License Simulator Scenarios  ExercIses Involving use of Prelicense Review                          Task required by procedure.                ( In development)                    FRP-H. 1.
CLC-8-1-1                                  Simulator Scenarios involving use          SRO    Hot License Simulator ScenarIos SS1242H                                    of FRP-H.I.                                (In development) 12  Locally tripping turbine      EHC-LP-1.0, Section 2.5.1                  CLC Systems    Training.                  EHC-LP-3.0                            COC  Systems  Training.
E lectrohydraul ic Control.                Includes Hechanlcal Overspeed              Eiectrohydraulic Control              Includes Mechanical Overspeed Trip Hechanism and local trip.              (In development)                      Trip Nechanism and local trip.
TSAA-LP-1.20, Section 2.7                  Bases  for  FRP-S.I Included.            EOP-LP-3.15                            Specific steps    and bases  for Anticipated Transient without Trip.                                                  FRP-S    I ~ S.2                      FRP-S.I (In development)
EOP  Review (Handout)                      Steps for FRP-S.I reviewed.        Task Prelicense Review                          required by procedure.
CLC-2-4-1A, p.4                            FRP-S.I reviewed.                          TdAA-LP-2.14                          ATWS  analysis Included for Antlclpated Transient without Trip    failure of turbine to trip.
(In development)
CLC-8-1-1                                  Simulator Scenario In which                RO  Hot License Simulator Scenarios  Exercises involving ATWS with turbine falls to      trip.                (In development)                      failure of turbine to trip.
SRO    Hot License Simulator Scenarios (In development) 13  Local Operation of Swltchgear 6.9 KV-LP-I.O                              CLC Systems    Training  and OJT.        6.9KV-LP-3.0                          COC  Systems  Training.
BKRs                          6.9 KV Auxiliary                                                                      6.9KV    Auxiliary 480V-LP-I.O>                              CLC Systems    Training  and OJT.        480V-LP-3.0                          COC  Systems  Training.
480V  Auxiliary                                                                      480V  Auxiliary 120VAC-LP-I.O                              CLC Systems    Training and OJT.
208/120 VAC Bof    22
 
ATTAOaIENT j2  EHERGENCY PROCEDURES TASK TRAINING HATR I X Task  Task      Cold License Training                          Comments                          Hot L I cense Training                      Comments Number      120V LPS-LP    1.0                      CLC S stems  Trainln  and OJT 120V Un  interrupt lb le Power DCP-LP-I.O                                CLC Systems  Training and OJT.
DC Power SACP-LP-I 0                              CLC System  Training and OJT.        120V LP    3.0                        COC  Systems  Training.
Standby    AC Porer                      Emergency Diesel Generator.          208/120VAC (In development)
SEO-LP-I.O                                CLC Systems  Training.              IPS-LP-3. 0                            COC  Systems  Training.
Safeguards Sequencer                                                            120V UPS AOP&evler                                AOP-025, Loss of one 6.9 KV          DCP-LP-3.0                            COC  Systems  Training.
Requal I I lection Training-1986          Emergency Bus or one DC Emergency    DC  Power Bus. To be covered in Heck      III.  (In development)
Sequencer Opcratlons,                    Includes Load shedding                PLIS"LP-3.0                            COC  Systems  Training.
Prelicense Revler                        and  reenergizing busses.            Plant Light System PZR  Heater Operations Prelicense        Effects of scquencer Operations      SEO-LP-3.0                            COC  Systems Tra lnlng.
Revlcr                                    on PZR Heater.                        Safeguards Sequencer                  Includes Load Shedding and and reenerglzlng busses.
HCD-LP-I 10                              EPPs-l, 2 6 3 Reviewed.              EOP-LP-3.7                            Specific steps  and bases Loss ol All AC                                                                  EPP~I,      002, 003                  of EPPs-001, 002 6 003. Task (In development)                      required by procedure.
AOP-004:    Control  Room                Revler of AOP~4. Malkthrough of      AOP-LP-3,12                            Steps of AOP-25, Inaccessible                              ACP 6 Power Supplies. Requires    AOP-024x 025    '28,  029            Loss of One 6.9 KV Emergency Prelicense Review                        operation of swltchgear              (To be developed)                      Bus or One DC Emergency Bus.
AOP~4, (R086210)                          Review of AOP~4. Requires local      RO  Hot License Simulator Scenarios  Exercises Involving Loss of  all AC.
i Requal flection Training      - 1986      operation of srltchgear.              (In development)
EOP-Revler                                Includes specific steps of            SRO    Hot License Simulator Scenarios Prelicense Revler                        speclf ic steps of EPPs-l, 2 6 3.    (In development)
Task required by procedures.
CLC-3-3-2A, pp. 4-8                      Simulator Review of EPP-I, 2    6 3. AOP-LP-3.0                            Steps and bases of AOP~4.
AOP-004                                Requires manual operations of sritchgear.
9 of 22
 
ATTACHMENT j2  EMERGENCT PROCEDURES TASK TRA      I NING MATRI X Task            Task                      Cold License Training                        Comments                                Hot License Training                        Comments Number                              SS7312H                                Simulator Scenario with:
SS7121H                                I) Loss of all AC, or SS7442H                                2) Use of AOP-25 SS7342H-14  Check radiation NORMAL for    RMS~I.O                                CLC Systems  Training.                      RMS-LP-3.0                            COC  Systems  Training. Operations RAB, SGs, Secondary and (yaIT Radiation Monitor Ing System                                                        Radiation Monitoring System            and response  to alarmS.
(To be developed)
RM-23,  ll 8 80/Gen  Atomics Rad      Reviews operation and response              AOP-LP-3.3                            Steps for AOP~5. Response Monitor                                to alarms.                                  AOP-005 (To be developed)              for alarms specified.
Prelicense Review SA)q'P-I.O, pp. 1-19                CLC System  Training. I ac I udes          SAIS-LP-3.0                            COC  Systems Tra I ning. Includes Sampling System                        f Iowpath.                                  Sampling System    (In developrent)    flowpaths.
CIS-LP-I.O                              CLC Systems  Training.                      CIS-LP-3.0                            COC  Systems  Training.
Containment Isolation System            Lists valves receiving    CIAS.              Containment Isolation System          List valves receiving    CIAS.
LWPS-LP-I .0                            CLC Systems  Training.                      PASS  LP-3 0                          COC  System  Training. Operation of Liquid Waste Processing System,        RCB  Equipment Drain Subsystem              Post Accident Sampling System          PASS.
included.                                    ( In development)
Post Accident Sampling System          Continuing Training Lesson.                  LWPS-LP-3.0                            COC  System  Training.
Continuing Training    - 1985          Operation of PASS.                          Llquld Waste Processing    System Week  2/Lesson 8                                                                    (To be developed)
AOP-LP-3.9                            Steps for AOP&16, RCS APP&16, 023, 031                      Leakage, including leak (To be 'developed)                    Identification stradegles.
CLC-1-1-18, p. 6                        CLC  Simulator/Site Differences              RO  Hot License Simulator Scenarios    Exercises involving use of    RMS.
including  RMS.                            (To be developed)
SS7112H,  p. 3                        PLR  Simulator/Std% Differences              SRO  Hot License Simulator Scenarios, Including  RMS.                            (To be developed)
CLC-3-4-28, pp. 2-5                    Review AOP-16,  RCS Leakage, including Leak  Identification stradegles.
10 of 22
 
ATTA(ta(ENT l2 ENERGENCY PROCEDURES TASK TRAINING HATR I X Task            Task                Cold License Training                          Connents                        Hot License Training                Coeeents Nunber                        CLC 4-I-IA    . 44                      Reviers  SGTR identification and use  of  RHS.
CLC-4-4-28                              5lnulator Scenarios Inc ludln9  use CLC-7-5-2                                of  RMS.
CLC-8-I-2 CLC-9-1-1 CLC-9-1-2 CLC-9-2-2 CLC-5-5-2 CLC-6-3-2 CLC-7-2-1 CLC-7-2-2 CLC-8-2-2 SS7251H SS7232H SS7222H SS7211H SS7321H SS7322H SS7331H SS7332H SS7311H SS7442H SS7421H SGTR:  Plant Response 15  Identify a Ruptured S/G Continuing Training - 1985              Prlnary and Secondary Response        EOP  LP-3.1                Spec I f I c steps and bases for Meek I/Lesson 6                          to  SGTR.                            Path-2) EPP 016            for Path-2      and EPP&16.
(In developnent)            Task required by procedure Path-2/EPP-16                            Specific steps and bases for          AOP-LP-3.3                  Steps and bases for AOP~5, RMS ~
Continuing Training    - 1985            Path 2 Including Identi I Ication    AORS                        Includes reponse to RMS alarm.
Meek I/Lesson 7                          of ruptured SG. Task required        (In developnent) by procedure.
SAI6'-LP-I ~ 0                          CLC  System Training.                AOP-LP-3.9                  Steps and bases      for AOP-016, Sanpllng Systen                                                                AOP&16 ~ 023) 031          RCS  I.eakage.
( In deva lopnent) 11 of 22
 
ATTA(3aIENT l2 EHERGENCy PROCEDURES TASK TRA I NING HATRIX Task            Task                Cold License Training                        Cceaents                        Hot License Training                        Coerwnts Nueber                          CLC-3-4-28    . 2 6 3                  Revlers AOP-016 RCS Leaks e            SOP-LP-3.0                          COC S  stees Trainln Including aethods of identification. Scapi lng Systen (In developaent)
CLC-4-I-IA                              Revle<<s  SGTR  Identification per      RO  Hot License Slaulator Scenarios  Exercises <<Ith  SGTRs.
Path-l.                                ( In deva 1opaent)
CLC 4-4-2                              Exercises <<1th    SGTR.                SRO  Hot License SInulator Scenarios CLC-7-5-2                                                                      (In developaent)
CLC-8-1-2 CLC-9-1-1 CLC-9-1-2 CLC-9-2-2 SS7251H SS7321H SS7322H SS7331H SS7332H SS7311H SS7442H 16  Requesting saaples  froa SOP LP 1.0                              CLC  Systees Training. Includes    SOP-LP 3.0                          COC  Systee Tra i ning. Includes Cheaistry                Saepllng Systea                        I lo<<paths.                            Saepling Systen (In developuent)    flo<<paths.
SG  activity RCS                  CIS-LP-I.O                              CLC  Systees  Tra I ning. L I sts      PASS-LP-3.0                          COC  Systeas Training.
Contalnoent  H        Contalnaent Isolation Systea            valves receiving CIAS.                Post AccIdent Saepllng Systeu RCS  Boron                                                                                            (In developnent)
Contalnaent Suep LWPS LP  1.0                            CLC  Systeas Training.                CIS-LP-3.0                          COC  Systen Training.
Liquid  Waste Processing  Systea        Includes RCB Equi pnent Drains        Contalneent  Isolation Systen      Lists valves receiving  DIAS.
Subsystea.
GP-LP-1.5, p. 22                        Relates that saapling Is done by      LWPS-LP-3.0                          COC  Systees Tralnlng.
cheelstry.                            Liquid Waste Processing  Systea      Includes RCB Equlpuent Drains (To be developed)                  Subsystea.
HCD-LP-2. 7                            SRO  Hitigatlng  Core Daaage          HCD-LP-2. 7                          SRO  Hit lgatlng Core Daaage Post Accident Pri nary                  Training. Describes changes In        Post Accident Prluary                Training. Describes changes Radlochealstry                          RCS chenlstry and personnel            Radlocheelstry                        In RCS cheuistry including hazards.                                                                    Personnel  hazards.
12  of 22
 
ATTAI3eIENT l2  EHERGENCT PROCEDURES TASK TRAINING HATRIX Task              Task                Cold License Training                          Comments                          Hot License Training                        Comments Number                          Post Accident Sam lln S stem            Cont I nuln        l Train n    Lesson.        RT LP  3.14                          RO Rx  Theor  Trainln . Includes Continuing Training - 1985              Includes operation of PASS.              S/D  Reactivity Considerations      SDH  Calculations.
Week 2/Lesson 8 RO  Hot License Simulator Scenarios  Simulator Exercises Involving ITo be developed)                    use of Sampling System.
T6M-LP-).7, Section 2.5                Inc ludes  SDM Ca I cu let lons.        SRO  Hot License Simulator Scenarios Normal  Transient Analysis                                                      (To be developed)
CLC-7-2-1, pp. 9 6 10                  ExercIses ulth failed fuel.
SS7411H                                Relates that chemistry does sampling.
CLC-4-4-28                              Exercises involving uses of CLC-7-5-2                              sampling systems.
CLC-8-1-2 CLC 9-1 I CLC-9-1-2 CLC-9-2-2 CLC-5-5-2 CLC-6-3-2 CLC-7-2-1 CLC-7-2-2 CLC-8-2-2 SS7251H SS7232H SS7222H SS7211H SS732IH SS7322H SS7311H SS7442H SS7421H 17  Non itor ing Conditions  PZR-I.P-I .0                            CLC Systems    Training. 16C        PZR-LP-3.0                          COC  System  Training. 16C Indicative of    PZR PORV Pressurizer                            included.                                Pressurizer                          Included.
Leakage RCS-LP-I.O                              CLC System    Training.      PZR and PRT RCS-LP-3.0                          COC  System Training. PZR Reactor Coolant System                  16C  included.                          Reactor Coolant System              and PRT 16C Included.
13  of 22
 
ATTACQIENT l2  EHERGENCV PROCE(XSES TASK    TRAINING HATR I X Task            Task                    Cold License Training                          Coaaents                            Hot License Tralnlng                          Gonne nts Nuaber                          FF-LP-I.I Sect 2.12.2                      Isenthal Ic Process discussed            FF-LP-3.2 Section 2.5.2                Isentha I Ic Process discussed F I u1 d F low: F lul d Hechan les          with exaaples using PZR PORVs            Fluid Flow: Fluid Hechanlcs            with exaaple using PZR PORVs.
In Pueps and Pipes                          leakage.                                  In Puup and Pipes CLC-3-3-1A                                  Review of AOP-019, Hal function of      AOP-LP-3.10                            Steps and bases      for AOP-019, of RCS Pressure Control. Includes        AOP-017, 019                            Halfunctlon of RCS Pressure Indication of PORT leakage.              (To be developed)                      Control. Includes Indlcatlons of PORV Leakage.
CLC-3-4-28                                  Review  of AOP&16,  RCS  Leakage.      AOP-LP-3.9                              Steps and bases      for AOP-016, AOP-016, 023, 031                      RCS Leakage.
CLC-4-5-2                                  Exercises Involving leaking or          RO  Hot License Siuulator  Scenar los Exercises    involving leaking or CLC-5-2-2                                  open PZR PORV.                            (In developwent)                      open PZR PORV.
CLC-7-2-2 CLC-8-1-2                                                                            SRO    Hot License Slsulator Scenarios SS7332H                                                                              (In developwent) 18  Establish Auxiliary Spray CVCS-LP-I.O                                CLC  Systees Training. Flowpaths      CVCS-LP-3.0                            COC    Systeas Training. F lowpaths Cheul eel Vol uwe Control Systea            Included.                                Cheuical Voluce Control Systeu          I nc I u dad.
(In developaent)
PZR-LP-1. 0                                CLC  Systees Training. Aux I I I sry  PZR-LP-3.0                              COC    Systeas Training. Aux Spray Pressurizer                                Spray Included.                          Pressurizer                            Included.
EPP&22                                      Specific steps  and bases for Continuing Training      -  1985            EPP&22. Task required by            EOP-LP-3. 6                            Specific steps    and bases  for Meek 2/Lesson 5                            procedure.                              EPP~5, 006, 007                        EPPs-22.      Task required (In developuent)                      by procedure.
EPPs-005,006    d 007                      Specific steps  and bases for Continuing Training      -  1985            EPPs-005,  006 d 007. Natural          EOP-LP-3.8                              Specific steps    and bases for Meek 2/Lesson 6                            circulation cooldown requires            EPPES, 006, 007                        EPPs-005, 006 4 007. N.C.
auxiliary spray,                          (In developuent)                      cooldown requires auxiliary spray, GP-LP-1.7                                  Steps include use of    auxiliary        GP-LP-3.7                              Steps include use of      auxiliary Noraal Plant Cooldown                      spray.                                  Norcal Plant Cooldown                  spray.
14 of 22
 
1 ATTACHMENT J2  EMERGENCY PROCEDURES TASK TRAINING MATRI X Task                Task              Cold License Training                        Coon>>nts                        Hot License Training                        Coca>>nts Nueber                          CLC-2-3                                Exercises Involvin use of CLC-9-2-1                              auxiliary spray.
SS7121H SS7151H CLC-9-1-2                              Exercises requiring use of SS7311H                                EPP-22.
19  Local tripping of Rx Trip RODCS-LP-I.O, Section  2.4.6          CLC  Systeas Training.                RODCS-LP-3. 0                        COC  Systeas Training.
Bkrs and MG sets          Rod  Control Systeo                                                          Rod Control Systea  (In developuent)
EOP-Review    (Handout)                Steps and bases for FRP-S.I.          EOP-LP-3. 15                          Specific steps and bases Pre-license Review                      Task required by procedure            FRP-S  I, S.2                        for FRP-S.I. Task required by procedure.
CLC-2-4-IA                              Review of FRP-S.I.                    RO  Hot License Slaulator Scenarios  Exercises using FRP-S.I.
(In develops>>nt)
CLC-2-5-28                              Exercises Involving use of            SRO  Hot License Slaulator Scenarios CLC-4-2-18                              FRP-S.I.                              (In develops>>nt)
CLC-4-3 IB/4-3 2 CLC-6-2 CLC-8-1-1 Verification of    C alT  CVS-LP-I.O                              CLC Systems  Training. Response    CVS-LP-3.0                            COC  Systeas Training. Response I sol at I on
                                                                                                                                                                                        'o Contains>>nt Ventilation Systeu          to DIAS  Included.                  Contalnaent Ventilation Systea            DIAS  Included.
CAPES-LP-I .0                          CLC  Systeos Tra I ning. Response    CIS-LP-3.0                            COC  Systeas Training. List of Contalnuent Atoosphere Purge and        to CIAS  Included.                                                        valves receiving CIAS included.
Exhaust C IS-I.P-I .0                          CLC  Systeos Training. List of        EOP-LP-3. 12                          Specific steps    and bases of Contains>>nt Isolation Systea            valves receiving DIAS included.      FRP-I.I, 1.2, 1.3                    FRP-I.3. Task required by procedure.
Contalna>>nt Ventilation Systeo          Includes operations and Plant Nods. RO  Hot License Slaulator Scenarios  Exercises with Sl actuation.
Prelicense Review                                                            (In developaent)                      (See Task  4'I).
EOP-Rev  I ex                          Specific steps for FRP-I.3            SRO  Hot License Slaulator Scenarios Prelicense Review                      discussed. Task required by        (In develops>>nt) procedure.
15 of 22
 
ATTA(3a(ENT l2  EMERGENCY PROCEDURES TASK TRAINING MATRI X Task            Task                        Cold License Training                            Coeednts                        Hot License Training                        Coeecnts Nueber                                  CLC-3-5-IA                                Sl Dceonstrntion.      Each trainee walks through each role for Sl actuation. (See Task      ll  for exercises with Sl actuation).
21  Establ lshing Blowdown froe      SGBS-LP-I .0                              CLC  Systees Training.                SGBS-LP-3.0                          COC  Systees Training.
S/Gs.                            8/G  B lowdown Systee                                                            S/G Blordown Systee SG-LP-I.O                                CLC  Systees Training.                SG-LP-3.0                            COC  Systees Training.
Stean Generator                                                                  Stead Generators EPPs-017, 018, 019                        Steps and bases of EPP418 reviered. EOP-LP-3.11                          Specific steps  nnd bases for i
Continuing Tra ning-1985                  BD  used  to depressurize ruptured    FRY.I,    H.2, H.3, H.4 4 H.5        FRP-H.5. Task required by Mack I/Lesson 8                          S/G.                                                                        procedure.
EOP-Review (Handout)                      Steps for FRY.5, Reponse to S/G Prelicense Revier                        High Level. Task required by procedure.
22  Try to Identify  8  Isolate lenk CLC-3-4-28, pp. 2 d 3                    Rcvldw of    AOP  16'CS  Ldakage, and EOP-LP-3.5                          Specific steps  and bases for discussion ot edthods of Identifying EPPs-20 4 21                          tor  EPP-20. Task required leakage                                (In developednt)                    by procedure.
RMS-HO- I . 0                            CLC  Systces Training.                RMS-LP-3.0                          COC  Systees Training.
Radiation Honltorlng Systee          RMS  used In leak Identltication; (In developeent)
RM-23,    11  6 80/Gen Atoelc Rnd        Operation ot RMS rdvldred. Haik        AOP-LP-3.9                          Steps  for AOP-16, RCS Leakage.
Monitors                                  through Included.                      AOPs&16, 023, 031                    Leak  identification strategies Prelicense Revier                                                                (To be developed)                    included.
EPP-20 d 21                              Specific Steps of EPPs-20.            AOP-LP-3.3                          Steps  tor AOP~5 ~ RHSr Cont inuing Train 1ng-1985                Task required by procedure.            AOP-005 (To be developed)            Response  tor alares specified.
t iteck 2/Lesson 4 CLC-7-5-2                                Sleulator Scenarios in which          RO  Hot License Sleuiator Scenarios  Exercises requiring use ot CLC-8-1-2                                EPP-20 iep leeentcd.                  (In developeent)                    EPP-20.
CLC-9-2-2 SS7322H                                                                          SRO  Hot License Sleulator Scenarios 557331M                                                                          (In developeent) 16  of 22
 
ATTA(38IENT l2 'ENERGENCT PROCE(XSIES TASK TRAINING HATRIX Task                Task      Cold License Training                            Coaaents                        Hot License  Training                          Cccuxants Nu88er Ninlalze secondhr  SGTR:  Radial    Ical Conse uences        Includes nechanl sos of radionucl Id@ EOP-LP-3.2                              S eclfic ste  s and bases  for coatee I n at I on Continuing Training    - 1985              transport  and  actions to minlelze. Path-2/EPP-16  (In developuent)        Path-2. Task requIred by Week I/Lesson 3                                                                                                            procedure.
RM-23,  ll 6  80/Gen Atoalcs Rad                                                  AOP-LP-3.3                              Steps revle<<ed    for  AOP-005.
Monitor                                                                          AOP~5                                    AOP-005  Includes actions that Prelicense Revle<<                                                                                                          minimize contaalnatlon HSSS-LP-I.O                                CLC  Systees Training.                HSSS-LP-3.0                              CLC  Systeas Training.
Hain Stean Systea                          Secondary Systees effected by          Nein Stean Systea                        Secondary Systees potentially contaalnatlon. Kno<<ledge of                                                    effected by contaulnation.
flo<<paths aids operator In taking                                              Kno<<ledge of flo<<paths aids action to accoapllsh task.                                                      operator In taking action to acccepllsh task.
SDS-LP-I.O                                                                        SDS-LP-3.0 Stean Duup Systen                                                                Stean Duep Systeu CFW-LP-I .0                                                                      CFW-LP-3.0 (28) and FW Systeas                                                              (28) and F'W Systees HSR  LP-I.O                                                                      HSR LP  3.0 HSR d FW HTRS                                                                    NSR  and  FW HTRS HOES-LP-I.O                                                                      HOES-LP-3.0 Main Condenser Evacuation Systea                                                  Main Condenser Evacuation Systea NTSS-LP-I.D                                                                      HTSS-LP-3.0 Hain Turbine Sealing Stean and                                                    Hain Turbine Sealing Stean and Exhaust Exhaust CPDS LP  I.O                                                                    CPDS-LP-3.0 Condensate  Pollshln9 6                                                          Condensate Pol l shing 8 Denineral Izing Dealneralizlng Systea                                                            Systea Path-2/EPP-016 Continuing Training    - 1985              Specific steps    and bases for        RO  Hot License Siaulator Scenarios      Exercises <<Ith  SGTRs.
Week I/Lesson 7                            Path-2. Task required by procedure. ( In developoent)
EOP  Update                                Actions added to procedures            SRO  Hot License  Siaulator Scenarios Requallficatlon Training-1986              discussed. Included In Week III.  ( In developeent) 17 of 22
 
ATTAOaIENT l2  EHERGENCT PROCEDURES TASK TRAINING HATR I X Task            Task              Cold License Training                        Contents                          Hot License Training                    Coeaents Nuuber                      CLC-4-4-2                              Exercises Involvin SGTRs.            RWO      al Cards                  Ste s  to:
CLC-7-5-2                              CLC-9-1-1 Involves a SGTR with the    I) OC 05.84H Perforaance 111.15    I) Isolate  Hain Stean to Auxiliary CLC-8-1-2                              associated HSIV stuck open. Path-2    2) OC 08.80H Perforfssnce 111.5        Stean CLC-9-1-1                              specifies actions that einlulzes                                        2) Place ChD Polishing Systea In CLC-9-1-2                              secondary contaulnatlon for that                                            service CLC-9-2-2                              situation. Soee of the actions are SS7251H                                applicable for SGTRs In general.
SS7321H                                                                      AO Oual    Card                    Steps  to:
SS7322H                                                                                                          I) Isolate    Hain Stean to  Auxiliary SS7331H                                                                                                              Steaa SS7332H                                                                                                          2)  Isolate Hotwell spillover to SS7311H                                                                                                              CST SS7442H                                                                                                          3)  Place  CVPETS  In service 24  Evaluate Plant Status GP-LP-I.O, Sections 2.24 8 2.25        Procedures Training on Conduct of    PP-LP-3.0                          RO  Procedures Training. 0 af-),
Conduct of Operations                  Operations. Continual evaluation of  0M~I, 009                          Conduct of Operations,    discusses plant status and use of redundant                                        Continual evaluation of plant instruuentation ls enphaslzed.                                          status and euphaslzes use of redundant Instruaent.
CLC-1-1-2, pp. 2-5                      Conduct of Operations Reviewed.      ADOP-LP-2.0,                      SRO  Advanced Operating Procedures SRO    Duties and Responsibilities Training. Conduct of Operations Cover sheet  for siaulator Exercise    Evaluates shift Conduct of                                              revle<<ed.
Guides                                  Operation for each exercise.
HCD-LP-I. I                            Hit lgatlng Cora Dauage Course        CO-LP-2.)                          Hitlgatlng  Core Daaage Course Post Accident Cooling                  describes:                            Post Accident Cooling              describes:
I) plant response to accidents                                          I) plant response to accidents
: 2) strategies for assessing dauage                                      2) strategies for assessing de<<age
: 3) strategies for recovery                                              3) strategies for recovery
: 4) equlpuent required to lapleeent                                      4) equip<<ant required to lapleuent recovery strategIes                                                      recovery strategies HCO-LP-1.2                                                                    HCD-LP-2.2 Snail Bkr  LOCA <<1th no IaISI                                                Seal l Bkr LOCA <<1th no HISI HCD-LP-1. 3                                                                  HCD-LP    2.3 Loss of FW Induced LOCAs                                                      Loss of    FW  Induced LOCA HCO-LP-1. 4                                                                  HCO-LP-2. 4 Vita I Process Instruuentat ion                                              Vital Process Instruuentation 18 of 22
 
ATTACfaIENT l2  EHERGENCY PROCEDURES TASK TRA      I NING HATRI X Task            Task                    Cold License Training                            Coceents                                Hot License Training                        Ccneents Nuober                          HCO  LP-1.5                                                                              HCO-LP-2 5 Accident Response of Incore                                                                Accident Response    of Incore Instruuentatlon                                                                            Instrunentatlon HCO-LP-I.6                                                                                HCO-LP-2.6 Accident Response of Excore                                                                A<<cldent Response of Excore Instrunentatlon                                                                            Instruuentatlon HCO-LP-1.7                                                                                HCO-LP-2.7 Post Accident Priaary Radlocheulstry                                                      Post Accident Pr leery Radiocheulstry HCO-LP- I . 8                                                                              HCO  LP-2.8 Radloioglca      I Aspects of Core Dauage                                                  Radiological Aspects of Core    Danage HCD-LP- I . 9                                                                              HCD-LP 2 9 Loss of AII AC Po>>er                                                                      Loss of    All AC Po>>er HCO-LP-I . 10 Class 9 Events HCO LP    I  11 Instrunent Oualif Ication and Accident Response EOP&20 8 021 Continuing Training      - 1985            Steps and bases  for EPP-20.                EOP-LP-3.5                            Specific steps  and bases for Meek 2/Lesson 4                              Task required by procedure.                  EPPs&20, 021                          EPP-020. Task required by procedure.
CLC-7-5-2                                    8lnulator Scenarios requiring        use      RO  Hot License Sluulator Scenarios    Exercises Involving EPP-020.
CLC-8 1-2                                    of EPP-20.    (Note:  A lnost a I I          (In developnent)                      (Note: Alnost all sieuator CLC-9-2-2                                    sloulator exercises    requIre use                                                  exercises require use of task.)
                                $ $ 7322H                                    of task).                                    SRO  Hot License  Slnulator Scenarios
                                $ $ 7331H                                                                                  ( In developnent) 25  Evaluate Plant Equi puent CLC  Systens Training                      Operations of  all  systeo covered In        COC  Systens Training                Operations of all systens, Continuing Training - 1985                  CLC  Training. Revle>>s    and updates                                              Including the Operating Pre I I cense Rev le>> Tra I ning            covered In Continuing Training,                                                      Procedures, covered in COC Requa I i f I cation Training-1986          Prelicense Revle>> and Requalif ication                                              Training.
Training.
19  of 22
 
t
  '1
,C
 
ATTACISIENT d2  EMERGENCY PROCEDURES TASK  TRAINING MATRIX Task  Task        Cold License Training                          Coonents                        Hot License Training                        Coooents Nuober      HCO-LP-I.I                                Hltl atln    Core Dana e Course        MCO-LP  2.1                          Hlti atln    Core Dana e Course Post Accident Cooling                      describesl                            Post Accident Cooling                descrlbesl I) plant response to accidents                                              I) plant response to accidents
: 2) strategies for assessing daoago                                          2) strategies fol assessing danago
: 3) strategies for recovery                                                  3) stl'atogios for l'ecovel y
: 4) equlpoont required to inpleoont                                          4) equlpeent required to lnpleoent recovery strategies                                                          recovery strategies MCO-LP-1. 2                                                                      HCO-LP-2. 2 Seal I  Bkr  LOCA with no ISISI                                                  Seal I Bkr LOCA  xlth  no HISI HCO-LP-I . 3                                                                      HCO-LP-2. 3 Loss of FW Induced LOCAs                                                          Loss of  FM Induced    LOCA MCO-LP  1.4                                                                      MCO-LP-2. 4 Vital Process Instrueentat ion                                                    Vital Process  I nstruoentat ion HCO-LP- I . 5                                                                    MCO-LP-2.5, Accident Response of Incore                                                      Accident Response of Incore Instruoentatlon                                                                  Instruwentat ion HCO-LP-I . 6                                                                      HCD-LP-2. 6 Accident Response    of Excore                                                  Accident Response    of Excore Instruoentatlon                                                                  .Instruoentatlon HCO-LP-1.7                                                                        HCO-LP-2. 7 Post Accident Prlnary Radlocheslstry                                              Post Accident Pr leery Radiocheolstry HCO-LP-1.8                                                                        HCO-LP-2. 8 Radiological Aspects of Core    Danage                                          Radiological Aspects of Core Daoage HCO-LP-1.9                                                                        HCO-LP  2.9 Loss of All AC Power                                                              Loss of  All AC  Poxer HCO-LP-1. 10 Class 9 Events MCO-LP-1. 11 Instrunent Oval lf lcatlon and Accident Response 20  of 22
 
ATTA(3CIENT l2  EMERGENCY PROCE(WAS TASK      TRAINING HATR I X Task            Task                Cold License Training                              Cocrrents                            Hot License Training                        Cocracnts Nucbcr                        EPP~      6 021                            Ste s and bases of EPP-20.
Continuing Training      - 1985            Task required by procedure.
                              'Week 2/Lesson 4 SS7114H                                      Sirrufator Scenarios Involving            EOP-LP-3.5                              Specific steps and bases for SS7121H                                      sultiple failures of      IWR, CCW, etc. EPP&20, 021                            EPP-20. Task required by procedure.
Operators are required to evaluate        (ln developccnt) equlprrent status and Initiate recovery <<1th available systecs.
CLC-7-5-2                                    Slsulstor Scenarios In <<hlch              SRO    Hot License Slrsulator Scenarios CLC-8-1-2                                    EPP-20    Is required. (Note: Afcost      (In developcent)
CLC-9-2-2                                    all  slsvlstor exercises require task.)
26  Start additional plant CLC  Systcsrs Training                      Each accident requires operation          COC    Systcrrrs  Training              Each  accident requires s unique equlpcent to assist In                                              of s unique sct of systccs. Any                                                    set of systecs be put Into recovery                                                            systcs that aright be required ls                                                  operation. Any systcrs that eight taught In systecs training.                                                        be required is taught In COC Systecs Training Including associated  OPs and AOPs, HCO-LP-1. I                                  Hit i gating  Core Oacage Course          HCO-LP-2. I                            Mitigating  Core Oacage Course Post Accident Cooling                        describes:                                Post Accident Cooling                  descrlbesr I) plant response to accidents                                                    I) plant response to accidents
: 2) strategies for assessing dacage                                                2) strategies fol'ssessing dscage
: 3) strategies for recovery                                                        3) strategies for recovery
: 4) eqvlpcent required to lsrplcccnt                                                4) equlpcent required to Isplecent recovery strategies                                                              recovery strategies MCO-LP-I 2                                                                              HCO-LP-2 2 Seal  I  Bkr  LOCA  <<Ith no ICISI                                                      Seel I Bkr LOCA <<1th no ISISI HCO-LP-1. 3                                                                            HCO-LP-2. 3 loss of    FW  Induced LOCAs                                                          loss of    FW  Induced  LOCA MCO-LP-  I, 4                                                                          HCO-LP-2. 4 Vital    Process    Instruccntstion                                                    Vital Process      I nstrurrentat ion HCO-LP-I 5                                                                              HCO-LP-2. 5 Accident Response      of Incore                                                      Accident Response        of Incore Instrucentation                                                                        Instruoentatlon 21  of 22
 
ATTACWENT l2  ENERGENCY PROCEDURES TASK TRAINING HATR I X Task  Tas'k        Cold License Training                        Coooents                          Hot License Training                          Conments Nunber      HCD-LP-1.6                                                                    HCO-LP-2.6 Accident Response of Excore                                                    Accident Response    of Excore Instrusentatfon                                                                Instrunentatlon HCO-LP-1. 7                                                                    NCO-LP-2. 7 Post Accident Prlnary Radiochenlstry                                          Post Accident Prinary Radlochexl    stry HCD-LP-1. 8                                                                    HCD-LP-2. 8 Radiological Aspects of Cote Danage                                            Radiological Aspects of Core Danage HCO-LP-I.9                                                                    HCO-LP-2.9 Loss of All AC Power                                                          Loss of All AC Power HCO-LP-1.10 Class 9 Events HCD-LP-1. I I Instrunent Oval I f I cation and Accident Response EPP-20                                  Specific steps of EPP-20.
Continuing Training                      Tasks required by procedure.
Meek 2/Lesson  4 SS7114H                                  Six(viator Scenarios Involving        EOP-LP-3.5                              Specific steps  and bases  for SS712'IH                                aultlple failures of  18R, CCII,      EPP-20 6 '21                            EPP-20. Tasks required  for t                                      etc. Operators are required to      ( In developnent)                        procedure.
evaluate plant status and initiate recovery with available systeas.      RO  Hot License Sinulator Scenerios    Exercises requiring use of (In developnent)                        EPP-20.    (Host sinulator scenarios CLC-7-52                                Sinulator scenarios In which                                                  require task).
EPP-20 Inple((ented. (Host six(ulator scenarios require task).
CLC-8-1-2                                                                      SRO    Hot LIcense Sinulator Scenarios CLC-9-2-2                                                                      (In developnent)
SS7322H SS7331H 22 of 22
 
ATTACHMENT 3 ADDITIONAL COLD LICENSE TRAINING Task                                Comments Locally  Dumping steam        Manual operation of S/G PORVs will be using S/G  PORVs              described and procedure reviewed. A walkthough of operations will be conducted.
Local operations on the S/G PORV have been incorporated into the applicable nonlicense Qualification Card.
, Minimize Secondary          , Actions that are being incorporated in the Contamination                  revised EOPs will be described. Manual actions that .require local operations have been incorporated into the applicable non-licensed Qualification Cards.
Local Operation of            Electrical plant  response to SI and LOSP Switchgear BKRs                will be  discussed  including requirement to monitor conditions and manipulate switchgear
 
l
    \
V tl "I 8 I
        ~1
            't:
4~
W P
I II P
II 4
b
 
ATTACHMENT4.
SCENARIOS
                                        -'IMULATOR
: 1. CLCL-7-2-2: Load Rejection/ATWS/RCS  Depressurization
: 2. CLCL-7-5-2: S/G Tube Leak/Rupture/ATWS/S/G      =PORV Failed  Open
: 3. SS7421H:    Inadvertent  SI/SW Malfunctions/LOCA      without  CSIPs
 
                      .g  't A
g t
II la P
II K
                  \
II t
iW
 
11/10/83 SHNPP  SIMULATOR EXERCI          IDE EXERCISE:      Load Rej ecti on/ATWS/RCS                                FILE NO. CLC-7-2-2          TIME:    4 hours Depressur ization conpletion of this exercise, the student will be able to:
OMECTIVES: .Upon limits.
0                            I t      12        tl    10 I          2              01
: 2. Take  appropriate actions on load rejection without                                steam  dumps  to stabilize plant in a safe condition.
: 3. Identify an ATWS event and take actions                                    to    prevent    core    damage  and radioactive releases to the environment.
: 4. Identify    a          failed            open  PZR  PORV    and  take corrective actions          to stop  RCS depressurization.
RELATED  LER's, UER's, POER's, etc:
a em            P                      ,              - Breakers failed        open    (UV  part of mechanical latch)
INITIAL CONDITIONS:                          IC-7 (BOL)    . Present                                  Previous resent power                          ours                                          PMR                    TEE 571                  Tav                    586 875                  BoNn                  839 174  D              Rod Hgt                208 0 Ilppp..
INSTRUCTOR GUIDE:
charging    flow to increase.
I              20              1002. I'I-122A  I ll CSIP failure requires placing "C" pump in service.
External load breakers opening with no auto dumps should cause reactor first out (Lo-Lo S/G Lvl). ATWS causes RCS pressure to increase.                                      When spray valves open, fail PCY-444B open. (Note: Do not trip R remotely until PORV opened). RCS will become saturated and remain saturated until block valve closed. Allow block valve to close after ISC and maintenance investigates.                                        (Upon completion of exercise, reset for shift turnover per CLC-7-2-1).
SHIFT TURNOVER to                or feed INFORMATION'crease power                                        pump    maintenance. Feed pump    tested    and  running.
MALFUNCTIONS                                          OVERRIDES                      REMOTE OPS T-O    All Auto Reactor Tr                        p    T-        PZR PORV  Iso Vl v Functions (Disabled)                                      8000C (Open)
T-0    Auto Steam                      Dump Con-      T-50      FI-122  A  Charging troller ( Inhibited)                                    'eader    Flow (Low)
T-0    Manual Reactor                      Trips      T-90      Charging Pump "A" (Disabled)                                                (Stop)
T-120 External Load Breakers                            T-VAR PCV-444B      Pressurizer 52-8 5 52-9 (Open)                                        Relief Valve (Open Fail when sprays open)
L      A C  arg ng F ow - Transmitter failure Char ging Pump "A" .- Motor bearing seized External Load Breakers - Phase differential relay PCV-4448 - Controller failure/valve jammed on backseat Block Valve - Breaker tripped (overcur rent relay failed)
ATWS - Trip breaker binding/improper lubrication EXPECTED RESPONSE:                          AS PER SERIAL RELATED CHECKOFF REQUIREMENTS:        5B, SD, 17, 18, 19, 8, 10, 16, 20, 21, 23, 24
 
          \
lg J~i tb l
v (I0 l~
 
SINJLATOR EXERCISE PERFORNHCE/OBSERVATION RECORD Course                                              Group                        Oata Instructors Gradings:      S =  Satisfactory    U  Unsatisfactory I. Exercise A.      Initial  Conditions/Scenario - exercise guide B. Shift  Assignments                            R  S/U            p Manipulations Per. Su        Per.        Su  .
SF
: 2. SRO
: 3. RO BOP
: 5. STA I I. Evaluation                                                SRO      RO        BOP      STA A. General
: 1. Supervisory ability--
: a. Effective supervision of others
: b. Effective direction of other
: 2. Operator communications    passes along information accurately and promptly
: 3. Annunciator response      immediately responds  uses alarm procedure
: 4. Use of procedures    pulls procedure and utilizes
: 5. Systematic and logical approach to pr obl ems
: 6. a. Attentive to instrumentation and controls
: b. Compares redundant channels
: c. Compares meter to recorder
: 7.
Alertness aware of plant status at all  times B.      Shift Turnover
: 1. Oral turnover
      '2. Hourly logs 3~  Review control. board 4~ Test annunciator lights
 
I
    -(fl I
l.
 
Rev. 1 11/10/83 FILE  NO:  CLC-7-2-2 C. Exercise Performance                                      SF SRO RO      BOP
: 1. Power Escalation 50% to 100%
: a.      a ntains avg ref
: b. Turbine Load Limits C  ~  Generator Loading (MVARs)
: d. S/G Level Control
: e. MSR Operation
: f. Maintains CAOC go Anticipates Xenon Transients
: h. Uses Curves Secondary Calorimetric at      90%
: 2. Char in Flow Indicator Failure(low)
Imme ate Act ons (1) Identifies Charging Flow Low (2)  Identifies Charging Pump  Running (3)  Verifies  PZR Level Increasing (4)  Takes Manual Control    of  FCV-122 Subsequent Actions (1)  Stabilizes Plant (2)  Maintains RZR Programmed Level (3)  Investigates Cause
: 3. Char in      Pum  "A'ri mme  >a e  c ons (1)  Acknowledge Annunciators (2)    Starts "B" Pump Subsequent Actions (1)  Stabilizes Plant With PZR  Level In Band (2)  Refers to Tech Specs (3 )  Investigates  Cause (4)    Initiates  Request to Place "C" Pump in Service
: 4. Generator Breakers 0 n a  ~      ent cat on (1) Generator Output OCBs Open (2)  Rapid Load Decrease      to Unit Auxiliary Loads (3)    Increased S/G Pressure (4)    Inward Rod Motion
: b. Immediate Actions (1) Verifies Automatic Actions (2) Observes Failure of Steam Dumps (3) Verifies S/G PORVs Open (4) Refers to AOP-15 (5) Places Steam Dumps in Pressure Control c~    Subsequent    Actions (1)  Stablilizes Plant      '
(2)  Investigates    Cause
 
Rev. 1 11/10/83 File    No. CLC-7 C. Exercise Performance (continued)                            SRD RD    BOP  ST (3)    Transfers      Aux Loads (4)    Identifies      ATNS
: 5. ATMS
: a. Immediate Actions (1)    Attempts To manually Trip Rx (2)    Drives Rods In (3)    Sends Personnel To (a) Trip MG Sets (b) Trip R Trip Breakers
                    .(c) Trip M3 Set Supply Breakers (4) Emergency Borate (5) Refers to FPP-1, FPP-2, or FRP-S.1
: b. Subsequent        Actions (1)    Investigate      Cause (2)    Initiates
                          'I PEP  (Alert)
: 6. Reactor Tri a  ~    mme    ate Actions (1) Verifies R Trip (2) Verifies Turbine Trip (3) Checks Power to AC Emergency Buses (4)    Checks SI Actuated (5)    Refers to FPP-1 or FPP-2
: b. Subsequent        Actions (1)    Verifies Plant Parameters Stablilizing at No-load Values (a)      T (b)      S/PLevel (c)      PZR Pressure and Level (2)    Conducts "Dead-Bus" Transfer to  S/U    Transformers (3)    Verifies Source          Range  Energized (4)    Secures      Unnecessary      Equipment (5)    Stabilizes Plant at No-load Conditions
: 7. PZR PORV      Failure a  ~
(1)    PZR  Pressure      Decreasing (2)    Relief Line      Temp Increase/Alarm PORV Indicates
                                          '3)
Open (4)    PRT Parameters          Increasing (5)    PZR  Sprays      Indicate Open b  ~  Immediate Actions (1) Attemps To Close Block                PORV (2) Energizes Heaters (3) Refers to AOP-19 (4) Observes SI Initiates
 
I C
J
 
Rev. 1 11/10/83 File No. CLC-7-2-2 C. Exercise Performance (continued)                        SRD RD    BOP  STA
: c. Subsequent  Actions (1)  Investigates Failure of Block Val ve (2)  C1oses  after  IAC Repair
: 8. Safet Injection
: a. e ers to      -1 or  FPP-2
: b. Performs Imaediate Actions
: c. Stops RCPs (1400 psig)
: d. Verifies Plant Recovery
: e. Identifies  Cause
: f. Terminates SI    Mhen  Criteria  Met
: 9. Natural Circulation
: a. ent cat on (1) No RCPs Running (2) Heat Sink Available
: b. Subsequent Actions (1) Refer To EPP-5 (2) S/G Press < 1110 psig (3) ,RCS 40'F (4) RCS h T < 60'F
: 10. Added Malfunctions a.
b.
c~
d.
 
Rev. 0 4/12/84 FILE NO. CLC-7-5-2 C. Exercise Performance (continued)                      SF  SRO RO    BOP
: 5. S/G Tube Leak
( 1) Increased Charging Flow (2)  Leak Rate    OST  Performed (3)  RMS  increase R-19 (4)  Performs Leak Isolation or Identifies Source (5)  Checks    all Instrumentation
: b. Immediate Actions
( 1) Determines Appropriate S/G (2)  Checks Tech Specs (3)  Commences    Rx S/D (4)  Shifts    Condenser  Exhaust
          -(5)  Refers to AOP-16 (6)  Observes    Blowdown  Isolated 6  ATWS
: a. Immediate Actions (1)  Attempts to Manually Trip Rx (2)  Drives Rods In (3)  Sends Personnel to Trip Rx Breakers (4)  Emergency Borate (5)  Refers to FRP-S.1
: b. Subsequent    Actions (1)  Investi gates
      ~li Cause (2)  Initiates    PEP  (Alert) 7.
: a. Immed>ate  Actions (1)  Verifies Rx Trip (2)  Veri fi es Turbine Tri p (3)  Checks Power to AC Emergency Buses (4)  Checks SI actuated (5)  Refers to FPP-1 or FPP-2
: b. Subsequent Actions
( 1)  Verifies Plant Parameters Stabilizing at No-load values (a)
(b)  S/G level (c) PZR Pressure and Level (2)  Verifies Transfer to SU Transformers (3)  Verifies    Source Range Energized (4)  Secures. Unnecessary    Equipment (5)  Stabilizes Plant at No-load Conditions
 
I I
        '\
    '1 1
t>)
h'
 
Rev. 0 4/12/84 F ILE NO. CLC-7-5-2 C. Exerci se. Performance (continued)                    SF  SRO RO    BOP
: c. Initiates  PEP  (unusual  event)
: 8. Safety Injection/S/G PORV Failed          en
: a. Comp etes Immediate Actions o FPP-1 or FPP-2 (1) Identifies RHR Pump A Tripped (2) Restarts RHR Pump A
: b. Identifies SGTR as Cause
: c. Identifies Ruptured S/G
: d. Isolates Ruptured    S/G
: e. Identifies  S/G PORV Failed Open
: f. Begins RCS Depressurization and      .
Cooldown
: g. Maintains Ruptured    S/G Level Between 10% and 50%
: h. Implements FPP-17 (1) Resets SI/Phase A (2) Cooldowns to 200'F      at
                    < 100'F/hour (3)  Depressurizes to Minimize RCS Subcooling at 40'F (4)  Maintains PZR Level (5)  Terminates SI (6)  Restores  LP and  Charging (7)  Isolates Accumulator
: 9. Intermediate Range Undercom ensated
: a. Ident> ies Undercompensat>on
: b. Manually Energizes Sources Ranges
: 10. Added  Nalfunctions a  0 b.
 
l I llII
          ~ P
    }2 44
: 0. iaalator Exercise Comments:
NTS/AI-26
 
C I
f 0
P I'  ll II
                .I <* 'hl  r k
                          '4
  'k, I
 
E.  . xerc3se Critique:
                                      . ~  SF  - S/U    BOP  - S/U SRO - S/U                  STA  - S/U RO  - S/U                  Overall Group Eval. - S/U F. Student Comnents/Sfaalator Improvement:
Instructor'  Signature HTS/AI-26                              14                            Rev. I
 
C
                  ~ ~
t V~
l X;~
jt ~
e n I
 
~
g SHNPP SIMULATOR EXERCIS          UIDE EXERCISE:      Inadvertent SI/SW Malfunctions                      LESSON CODE:        SS7421H LOCA W/0  CSIPs OBJECTIVES:      Upon  completion of this exercise, the student              will be    able to:
: 1. Perform the immediate actions required of operators following                        a Rx  trip and SI.
Use    the EOP network inclusive of the Flow Paths,                  End  Path Procedures      and Foldouts to direct operator actions.
: 3. Complete the appropriate          attachments      of OMM-004    following      an  activation of the    ESFAS.
: 4. Identify    a need  to  and make    notifications required        by the PEP.
: 5. Identify      a  stuck control rod and          make  required      adjustments      in shutdown margin.
: 6. Use AOP-001      to correct for    a  stuck control rod.
I
: 7. Use    available  MCB  indications plus requested information to identify                  a lealC.
from the    CCW  to ESW  system.
: 8. Use    OWPs    to place the protective cabinets in the correct alignment                          as required by Tech Specs following an instrument failure.
: 9. Detect    and take corrective action for              a  failure of        the steam      dumps  to control temperature.
: 10. Use    EPP-001 to mitigate the consequences                of  a    loss  of both      CSIPs  in conjunction with a small break LOCA.
INITIAL CONDITIONS: IC 43 ( )                    Present                                  Previous Present conditions for: )100 Hrs                  ~100                      PWR 588'F,                  Tav              same 527ppm                  Bar30 "D" at 192  steps          Rod  Hgt.
SHIFT TURNOVER INFORMATION:              Presently on line within one day of exceeding CPELs    Nuclear on-line record.                No surveillances        scheduled.        No testing allowed. Anticipate no changes CSIP under clearance for bearing replacement.
      "C" CSIP will be available in six hours, two hours into action statement.
INSTRUCTOR      GUIDE:      Reset    to    IC  43,  reboot  RMS,    ERF IS  and    conduct shift turnover.      With lamp    test complete override the        Vacuum pump        trip  alarms to off and  the operating vacuum pump red light to "on". Fail the operating vacuum
    'pump. When requested,        report the motor operating but' drastic drop in noise level (coupling sheared).            With stability restored insert the inadvertent SI.
After restoration have the SF complete an OMM-004. With this report ongoing insert the CCW-ESW leak.                With trouble shooting ongoing and temperature restored to 557 fail P-12. Allow both conditions to run their course and be corrected. With all systems restored to normal fail the operating CSIP. Give time for immediate action and fail the seal stack on any RCP (insert ~ 100 gpm leak to provide the leakage of the seal failure). If EPP-001 not addressed the instructor should prod in that direction before the situation degrades too far.
 
P~
              '1 l    t 1
r, 4
I. S aM
 
MALFUNCTIONS                  OVERRIDES                REMOTE OPS.
T-0 CRF3A untripable for P-8 T-0 CRF3A untripable for K-14 T-15 CND4A(B) to active          T-O  CND 94 (99) to low    T-0 CSIP racking T-30 SIS 1 to activate          T-0  CND 104 to low            status T-75 CCW 3 to 30 gpm            T-0  CNE 28 (29) D to "hi" T-90 MSS9 to fail .
T-120  CVC 5 for operating  unit TVAR RCS14A(B)(C) to 60 gpm TVAR RCS15A(B) (C)
TVAR RCS16A(B) (C)
SUPPLEMENTAL INFORMATION:
Inadvertent SI to ensure completion of OMM-004 prior to    Exam.
: 2. Vacuum Pump  coupling break occurred at HBR.
: 3. Loss of both CSIPs to use EPP-001 for this condition.
EXPECTED RESPONSE:  AS PER SERIAL RELATED CHECKOFF SUCCESSFUL COMPLETION    OF  THIS EXERCISE  FULFILLS THE FOLLOWING  NRC AND INPO REQUIREMENTS: 5C, 11,    17, 19, 24
 
er      I-I t
htg Cia
~ 'P S J
 
~ 4~
                                                          . ~
SIMULATOR EXERCISE PERFORMANCE/OBSERVATION RECORG Cour se                                  Group                          Oate Instructors Gradfngs:    S    Satisfactory    O'nsatisfactory I. Exercf se A. Initial    Condftfons/Scenario    -  exercise guide B. Shfft Assignments                                  x S U Per.        U ~      Per. S~
: 1. SF
: 2. SRO
: 3. RO
: 4. BOP
: 5. STA II. Evaluation                                          SF    SRQ    RO    BOP ST A. General
: 1. Supervisory      ability-
: a. Effective supervision of others
: b. Effective direction of others
: 2. Operator coamunfcatfons      passes along information accurately and promptly
: 3. Annunciator response-fmmedfately responds  uses alarm procedure
: 4. Use of procedures    pulls procedure and utilizes
: 5. Sytematfc and logical approach to problems
: 6. a. Attentive to fnstrumentatfon and  controls
: b. Compares'redundant channels
: c. Compares meter to recorder
: 7. Alertness  aware  of plant status at all times B. Shift Turnover
: 1. Oral turnover
: 2. Hour ly logs
: 3. Review control board
: 4. Test annunciator    lights
 
          ~g I~
I
                -l
      'lP
  )gal T
 
  ~\
~  ~+
Rev. 0 LESSON COOE: SS7421H C. Exercise Performance                            SF    SRO RO    BOP Loss  of Condenser Vacuum
: a. Notes change in efficiency,'reports same  and'nvestigates
: b. Notes change in condenser vacuum and performs immediate actions-of AOP-012
: c. Refers to AOP-012 for auto and immediate action verification
: d. Performs follow-up action of AOP-012
: e. Request sufficient information of A.O. to diagnose problem
: f. Initiates corrective maintenance
: g. Makes  notifications required
: 2. Inadvertent SI
: a. Recognizes  condition and takes appropriate immediate actions
: b. Uses EOP path 1 for action verification
: c. Recognizes SI termination criteria
: d. Address foldout A and B of EOP network
: e. Terminates SI IAW EPP-004
: f. Initiates    investigation
: g. Performs required administrative duties
: h. Address PEP and make notifications
: i. Performs required portions of OMM-004
: 3. Stuck Rods
: a. Recognizes mispositioned control rods
: b. Recognizes SI flow sufficient to meet emergency boration requirements
: c. Following SI realignment verifies sufficient  SOM Address AOP-001 for corrective action following SI termination e    Initiates corrective action 4,  Steam  Ou    Failure
: a. Notes SG-PORVs operating with condenser available
: b. Investigates and finds steam dump mal function
: c. Investigates cause and corrects
: d. Initiates corrective action,
: 5. CCW  Leak
: a. Interprets indications and recognizes a  loss of CCW
: b. Perform immediate action of AOP-014
: c. Refers to AOP-014 for auto and immediate action verification
: d. Performs follow-up action of AOP-014
 
  ~.
1
 
~ I~
Rev. 0 LESSON CODE: SS7421H C. Exercise Performance (continued)                  SF    SRO RO    BOP
: e. Trouble shoots and isolates leak to source
: f. Performs system realignment to isolate leak
: g. Address potential environmental concerns
: 6. Loss    of second CSIP
: a. Recognizes severity  of failure
: b. Immediately takes action to reduce RCS  inventory loss
: c. Takes  action to recover any CSIP
: d. Addresses EPP-001 as the only procedure that remotely covers the situation P
: 7. RCP  seal failure LOCA
: a. Perform immediate action of AOP-016
: b. Addresses AOP-016 for verification
: c. Recognizes impact of excessive leakage W/0 CSIPs
: d. Initiates rapid cooldowns to allow depressurization to reduce leakage
: e. Classifies event and makes notifi-cations as required by the PEP
: f. Properly injects accumulators
: g. Request assistance from plant staff
: h. Places RHR in service when allowable
: 8. Added Mal functions
            'a ~
b.
c~
 
                    ~e h
                      ~ ~
@Ca h '
            ~ ~
    '1 ~
:h
 
  .t 'p I
: 0. Siaolator Exercise Coaments:
NTS/AI-26
 
e, e
                      ~ a    )
(
~ I ah y g t~ 4~
~/  '
 
E~  Exercise Critique:                          SF-S/U                                  BOP-S/U SRO - S/U                            STA-S/U W
RO - S/U                            Overall Group Evan -S/U F~  Student Cosiients/SiauI ator I aproveaent:
Instructor 's Signatur e S IMP E RFORM                                  Page 3  of 3                            Rev. 1
 
P 4 ~ ~
C          .I
        ~
            ~  a    I k
t 4"
tif e
P4
 
Rev. 0 4/12/84 SHNPP SIMULATOR EXERCIS          IDE EXERCISE:        S/G Tube Leak/Rupture/ATNS/                FILE RQ. CLC-7-5-2        TINE:    A bra S/G PORV Failed Open OBJECTIVES:
open P
Upon completion of this
                        /P          k to stabi1 ize the pl ant, k,  k            /      i        /<<P/
exercise, the student will be able to:
and minimize radioactive rel eases              to the environment per FPP-17.
: 2. Take    proper      actions to put the reactor            in  a  safe  shutdown      condition following      an ATWS      event.
RELATED      LER's, UER's, POER's, etc: Ginna - January 25, 1982--S/G tube rupture; tu e ea ;          - LER-81-026 tube leak; HBR - LER-81-022 tube leak.
INITIAL CONDITIONS                    IC-11 (MOL)      Present                      Previous Present Power 3 1/2 hrs.                                5%          PWR            75%
5579'F      Tav            578'F 380 ppm      Boron          450 ppm
~p.
INSTRUCTOR GUIDE:
ower,  fail    CCW e eak during subsequent P
pump.
P actuation. An ATWS event will occur.
                                        //P<<
pwr increase.
103 on "D" Rod
                                                        .                p Hgt. 194 on "D"
                                                                                        /PP Fail N-42 after 90% calorimetric, and insert S/G tube Increase tube leak severity to cause SI
                                                                                              .        k SHIFT TURNOVER INFORMATION:
sve  p  ant condst1ons.            ant at  5% power  following trip of "B" condensate pump          ..
(BKR  malfunction).            Repairs are completed.        Synchronize to grid and increase power to 100%.
MALFUNCTIONS                                OVERRIDES                      REMOTE OPS T-0      All Auto    R    Trip          T-0    PZR "A"
heaters Gr-A      off Functions (Disabled)              T-0        RHR pump  (stop)
T-0      Manual R Trips                    T-30  "A"  CCW  pump  (stop)
(Disable5)
T-0      IR Channel      35 (Undercompensated)
T-90      PR  Channel 42 (Instr.
Power Fuses Blown)
T-130 Rather Than C-Loop, Leak in (A-Loop)
T-130 Generator Tube Leak (24 GPM Increase to 600 GPM)
T-VAR Power Oper. Rel. Valve (Failed Open)
SUPPLEMEN AL IN ORMATION:
pump - se>ze        motor bearing PZR  heaters Gr-A breaker tripped at control cabinet - due to overcurrent (heater grounds)
ATWS  -  BKR  failure TR-412 bT pen        - stuck pen "A" RHR pump - electrical circuit breaker closing                  mechanism    failure N Instrument power fuses blown EXPECTED RESPONSE:            AS PER SERIAL RELATED CHECKOFF RE(}UIREMENTS:        2, 3, 5A, 7, 8, 14, 16, 19, 21, 23, 24, 25, 26,                31
 
I ~ I
 
SINLATOR EXERCISE PERFORMANCE/OBSERVATION RECORD Course                                              Group                        Date Instructors Gradings:      S =  Satisfactory    U = Unsatisfactory I. Exercise A.      Initial  Conditions/Scenario - exercise guide B. Shift  Assignments                              R  S/U            p Manipulations Per. Su        Per.          Su SF
: 2. SRO
: 3. RO 4~  BOP
: 5. STA I I. Evaluation                                                SRO      RO        BOP      STA A.      General
: 1. Supervisory  ability--
: a. Effective supervision of others
: b. Effective direction of other
: 2. Operator communications    passes along information accurately and promptly
: 3. Annunciator response--immediately responds  uses alarm procedure 4,  Use of procedures    pulls procedure and utilizes
: 5. Systematic and logical approach to problems
: 6. a. Attentive to instrumentation and controls
: b. Compares  redundant channels
: c. Compares meter to recorder
: 7. Alertness  aware of plant status at all times B.      Shift Turnover
: 1. Oral turnover
: 2. Hourly logs
: 3. Review control board 4,  Test annunciat'or lights Rev. 0
 
0 ~s e c p
C lp
 
Rev. 0 4/12/84 FILE NO. CLC-7-5-2 C. Exercise Performance                                    SF  SRO RO    BOP
: 1. Reactor  Critical with Reactor Power        < 3'X a  ~  eri ies, nitia on itions
: b. Maintains Primary and Secondary (1) S/G Level.
(2) R Power <    3'3)
T ve/T ef c~    Generator Start-up (1) Voltage Control (2) Synchronizing
: 2. Power    Escalation Cl 0
                            ,/Tp
: b. Turbine Load Limits c  ~  Generator Loading (MVARs)
: d. S/G Level Control
: e. MSR Operation
: f. Maintains CAOC go    Anticipates Xenon Transients
: h. Secondary Calorimetric at 90'X 1 ~  Uses Curves J  ~  Identifies  bT pen    failure
: 3. Com  onent Coolin    Water    Pum  Failure a  ~    dent>>cation (1)  Acknowledges Annuciators (2)  Checks Flow Indicators b.'  Immediate Actions (1) Starts Backup Pump (2)  Verifies flow (3)  Refers to AOP-14
          ~  Subsequent Actions (1)  Investigates Cause (2)  Checks Tech Specs (3)  Informs ISC (4)  Fills  Out Work Request (5)  Aligns  C Pump as Backup
: 4. Power Range NI Failure a  e  Immediate Actions (1)  Stabilizes Plant (2)  Refers to Tech Specs
: b. Subsequent  Actions (1)  Rod Stop Bypassed (2)  Comparator Channels Oefeated (3)  Fuses  Removed (4)  OP-OT aT Bistables      Tripped (5)  Mrites Clearance (6)  Refers to AOP 8      OWP
 
0 \
l ~
j I
5 1
ra ~
4, h
 
NTS(Al-Z6 13 Rev.
0 ~ ''
        ~
+Jk Jg'
 
E. xercfse Crftfque:                SF  - S/U    BOP - S/U SRO - S/U                    STA  - S/U RO  - S/U                    Overall Group Eval. - S/U F. Student Comnents/Sfaalator Improvement:
Instructor's Signature NTS/AI-26                              14                            Rev.
 
C-    C.R
~ e.-g}}

Latest revision as of 19:00, 3 February 2020

Forwards Addl Info Re Emergency Operating Procedures in Response to Audit Conducted on 860710 & 11.Encl Responses Satisfy Util Commitments Re Training Program Documented in 860929 Ltr & 860814 Meeting
ML18022A438
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/01/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-86-379, NUDOCS 8610090482
Download: ML18022A438 (118)


Text

~

REGULA, Y INFORNATION DIBTRIBUTI YSTEN (RIDS)

ACCESS/ON NBR: Sb10090482 FACIL; 50-400 Shearon DQC. DATE: Sb/10/01 Harris Nuclear Power Planti Unit NOTARIZED:

ii NQ, Carolina DOCKET 0 05000400 AUTH. NANE AUTHOR AFFILIATION ZINNERNANe B. R. Carolina Power Cc Light Co.

RECIP. NANE RECIPIENT AFFILIATION DENTONi H. R. Office of Nuclear Reactor Regulationi" Director (post 851125

SUBJECT:

Forwards addi inFo re emergency operating procedures in response to audit conducted on Sb0710 Ze 11. Encl responses satisfy util commitments re training program documented in Bb0929 ltr 5 Sb0814 meeting.

DISTRIBUTION CODE: AOOSD COPIEB RECEIVED: LTR TITLE: QR/Licensing Submittal: Suppl 1 t ENCL J BIIE:

to NUREG-0737(Generic Ltr 82-33)

NOTES: Application for permit renewal filed. 05000400 I

REC IP ENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A ADTS 1 1 PWR-A EB 1 PWR-A EICSB 2 2 PWR-A FQB 1 PWR-A PD2 LA 1 1 PWR-A PD2 PD 7 7 BUCKLEY, B 1 i. PWR-A PBB 1 PWR-A RBB. '1 E

INTERNAL: ADN/LFNB 0 IE/DEPER/EPB 3 3 NRR BWR ADTS 1 NRR PAULSONe,'W 1 1 NRR PWR-B ADTS '1 1 NRR/DSRO ENRIT 1 1 1 NRR/DSRO/RSIB 1 1 REG FILES 1 1 RGN2 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 TOTAL NUNBER OF COPIES REQUIRED'TTR 31 ENCL 30

s Cf

! It "I ir, h

f 0 ll Ql '1 I Itch t ~ ' I I th

! hf ll II tJ I

C h lf t j h ti I hJ 476 h h

h'h<<h h Pt

'k h

, h

~ lk kt I tt I b It >>I I, 'E) h '$ ~ h) ,"h $ f'h, ~

it,, h, h

f '" 1 I', b t~ll II I" C "~,', I ~ ~

f h'hlh! g h I'"

'4h lhthh h>>

h

) 'I J b)hCl I<< p

' h t I

',, lt I~

ph) ~

$ I 44

<<I'hi hh <<h C.l,'lt 4 ~ kl t'It h) $ h ii) ht j

@ME, Carolina Power 8 Light Company SERIAL: NLS-86-379 SENT zm Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 EMERGENCY OPERATING PROCEDURES

Dear Mr. Denton:

Carolina Power R Light Company (CPRL) hereby submits additional information concerning the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Operating Procedures. The attached information (Enclosure 1) is provided in response to NRC concerns identified during an audit of the SHNPP Emergency Operating Procedures conducted on 3uly 10 and 11, 1986. Resolution of these concerns was discussed in a subsequent meeting with the NRC on August 10, 1986. The attached responses satisfy CPRL's commitments concerning the training program documented in CPdcL letter dated August 29, 1986 and discussed in the August 10, 1986 meeting.

Several of the NRC's concerns relate to the Procedures Generation Package (PCP). It should be noted, however, that the PCP is not the governing document for licensed operator training at SHNPP. Plant Training Instructions and the SHNPP FSAR provide the training requirements for operators. Emergency Operating Procedure training and evaluation have always been a requirement of these documents. The PCP will be revised to cover the NRC's comments, but it should be recognized that the Training Instructions and the FSAR remain the controlling documents.

,If you have any questions on this subject or require additional information, please contact me at (919) 836-6202 Yours very truly,

. R. Zi merman ager Nuclear Licensing Section 3HE/mf (50193DK)

Enclosure CC: Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-RII)

Sbi00904S2 Sb100 PDR *DOCK 05000400 F PDR 411 Fayettevilte Street o P. O. Box 155'1 o Raleigh, N, C. 27602

~ >

W' I

ENCLOSURE 1 Concern IA Certain plant-specific information which is called for in the Westinghouse ERG's has not yet been provided in the Harris EOPs. The applicant should perform a systematic review of training to assure that the information that is missing has been included in the training program. Evidence that current operators have all of the required skills and knowledge necessary to implement the EOPs should be documented for NRC review.

~Res oese A systematic review of the SHNPP EOP network and training to support the EOP network has been completed'ttachment 1 is a WOG/SHNPP Step Matrix identifying where, plant, specific information was not provided. , "Emergency Procedures and Task Training Matrix" provides documentation as to where training to support the "deleted plant specific information" was- conducted. The matrix includes both the Cold License Training Program which has been completed and the Hot License Training Program which will be conducted beginning in mid 1987. The materials to support the Hot License Training Program are presently under development and are scheduled to be completed by mid 1987.

In our letter of August 29, 1986, CP&L committed to complete additional training and/or EOP revision to ensure operator skill in using the EOPs prior to fuel load. Attachment 2 shows that training on plant specific information required to execute Emergency Operating Procedures is adequately provided in Cold License System Training, Continuing Training (1985), 'and Prelicense Review Training. CP&L considers the current status of EOPs and training to be adequate to ensure operator skill in using the EOPs. The commitments'.in Attachment 1 to revise the procedures are'enhancements to the training that has already been provided, and are not necessary prior to fuel load. These revisions will be completed by December 12, 1986 along with the human factors update as committed to in our August 29, 1986 letter.

Three tasks have been identified for which additional training will be provided. These tasks are considered to be minor items and are listed in . This training will be incorporated in the Licensed Requalification Program and completed by December 31, '1986. also shows that training on the deleted plant specific information is covered by the various portions of the Hot License Training Program. Specifically the Hot License EOP Training will include step-by-step discussion of each procedure and bases for each step.

Additionally, the EOPs will be fully exercised during the simulator portion of the Hot License Training.

r it l<t I

+](

A t+

Evidence that current operators have all the required skills and knowledge necessary to implement the EOPs is provided by the following:

1. The NRC licenses each operator. The licensing process includes a written exam, simulator exam, and a plant oral walk-through. Each exam relates in part to the emergency operating procedures. Successful completion of the exam provides adequate evidence that the operator is capable of utilizing the Emergency Operating Procedures.
2. Prior to the NRC exam, CP&L administers an NRC-style written, simulator and plant oral walk-through exam to ensure that the operators are well prepared to operate safely and are ready to be licensed by the NRC.

3~ During, the simulator training program (approximately 9 weeks for Cold License) the students are evaluated on their performance. The scenarios include normal operations, off"normal operations, and emergency operating procedures. The scenarios have single and multiple failures included. Three examples of simulator scenarios are provided as Attachment 4.

4. Written exams are given throughout the classroom training phases. These exams also include emergency operating procedures.
5. NRC Region-II conducted an Operational, Readiness Inspection during June, 1986. The training program

'"" 'for"'Cold License was reviewed and it was determined that the training program was satisfactory with only minor inspector follow-up items.

6. As indicated by the matrix, all EOPs were reviewed by Cold License Candidates in either the Continuing Training Program or Pre-license Review. This training included a step-by-step discussion of the EOP's and the bases for the steps.

I

7. The training program for Cold License meets or exceeds regulatory requirements.

Concern 1B:

Develop or provide evidence of a training program that systematically assures that information gaps in flowcharts and textual procedures are addressed speci'fically during future training, the program should include development of standards for the evaluation of task-level performance so that the applicant can identify whether all operators possess the appropr'iate enabling skills and knowledge to implement the"EOPs.

~ 7 f )

1%C g sp gA'

~Res onse As stated in response in IA above, Attachment 2 is provided showing the task listing for the Hot License Training Program. Also, as stated in IA

~

response above, the programiis under development and will be completed prior to conducting Hot License Training for future operators. The program is based on an INPO job task analysis. Attachment 2 will also be used to ensure that items referenced as training required for the usage of the EOPs will be included in the Hot License Program.

Evaluation of the operators to ensure they possess the appropriate skills and knowledge to implement the EOPs, will be similar to the Cold License Training Program which is: 1) written exams during classroom training 2) evaluation during simulator exercis'es 3) CPSL (NRC style) written, simulator,. and.plant oral-,walk~through exams prior to the NRC licensing exams; 4) NRC licensed operatorexams which include written, simulator, and plant oral. walk-through. Tasks identified by the INPO task analysis are to be incorporated into the simulator scenarios now in development.

The operators will be evaluated'individually on each task. The simulator exercise guides will reference the tasks and include the criteria for evaluation. Unsatisfactory performance of an evolution requires a repeat of that particular scenario.

Training conducted. during the Cold License Training Program Continuing Training and Pre-license Review Training was based on present emergency operating procedures. As changes are made to EOPs they are formally factored into the training program (Refer to Response to Comment 2 for discussion of process).

","..sEncLosures~4 DetailedComments. (Trainin Pro ram)

Comment 1:

The extensive use of flowcharts in the EOPs as described in the writer' guide reduces the amount of information that procedures can provide to operators. The training program must compensate for this lack of written information, i.e., the operators knowledge of plant. procedures must be greater. A training program description must be provided which specifically describes how the training program will maintain the high level of operator knowledge necessary for-"the use of flowchart EOPs.

This program description should address training program for EOPs distinct from training on other plant operating procedures.

~Res onse

.. Plant Training Instruction 200 (TI-200), "Licensed Operator Requalification Program", maintains operator knowledge of the EOPs through three portions of the program. The "On-The-Job Training" portion "requires that the EOPs be reviewed quarterly by each operator.

Additionally, the "Formal Classroom Lectures" portion includes a session

,on .Emergency Operating Procedures. Finally, the simulator portion requires sixty-four (64) hours of simulator training each year for each

j ~ 7 f

4

~

r I n ~)4

'I ~g sQ 1i ~,

licensed operator. Exercising the EOPs and ensuring operators can utilize the procedures is a major part of the simulator requalification training program. A review of the EOPs, with emphasis on the plant specific information required is scheduled for the lecture portion of the Requalification Program for 1986.

In order to ensure adequate operator knowledge, TI-200 requires that the following be performed as a part of the requalification training program'. 1) Operators will be evaluated during simulator training as to their ability to implement EOPs 2) CPSL will administer annual NRC-style written requalification exams, simulator exams, and plant oral walk-throughs. Additionally, the NRC may examine selected operators yearly in conjunction with the requalification program.

.Comment 2:

The PGP "should describe a program of retraining to be used in the event of revision of EOPs, including explicit designation. of how the need to retrain is to be determined (e.g., assignment of an individual to monitor revisions and retraining).

~Res ense:

Plant" Training'Instruction 901A, "Dissemenation of Training Related Information" describes the mechanism for review of revisions to plant procedures and EOPs. The instruction gives guidance for review of revisions and provides a tracking mechanism to ensure that the appropriate changes are included into training materials and training is conducted as appropriate. The Harris Training Unit assigns individuals as Subject,Matter Expertseto review the material.. The material is then routed as appropriate and tracked to ensure that the required training is completed. As described in the response to Comment 1 of Enclosure 4, Plant Training Instruction TI-200 "License Operator Requalification Program" requires that the EOPs be reviewed, and exercised on the simulator as a part of the training program on a continuing cycle with emphasis on any changes.

Additionally, On-Site Nuclear Safety (ONS) reviews reports (LERs, SOERS, etc.) concerning operational incidents at. SHNPP and other plants. ONS makes recommendations as to inclusion of the information into training.

HTU is a member of the ONS review group. The PGP will be reviewed and submitted to the NRC by April 15, 1987.

Comment 3A:

Although. the PGP states that a simulator will be used for operator training, the training program description should be expanded to address the following:

Discuss the method to be used to train the operators in areas where, the simulator is not like the control room or does not react like the plant, and in parts of the EOPs that can not be run on the simulator.

1 II r

~Res onse:

A lesson plan titled "Simulator Differences" is used in simulator training programs. If parts of the EOPs can not be run on the simulator, they are discussed as"part of the lesson plan or critiqued at the end of the exercise. ANSI/ANS 3.5 Section 3.1 dated 1981 requires that the simulator respond the same as the plant. The requirement goes into effect 18 months after the plant is in commercial operation. Until that time, if the simulator responds differently (now or once the plant is on line) the-differences will be discussed in the "Simulator Differences" lesson plan.

Comment 3B:

., Indicate the use of a wide, variety of, scenarios including mutliple (simultaneous and .sequential) failures, to fully. exercise the EOPs on the simulator and thus expose the operators "to a wide variety of EOP uses.

.~Res onse Attached are three (3) scenarios (including evaluation check sheets) indicating the use of a wide variety of scenarios including multiple (simultaneous and sequential) failures. This is only a sampling of the large number of scenarios that, we utilize in the simulator training program. The scenarios are from the Cold License Training Program that was conducted for the presently licensed operators.

Comment 4:

..".,The PGP."should. include. a -commitment;,to..train every, operator on .every EOP prior to EOP 'implementation in the control room.

~Res onse The presently licensed operators have been trained on all EOPs in the classroom and have been evaluated on simulator scenarios fully exercising the EOPs. The EOP review to be conducted in the 1986 Requalification Program will include training on changes and the EOP User's Guide. For future licensed operator training programs the operators will also be trained on all EOPs and have simulator training fully implementing the EOP procedures. The PGP will be revised to include comment 4 prior to startup following the first refueling outage as requested.

Comment 5:

The training program should indicate that operators will perform their assigned roles 'during training and that operators will be trained as teams.

q)s~

L I i V

~Res onse:

Plant Training Instructions, TI-201, "Reactor Operator Replacement Training Program", TI-202, "Senior Reactor Operator Replacement Training Program" and TI-200, "License Operator Requalification Program' AI 26R "Simulator Training", emphasize simulator training both in the team concept and in the individual role. Operators are evaluated during simulator exercises as a team as well as individual roles.

Comment 6:

The PGP should indicate that operators will be evaluated after training and that all operators will be evaluated.

~Res onse:

'As the part of the training program, operators are evaluated by written exams during'classroom training and during the simulator training they are evaluated on the exercises conducted. Unsatisfactory simulator evaluations require a repeat of the scenario. Prior to being licensed by the NRC, CP&L conducts NRC-style written, simulator, and plant oral walk-through exams to ensure that the operators possess the required knowledge to be licensed operators. The NRC provides written, simulator and plant oral walk-through exams to the operator prior to issuing individual licenses. Plant Training Instructions TI-200 "Licensed Operator Requalification Program, TI-201 "Reactor Operator Replacement Training Program", and TI-202 "Senior Reactor Operator Replacement Training Program" require that these evaluations be conducted. The requirement to evaluate operators will be added to the PGP by April 15, 1987.

i I

.1 J ~ t -t* 'PP4' 1" fll, i, I h

t u r

V'

Attachment 1

- NG/SOPP Step Natrix Task CMments E-O,RM) 36a GI,RNO 47a1) 10 Procedure will be revised to E-I,RN 11a 13 indicate how to verify proper'oading.

Try to restore offsite power to ac Try to restore offsite power to ac emergency busses. IF offsite power emergency busses. Verify EDGs can NOT be restored, THEN load the proper ly loaded following equipment on ac emergency busses:

IEnter plant specific list) ~

E-3.RN 11 G2,RNO 19 10 Procedure will be revised to 13 indicate how to verify proper Try to restore offsite power. IF Verify the following: loadina.

necessary, THEN manually load the following equipment on the ac 1) EDG properly loaded emergency busses:

2) Turbine X lube oil puaps-

[Enter plant specific list]. RUNNI%

3) Turbine seal oil backup puap-RUQ41%
4) Instrument air cm4x essors-

'MI%

E-1,12a G1,66a PATH GUIIE will be revised to include list of required items.

Verify cold leg recirculatim RHR system - CAPABLE CF COLD LEG capability: RECIRCULATION

1) Power to low-head SI pumps-AVAILABLE
2) IEnter plant specific Iist3 E-1,12b G1,66b None.

Check auxiliary building radiation- Check auxiliary and waste processing NORNAL building radiaticn - M)RNL IEnter plant specific list)

Page 1 of 18

Attachment 1

- N5/SOAP Step matrix N6 Ste SHNPP St Task Comments E-l,RN 12b G1,RNO 66b 14 None.

22 Try to identify and isolate leakage: Try to identify and isolate leakage.

[Enter plant specific means'.

E-1,12( G),37 15 This step falls at the end of G1,51 16 the LKA guideline under the 24 high level step "Evaluate Plan Obtain samples: "

Request Periodic Activity Samples,0f Status.'t this time, this All SGs would be directed by the

[Enter plant specific 1istl Technical Support Center vice the Cmtrol Room.

E-1, 12d None. This step falls at the end oF the LOCA guideline under the Evaluate plant equipment: hioh level step "Evaluate Plan Status.'t this time, this

[Enter plant specific list) would be directed by the Technical Support Center vice the Control Room.

E-1,12e None. 24 This step falls at the end of 25 the LKA guideline under the Start additional plant equipment to 26 high level step "Evaluate Plan assist in recovery: Status.'t this time, this would be directed by the iEnter plant specific list3 Technical Support Center vice the Control Room. The operat is continually evaluating this need and doing it.

E-1, 15b G1,69b None.

Check SGs radiation - NORNAL Check SG radiation - NRNL (Enter plant speciFic means)

Page 2 oF 18

lg ~ ei Vw s,4 1R

Attachment 1

- NG/SNR'tep Hatrix NS St SHNPP St Task Corments E-l, 17 G1,70 This is not a tice critical step. There is no explicit At ( ) Hours After Event Initiation At 18 Hours After Event Initiation, need to pr epare for doing Prepare For Hot Leg Recirculation: Align SI System For Hot Leg EPP-011.

Recirculation Using EPP-011, Check control room valve switches in "TRANSFER TO NT LEG fKCIRCULATION,"

the following position: Step 1.

[Enter plant specific list of normally deenergized valves used for transfer to hot leg recirculation with their correct position during cold leg recirculation3 Check circuit breakers so that the following valves are energized:

[Enter plant specific list of valves used for transfer to hot leg rec ir culat ion]

E-3,2 G1,31 14 15 Hiah radiation from any SG blowdown SG blowdown radiation - M3RNL line:

[Enter plant specific means)

E-3,RM) 19 1) G2,RNO 28 1) 17 The procedure will be revised to list which parameters to thnitcr following ccnditions For Ihnite PRT conditions monitor.

indicatim of leakage fry PRIR POfN:

[Enter plant specific list].

Paae 3 of 18

T

, ~ fT",,air g~

hJ, V

<l

Attachment 1

- NO/SHtFP Step matrix NX Ste 95PP St Task Comments E-3,31 G2,45 23 The additional detail in this step will also appear in the Ninimize Secondary System minimize Secondary System EPPs where appropriate.

Contamination: Contamination

[Enter plant specific aeansI a. Isolate thin Steam from Auxiliary Steam System by locally shutting 1%-121.

b. Isolate hotwel I spillover to CST by locally shutting ICE-139 ICE-146
c. Establish condensate flow throuoh condensate polishers to maximize removal of secondary radioactivity.
d. Place CVPETS in service.

ES-3.1,RN 5c EPP-017, RNO 5c This step will be revised to ES-3.2,RM 5b EPP-018,RNO 5c address the plant OP m PORV ES-3.3,R% 5b EPP-019, RNO 5b local operations.

ES-3.3,8% 14c EPP-019,RNO 14c Nanually or locally dump steam from Ihip steam with intact SG PORVs.

intact SG(s):

o Use PORV.

o IEnter plant specific means'.

Page 4 of 18

4'LI If ~ 4 rC&

.~ ~

Attachment 1

- 16G/SSFP Step matrix 1(X Ste 9(NFP St Task Corments ECA-I. I, RNO 3b EPP-012,RNO 3b This step will be revised to address the plant P on PORV manually or locally dusq steam from I)uaq steam from intact SG(s) using local operations.

intact SG(s): PORV.

o Use PORV.

o [Enter plant specific means).

ECA-,I. I, RNO 17a EPP-012, RNO 17a This step will be revised to address the plant P cn PORV thnually or locally der@ steam at I)ump steam at maximum rate using local operat its.

maximum rate from intact SG(s): intact SG PORVs.

o Use PORV.

o (Enter plant specific meansl.

ECA-1.1,(50 18a EPP-012, Rt(O 18a This step Mill be revised to address the plant P cn PORV manually or locally dump steam from Duap steam using intact SG PORVs. local operatims.

intact SG(s) as necessary to maintain RVLIS full range indication at (10):

o Use PNV.

o [Enter plant specific means).

Page 5 of 18

C l

IV>

4

~ a

.1M% ~ t~ ~ '5 lpga

'I yt J'-

~ '

g) ~ b C

Attachment 1

- NO/SSPP Step Natrix MOG Ste SHNFP St Task Corments KA-1 1,(M 21b

~ EPP-012, RNO 21b This step will be revised to ECA-1.1, RNO 23b EPP-012, RNO 23b address the plant P on PORV local operaticns.

Nanually or locally dump steam From Dump steam using intact SG PORV.

intact SG(s):

o Use PORV.

DR--

o (Enter plant specific means].

ECA-3.1, RNO 10c EPP-020, RNO 11c This step will be revised to ECA-3,2, RNO 5c EPP-021, RNO 5c address the plant OP an PORV local operations.

Nanually or locally duxy steam from Duap steam using intact SG PORVs.

intact SG(s):

o Use PORV.

o [Enter plant speciFic means].

ECA-3.3,(M 25b EPP-022, RNO 26b This step Mill be revised to ECA-3.3,RNO 33c EPP-022,RNO R address the plant 8' PORV local operations.

Nanually or locally dump steam from Duap steam using intact SG(s) P(WV.

intact SG(s):

-CR o (Enter plant specific means).

Page 6 of 18

1 O'I k v

1

~k III h

Attachment 1

- )66/SSPP Step matrix NK Ste SHNPP St Task ECA-0.1,8 EPP-002, 10 This step will be revised to address the plant lP cn PORV Establish SG Pressure Control: Establish SG Pressure Control: local operatims.

a. Set each SG PORV controller to a. Coordinate with local operator maintain existing SG pressure and control SG PNVs to maintain existing SG pressure
b. Place each SG PORV controller in automatic mode
c. Locally return SG PNVs to remote control:

(Enter plant specific means)

ES-O. I,R)4) 4b EPP-004, None. EPP~ says to verify chargin and letdown in service. This thnually place in.ser vice: means iF they are not in service to place them in

[Enter plant specific means). service.

ECA-3.3,4e EPP-022,5 18 None.

Try To Establish Auxiliary Spray: Try To Establish Auxiliary Spray:

e. Establish auxiliary spray flow: a. Check the following:

[Enter plant specific means] 1) CSIPs rurning

2) Auxiliary spray path lined up
3) Auxiliary spray available W

ECA-1.2, 1c EPP-013, lc None.

Verify Proper Valve Alignment: Verify Proper Valve Alignment:

c. Other paths to outside c. Check any valves which failed containment - CLOSEO to align in accordance with SI verification as a possible (Enter plant specific list) coolant loss flow path.

Page 7 of 18

f lg I l 14' Elkl I

Attachment 1

- N6/SSFP Step Natr ix NOO Ste SHNPP St Task Corments EGA<.0, RNO 16b EPP-001,RNO 15b This step will be revised to address the plant (P cn PORV Locally dump steam using SO PNVs: Locally operate SO PORVs. local oper aticns.

[Enter plant specific meansl ECA-1 ~ 1,7c EPP-012,7c This procedure will be revised to list requirements.-

Alion spray For recirculaticn: Align CNNT spray fcr recirculation (Enter plant specific means]

ECA-0.2, RNO 1a EPP-003, RNO 1a1) This procedure will be revised to list valve alignment.

manually align valves to establish Align valves to establish cold leg cold leg recirculation alignment: recirculation.

[Enter plant specific list}.

ECA<.1,RNO 7a EPP-002, RNO 9a None.

ECA-0.2,Rt8 6a EPP-003, Rt8 6a Establish required AFN valve Establish required AFM valve alignment: alignment.

[Enter plant specific list)

KA-3.1,29 EPP-020,29 14 This procedure will be revised ECA-3.2,23 EPP-021, 22 23 to provide more detail. See KA-3.3, 17 EPP-022, 19 PATH-2 GUlDE, Step 45.

Ninimize Secondary System Ninimize Secondary System Contamination: Contamination

[Enter plant specific meansl Page 8 oF 18

4~

a

.~>lf a ~ I

Attachment 1

- NOG/SIPP Step Hatrix NK Ste SHNPP St Task Crxrments ECA-1.2,2 EPP-013,2 14 None.

22 Try To Identify And Isolate Break: Try To Identify And Isolate Break:

Sequentially close and open the a. Dispatch an operator to RAB to Following valves and monitor for an investigate.

RCS pressure increase:

b. Use Radiation Honitoring System I) Low-head SI purrp cold leg to determine possible source of injection valves leakage.
2) fEnter plant specific Iistl ECA-0.0,26 EPP-001,24 This procedure will be revised to provide more detail and to Verify Service Hater System, Check EQI System Operation: verify EQ lineup to the E16s.

Operation:

a. Check ESW and ESN booster purrps
a. Verify valve alignment - PRI'ER running.

ALIGNNEHT

[Enter plant specific list]

b. Verify pump - RlMING ECA-3.1, RNO 7a EPP-020,RNO Sa Hone.

Try to identify and isolate leakage: PerForm the following:

[Enter plant specific meansl ~ o Try to identify and isolate leakage.

o EAL FLAG: IF RCS leakage exists outside MT, THEN reference EAL, entry points U and V.

Page 9 of 18

Attachment 1

- MK/SOAP Step Hatr ix NX Ste SHNPP St Task Ceeents ECA-3.1,7 EPP-020,8 14 None.

15 Initiate Evaluation Of Plant Status: Initiate Evaluation OF Plant Status: 16 24

a. Check auxiliary buildina a. Check auxiliary building 25 radiation - NORNL radiation - NENL 26

[Enter plant specific means) b. Obtain samples of RCS, SGs, and CNNT sump as needed.

b. ibtain samples:
c. Evaluate plant equipment.

Knter plant specific means3

d. Start additional plant
c. Evaluate plant equipment: equipment to assist in recoverye

[Enter plant specific list3

d. Start additional plant equipment to assist in recovery:

(Enter plant specific listl ECA-0.0, 12 EPP-001, 11 None.

Check If SG Tubes Are Not Ruptured
. Identify Any Ruptured SG(s) by using Radiation Nonita ing System.

o Condenser air ejecta'adiatim

- RENAL o Condenser vacuum effluent treatment monitcr - NCRtNL o SG bludwn radiation - MENL o SG blmdtwn radiatim monita-o (Enter plant specific means] NORNAL o Nain steaml inc radiation Mnitm - NRAL Page 10 of 18

Attachment 1

- NG/SNAP Step Natrix N5 Ste SHNPP St Task Coaments E-2,6a EPP-014, 7a 16 None.

Request periodic activity samples of Request periodic activity samples of all SGs: all SGs.

(Enter plant specific meansI ES-0.2,3 EPP-005,3 16 None.

Verify Cold Baron Shutdown 'erify Cold Boron %utdow Concentration By Sampling: Concentration By Saryling.

[Enter plant specific means)

ES-0.2, 17 EPP-005, 17 No specific instructions are ES-0,3,8 EPP-006, 18 necessary to maintain seal ES-0.4,7 EPP-007,17 injection.

Naintain Required RCP Seal Injection Naintain Required RCP Seal Injection Flow: Flv .

(Enter plant specific meansl ECA-3.3,24 EPP-022,21 The 95PP step has the operator check both seal cooling Naintain Required RCP Seal Injection Check RCP Coolina - NRNL mechanisms, and the RM3 column Flow: directs the operator to restore o RCP CQ system flow them if not ncrmal.

IEnter plant specific meansI o RCP seal injection flow Page 11 of 18

I je .s' 0

~ g4

Attachment 1

- NG/SOAP Step Natrix SHNPP St Task Comments ECA<.1,20 EPP-002,21 10 None.

13 Try To Restore Offsite Power To All Try To Restore Offsite Power To All AC Busses: AC Busses. IF necessary, THEN perform the following:

IEnter plant specific means]

a. Verify EDGs have started.
b. Verify EDGs have assumed the praper loads,
c. Verify turbine DC emergency bearing oil and air side seal oil backup pumps are runnina.
d. Verify adequate EDG capacity and load equipment as necessary to establish stable canditions.
e. Determine the cause aF the loss of offsite power. IF due to a failure of the startup transformer, request assistance fram maintenance crews to restore power from either the main ar spare startup transformer. If the loss af power is the result of a lass oF grid, obtain assistance Fram the Load Dispatcher.

Page 12 of 18

t J

gt r

a

Attachment 1

- NG/SUPP Step Matrix N6 St SHNPP St Task Comments ES-1 ~ 1,RM) 22 EPP-008, RNO 21 10 None.

ES-I.2,)M 4 EPP-009, RNO 4 13 ECA-2.1, RNO 30 EPP-015,RN 31 ECA-3.1,RNO 4 EPP-020, RNO 4 Try to restore ofFsite power. IF Try to restore offsite power. IF necessary, %EN manually load the necessary, THEN perform the following equipment on the ac following'.

emergency busses:

Verify EDGs have started.

[Enter plant specific lists

b. Verify EDGs have assumed the proper loads.
c. Verify turbine DC lube oil and air side seal oil backup pumps are running.
d. Verify adequate EDG capacity and load the following equipment m the EKs:
1) One instrurent air compressor
2) Battery chargers
3) PRl heaters, as needed.
e. Determine the cause of the loss of offsite power. If due to a failure of the startup transformer, request assistance from maintenance crews to restore power from either the main or spare startup transFormer. If the loss oF power is the result oF a loss of arid, obtain assistance frm the Load Dispatcher.

Page 13 of 18

Attachment 1

- NG/SOAP Step matrix NS Ste SHNPP St Task CMments EGA<.0,5a2) EPP-001,5b 10 This step will be revised to provide more detail.

Verify ac emeroency bus Verify AC emergency bus automatically energized: automatically eneregized.

IEnter plant specific meansl ES-0.1.RM) 7 EPP-004, RNO 8 10 None.

13 Perform the Following: Perform the, following as necessary:

a., IF necessary, THEN verify a. Verify EI6s'have started.

diesel generators have assumed the following loads: b. Verify EDGs have assuaged the proper'oads.

IEnter plant specific list).

c. Verify turbine DC &urgency
b. Try to restore offsite power: bearing oil and air side seal oil backup pumps are running.

[Enter plant specific meansl.

d. Verify adequate EDG capacity
c. IF necessary, THEN manually and load the following load the following equipment m equipment on the EDGs:

the ac emergency busses:

1) One instruaent air (Enter plant specific list). 'compressor
2) Sattery chargers
3) PRl heaters, as needed.
e. Determine the cause of the loss of offsite power. If due to a Failure of the startup transformer, request assistance from maintenance crews to restore power from either the main or spare startup transformer. If the loss of power is the result of a loss of grid, obtain assistance from the Load Dispatcher.

Page N oF 18

Attachment 1

- 16G/SNOOP Step Natr ix WOG Ste SHNPP St Task Comments ECA-0.0, RNO 5a1 ) -2) EPP-001, RNO 5a1 ) -2) 13 None.

1) Emergency start diesel 1) Start EDGs by actuating SI from generator: the NCD

[Enter plant specific meansl IF EDGs will not start, THEN go to Step Sb.

2) 'manually energize ac emergency bus. IF bus can NOT be 2) Energize AC emergency bus. IF eneroized, THEN manually trip bus can MT be energized, THEN diesel generator and eneroize attempt to locally energize ac emergency bus using any emergency busses at switchgear.

available power supply:

[Enter plant specific meansl ECA-0.1,3b1) EPP-002, None. The CCW pump is started in a following step. It will be p

~ Check valve alignment and start CCW here to be consistent with the pumps ERGs and to provide additional guidance on valve alignment.

1) Check valve alignment:

[Enter plant specific list)

FRP-S.I,RNO 5a FRP-S.1, RNO 5a 19 None.

Dispatch operator to locally trip Dispatch an operata'o locally trip reactor: reactor trip breakers or rod drive sotor generate sets.

(Enter plant specific means).

FRP-S. I,RNO 5b FRP-S.1, RNO Sb 12 None.

Dispatch operator to locally trip Dispatch an operator to locally trip turbine: turbine.

(Enter plant specific means].

Page 15 of 18

,a ass n ~

1 4

1 +

  • IX 4

4 IC

'4

Attachment 1

- NG/SSPP Step Natrix NS Ste SHNFP St Task Comments FRP-C.1,RNO 2 FRP-C.1, RNO 2 4 Start pumps and align valves as Start pumps necessary. Try to establish any other high pressure injection: Verify SI valve alignment - PROPER ENERGENCT ALIMENT Knter plant specific listl Try to establish charging flow to RCS.

6o to Step 3.

Verify RHR 'valve alignment - PRB'ER ENERGENCT ALIMENT FRP-C.2,RNO 2a-b FRP-C.2, RNO 2a-b None.

a. Start pumps and align valves as Start puris necessary. Try to estab lish any other high pressure VeriFy Sl valve alignment - PROPER injection: EMERGENCT ALIGQENT IEnter plant specific Iist3 Try to establish charging flow to RCS.
b. Start pumps and align valves as necessary. Try to establish any other high pressure injection:

vf eqJ IEnter plant specific list) k FRP-C.1,RNO 15 FRP-C.1, RNO 15 None.

FRP-C.1,RNO 22 FRP-C.1, RNO 22 FRP-C.2,RNO 15 FRP-C.2,RNO 15 Continue efforts to establish SI Continue efforts to establish SI flow. Try to establish any other f1~. Try to establish charging high pressure injection: flow to RCS.

lEnter plant specific Iistl.

Page 16 of 18

ling

~ ++

41j

~ t t 4 J

lt(

-1

Attachment 1

- I)6/SOAP Step Hatrix N6 Ste SHNPP St Task Coreents FRP-C.1, 19 FRP-C.1, 19 This step will be revised to include steam drains upstream Try To Locally Depressurize All Try To Locally Depressurize All oF HSIVs, and will address the Intact SGs To Atmospheric Pressure: Intact SGs Ta Atmospheric Pressure. (P an local operation of SG FORVs.

o Use PORV o (Enter plant specific means)

FRP-'C.2,RNO 10b FRP-C.2,RNO 10b This step will be revised to FRP,-C.2,RNO 14b FRP-C.2, RNO 14b reference the plant OP on local SG PORV oper atians.

thnually or lacally dump steam from Duap steam using SG PNVs.

SGs:

o Use PNV.

o [Enter plant specific meansl.

FRP-H.1,5c FRP-H.1,4c None.

Establish Hain FM Flow: Establish i@in FM flow.

(Enter plant specific means)

FRP-H.3,8 FRP-H.3,8 21 This step will be revised to address the plant (P m SG Establish Blowdow Fram AFfected Establish Blowdme Fram Affected blawdawn.

SG(s): SG(s) to Lower SG Level.

(Enter plant specific means]

Page 17 of 18

e%% II ta

'i

~ ~

~ ~

I t

Attachment 1

- N6/SRFP Step Natrix N6 Ste SNNPP St Task FRP-l.1,3c FRP-J. 1,3c This step vill be revised to list requirements.

Verify spray system valve alignment Verify MT spray system valves-

- PROPER ENERGENCY ALIGhKNT FRPER EtERGEXT ALIMENT (Enter plant specific list for injection and recirculation phases]

FRP-I.3, 16a FRP-I.3, 16a 20 This step vill be revised to 1 refer to the checklist in order Isolate containment: Verify CNT ventilation isolation to verify components.

IEnter plant specific list)

Page 18 of 18

I IV

ATTA(3DIENT l2 EMERGENCY PROCEDURES TASK TRA IN ING MATRI X Task Task Cold L I cense Tralnlng Coen)eats Hot License Training Ccn)sents Nunber Check If SI Is Actuated CLC-1-1-8, pp. 3 d 4 Light panels d Per)sisslve Status EOP-LP-3.1 Steps and bases for Path-1. Task Slnulator Control Roon Di f ferences Panel reviewed. Sl status Indicated Path-l, EPP~4) EPP~8 required by procedure.

on panel. (In developnent)

CLC-2-4-1A, p. 3 Discusses klckout to EPP-4 If Sl SIS-LP-3.0 COC Systens Training. Indications Review: Rx Trip Procedure not required Safety Infection Systen for Sl (Pere)isslve Status Panel).

CLC-3-4-28) p. 6. Dlscusslon on Sl verification. PLR-LP-3.2 RO Procedures Review.

Review: AOP-16, EPP-7, 8, 9 and 10 Energency Operating Procedures (To be developed)

CLC-3-5-)A, PD. 2-4 Deno on SI Indications and RO Hot License Sis)viator Scenarios Exercises Involving use of Path-I Sl Denonstratlon veri f Ication. Also, each trainee (In developnent) walks through each role.

CLC-3-5-18/3-5-2, p. 7 CLC Exercises with Sl actuation CLC-4-1-18/4-I-2A) pD 7-9

~ exercises. SRO Hot License Siaulator Scenarios CLC-4-3-18/4-2 DDT 9 d 10 (In developxent)

CLC-4-4-2, pp. 6 d 7 CLC-5-1-1 ~ pp. 5 d 6 CLC-5-3-2, p. 5 CLC-5-4-2, pp. 6 d 7 CLC-5-5-1, pp. 10 d 11 CLC-5-1-2, pp. 7 d 8 CLC-6-1-1, pp. 6 d 7 CLC-6-)-28, p. 5 CLC-6-3-2, pp. 5 d 6 CLC 7 2-1, pp. 7 d 8 CLC-7-2-2, p. 8 CLC-7-4-2, pp. 8 d 9 CLC-7-5-1 ~ pp. 8 d 9 CLC-7-5-2, pp. 8 d 9 CLC-8-1-1, pp. 13 d 14 CLC 8 I 2) pp 9 d 10

~

CLC-8-2-2) pD. 5 d 6 CLC-8-3-2, PD. 5 d 6 CLC-9-1-1) p. 7 CLC-9-1-2, pp. 14 d 15 CLC-9-2-2, p. 4 CLC-9-3-2, pp. 8 d 9 I of 22

ATTACWENT l2 EHERGENCY PROCEDURES TASK TRAINING HATR I X Task Task Cold License Training Couuents Hot License Training Couuents Nunber SS7221H PLR Exercises with Sl actuation SS7222H SS7232H SS7241H SS7242H SS7251H SS7311H 557312H SS7322H SS7341H SS7342H SS742'IH SS7422H SS7431H SS7441H SS7442H SS7451H EOP Review, Section I Discussion on use ol Paths 6 EPPs.

Prelicense Review Haik through of HCB for Sl actuation Included.

Placing charing and letdown CYCS-LP-I.O CLC Systeus Training. CVCS-LP-3.0 COC Systeus Tra I ning. Inc I udes in service Cheuical Yolune Control Systea Cheolca I Voluue Control Systeu f lowpath and Interlocks.

( In developnent)

CLC-3-4-28 EPP~ (EPP~7 In old nuuberlng EOP I.P 3 I Specific steps and bases for systeu) rev I awed. Requires Path-l, EPP~4> 008 EPP~. Requires annual operator to uanual ly align aligneent of charging and charging and letdown. letdown.

CLC-3-5-IA SI DEHO. Each operator required to lupleeent SI actuation 6 teralnation procedures. Requires RO Hot License Slaulator Scenarios Exercises Involving:

placing L/D 6 Charging In service. (In developuent) I) EPP-004, Rx Trip Response CLC-5-1-1 Sisulator Scenarios Involving Sl SRO Hot License Sieulator 2) EPP-008, Sl Terelnation CLC 5 5 I) p. 12 terulnat ion procedur e. Requires Scenarios ( In dave lopuent) (Hanual alignuent of letdown CLOD-1-28 placing L/D 6 Charging in service. letdown and charging)

CLC-7-2-2 CLC-9-3-2 SS7242H 2 of 22

ATTA(78IENT l2 EMERGENCV PROCEDURES TASK TRAINING MATRI X Task Task Cold License Training Cceeents Hot License Training Coeutcn to Mvebcr SS734IH Placing excess letdown In CVCS-LP-I.O CLC Systess Training. F lorpath CVCS-LP-3.0 COC Systcu Tra I ning. F 1orpath service Cheslcol Voluve Control Systeo and interlocks Included. Cheslcol Voluvc Control Systcu and interlocks Included

( In developoent)

CLC-3-3-18 Exerc I ses requl r I ng excess RO Hot License Sivvlator Exercises requiring excess CLC-5 3-1 letdorn be placed In service. Scenarios ( In developeent) letdown be placed In service.

CLC-7-4-'I SS7322H SRO Hot Licenses Siuulator SS7222H Scenarios (In developvent)

Alignment of SI for Injection SIS-LP-I.O, Sections 2.6.2 ond CLC Systess Tra I ning. Includes R%-LP-3.0, Section 2.6.2 8 2.6.3 COC Systcvs Training. Includes ond recirculation 2.6.3 flowpath and bases for switchover. Residual Heat Reuovol Systen florpoths and bases for swltchove Sl Systeo RW-LP-I.O, Sections 2.7.2 ond CLC Systeas Training. Inc I vdes SIS-LP-3.0, Section 2.7.2 d 2.7.2 COC Systeas Training. Includes 2.3.3 f lorpaths and bases for switchover. Safety InJectlon Systex florpoth and bases for switchover.

18R Systes PFR-LP-I.O, Sections 2.5.2 and Phase Four Training reviers MCO-LP>>2.1, Section 2.3.3 SRO Nltl gating Core Dauage 2.5.3 f lowpoths ond bases for switchover. Post Accident Cooling Training. Includes bases for sritchover.

MCO-LP-I.I, Section 2.3.3 Bases for Switchover. EOP-LP-3.3 Specific steps ond bases for Post Accident Cooling EPP~~ 010 01 1 g 012~ 013 EPPs-010 ond Oil. Task required (In development) by procedures.

EOP-009 Specific Steps of EPPs 9, 10 6 11.

Continuing Training - 1985 Tosk required by procedures.

Meek I/Lesson 3 18R Systee Review of I8R Systeo. RO Hot License Siaulotor Scenarios Exercises Involving switchover to Prelicense Revler (In developnent) Hot Leg Recirculation.

I8R 8 Sl Systens (RQ86203) Florpaths ond interlocks Requallf Ication Training - 1986 cephasizcd.

CLC 6-1-1 Siaulator Scenarios Involving SRO Hot License Siavlotor Scenarios SS7221H sritchover to H. L. Reclrc. (In developacnt)

(See Task II for all exercise Involving Sl actuation).

3 of 22

ATTA(5afENT l2 EMERGENCY PROCEDURES TASK TRAINING MATRIX Task Task Cold License Training Cocoa nts Hot License Training Ccxunents Nugber Ali noent of (yaIT S ra for CSS-LP-I.O CLC S stea Tralnln . Flow aths CSS-LP-3.0 COC S stea Tralnn . Includes InJection and recirculation Contalnaent Spray Systea actuation signals and Interlocks Containnent Spray Systea ( In I lo'wp&thS actuation signals ~

included. developaent) and Interlocks.

Contalnaent Spray Systeo Euphasis on operation and EOP-LP-3.13 Specific steps and bases for Prelicense Review response to accidents. FRP J.l, J.2 FRP-J.I. Task required by procedure.

Conte l neent Spray (R086204) Eaphasis on systea oods, operation Requa I I f Ication Training-1986 and Interlocks. RO Hot License Slaulator Scenarios Exercises requiring Spray (In developnent) Actuation.

EOP Review FRP-J.I reviewed.

Prelicense Review EPPs~, 010, 011 Review of steps and bases for SRO Hot License Slnulator Scenarios Cont I nuing Training EPPs 9, 10 d ll (EPP-10 address (In developaent) 1985 Meek I/lesson 3 alignment for recirculation).

CLC-5-3 I Siaulator Scenarios requIring use CLC-5-5-1) p. 11 FRP-J.I or CV Spray.

CLC 6 I I CLC-8-2-2 CLC-8-3-1 SS7221H SS7341H SS7342H Verify AFM Valves properly AFS LP-I.O CLC Systeas Training. Includes AFS-LP 3.0 COC Systeus Training. Includes aligned. Auxiliary FM Systeu flowpaths, interlocks 4 puap Auxiliary FW Systen fiowpaths, interlocks 8 puap operations. (ln developaent) operations.

ESMS-LP-I.O CLC Systeas Training. Eaergency ESM-LP-3.0 CLC Systeus Training Norsal 8 Eoergency Service Mater water source for AFW. Noroal and Energency Service Mater Eaergency source for AFW.

(In developaent)

Auxiliary FW Systea Review of AFW operations. EOP-L.P-3.1 Speclf Ic steps and Bases Prelicense Review Path-l, EPP-004, 008 for Path-1. Task required by (In developaent) procedure.

Aux l I I cry FM Systen (R086205) Interlocks and puap operations RO Hot License Siaulator Scenarios Exercises Involving AFW Requal If ication Training - 1986 exphaslzed. ( In developoent) failures.

4 of 22

ATTACIaIENT F2 EMERGENCY PROCEDURES TASK TRAINING HATR I X Task Task Cold License Training Coooents Hot L I cense Training ~nts Nuuber CLC 3-5-1A . 2-4 Deno on Sl Indications d SRO Hot License Slaulator Scenarios verification. Each trainee ~elks (In developuent.)

through each role. (For scenario with Sl actuation see Task II)

CLC-6-3-1 5 lou l ator Exercises Involving CLC-8-1-1 AFM failures.

SS7342H SS7242H Aligncent of ESW on Safety ESWS-LP-I.O CLC Systeus Training. AI lgnuent ESMS-LP-3.0 COC Systeos Tra I ning. A I I gnnent Injection Norual and Eoergency Service Mater for Sl Included. Norual and Euergency Service Water for SI Included.

(In developnent)

Homal and Energency Service Water Review of SW operation. SEO-LP-3.0 COC Systens Training. List Prelicense Review Safeguards Sequencer couponents started In each Load Block.

Noraal and Euergency Service Mater Flowpaths, puap operations and EOP-LP-3.1 Specific steps and bases for (RQ86213) Inter locks eephas Ized. Path-l, EPP-004, 008 Path-1. Task required by Requallf lcatlon Training-1986 (In developuent) by procedure.

CLC-3-5-1A, pp. 2-4 Deuo on SI Indications and RO Hot License Siuulator Scenarios Exercises with ESW Failures.

Sl Deoonstratlon verification. Each trainee walks (In developoent) through each role. (For scenarios with Sl actuated see Task il). SRO Hot License Siuulator Scenarios (In developnent)

SS7221H Sinulator Exercises with ESM SS7341H failures, SS7421H Halntainlng RCP Seal Injection CVCS-LP-I.O CLC Systens Training. CVCS-LP-3. 0 COC Systens Training. Seal Cheuical Voluue Control Systeu Injection and return f lowpath Cheulcal Volune Control Systeu Injection and return path Included.

Included. (In developnent)

RCP-LP-I.O CLC Systen Training. RCP Seals 6 Reactor Coolant Puups Seal Injection discussed.

5 of 22

ATTACIaIENT l2 EHERGENCV PROCEDURES TASK TRAINING HATR I X Task Task Col d L I cense Training Cacaents Hot License Training Coeaents Nuuber HCD-LP-I .0 . 3-6 Seal De radatlon and ste s RCS-LP-3.0 COC S stens Tralnln . RCP seal Loss of all AC of EPPs-l, 2 8 3 dIscussed. Reactor Coolant Systea construction and operations ~

Task required by EPP-2. 'ncluded.

EOP Revlev Speci f c Steps of EPPs 1,2 6 3 AOP-LP-3.11 Steps for AOP&18, Abnoraal Pre-license Revler discussed. Task required by AOP&18, 030 RCR Operations. Loss of seal EPP-2. (To be developed) InJectlon discussed.

CLC-4-2-1 A Revler of AOP-018, RCP Abnoreal EOP-LP-3.7 Steps and bases for EPPs-001, Ops. Loss of Seal Injection EPP~I, 002, 003 002, 003. Task required by discussed. ( In dave lopaent) EPP-002.

CLOD-5-1 A Revier of AOP-014, Loss ol CCM.

CLC-4-2-18 Sinululator Scenarios Involving RCP HCO-LP 2.9 SRO Hit lgat lng Core Dauage CLC-5 4-18 cooling nalfunctlons. Loss of AI I AC Loss of RCP Seal Cooling CLC-7-2-1 included.

SS7113H SS7142H Siaulator Scenarios ulth Loss RO Hot License Slaulator Scenarios Exercises Involving:

SS742IH Sea I InJect ion. (In developeent) I) RCP seal cooling smalfunctlons

2) Loss of seal injection SS7312H Slaulator Scenario ulth loss of 3) Loss of all AC all AC.

SRO Hot LIcense Sieulator Scenarios (In developoent)

Local ly duuplng stean using HSSS-LP-1.0, Section 2.2.3 CLC Systea Training. HSSS-LP-3.0 COC Systens Training.

S/G PORVs Hain Steaa Supply Systen (Does not address senual ops. Hain Stean Systee of S/G PORV). (In developeent)

HCD-LP-1.3, Section 2.4 FRP-H.1 rev I cued. Copy of EOP-LP-3.10 Specific steps and bases for Loss of Feedvater Induced IOCAs Gener I c MOG Procedure Included. FRP&.1, C.2 and C.3 for FRPs&.I and C.2. Task Task required by procedure. In developuent) required by procedures.

EOP-Review (Handout) Steps and bases revleved for EOP-LP-3.11 Specific steps and bases for Pre-license Reviev FRP-C.I, C.2 d H.l. FRY lg H 2p H 3>> H 4 6 H 5 FRP-H.I. Task required by (In developnent) procedures.

EOP Update Hanual operation of S/G PORVs to HCD-LP-2.1 ICC Indications and stradegles.

Requallflcation Training-1986 be included In Meek III. Smal I Break LOCA ulth NO )ffSI 6 of 22

ATTACWENT l2 ENERGENCY PROCEDURES TASK TRAINING HATR I X Task Task Cold L I cense Training Co>anent s Hot License Training Coeaents Nuaber CLC-8-1-1 8 I au I ator Scenarios I nvolv In use NCO LP 2.3 Reviews Indications and strade ies SS7242H of FPR&.I. Task required by Loss of Feedwater Induced LOCAs for loss of FW by procedure.

85572'IIH Slaulator Scenario Involving use RO Hot License Siaulator Scenarios Exercises Involving:

of FRP-C.2. ( In deva lopaent) I) Use of FRP-C.1

2) Use of FRP-C.2 SRO Hot License Slaulator Scenarios 3) Use of FRP-H.I (In developnent) 4) Local control of S/G PORVs 10 Verify proper operation of SEO-LP-1. 0 CLC Systea Training. SEO-LP-3.0 COC Syste>s Training t

the Sequencer Safeguards Sequencer Safeguards Sequencer Sequences Operations, Review of operations. EOP-LP-3.1 Specific steps and bases for Prelicense Review Path-1, EPP-004, 008 Path-1. Task required by procedure.

EOP Review Steps and bases for EPPs-001, EOP-LP 3.7 Specific steps and bases for Prelicense Review 002 8 003. Task required by EPP~I > 002, 003 EPPs~i, 002 8 003. Task required by procedures. by procedures.

RO Hot License Sluulator Scenarios Exercises Involving (In developuent) I) Loss of off-site power

2) Sl actuation CLC-3-5-1A, pp. 2-4 S I Oea>onstrat ion. Each trainee SRO Hot License Sla>viator Scenarios practices each role. (In developaent)

CLC-3-4-1/3-4-2A Exercises Involving:

CLC-5-5-1 I) Station Blackout w/EOG functioning

2) Loss of AII AC Establ ishlng Hain FW Flow CFW-LP-I.O CLC Systeas Training: CFW-LP-3.0 COC Systeas Training Sections 2.2.6 through 2.2.10, Includes f lowpath, coaponents and Condensate and Feedwater Includes, flowpath, coaponents 2.4.6 through 2.4.10, d 2.4.13 14C. ( In developaent) pars>isslves 6 interlocks.

Condensate and Feedwater FW Systea Flowpath, Interlocks d peralssives EOP-LP-3 11 Specific steps and bases for Continuing Training - 1985 eaphaslzed. FRP H I> H 2> H 3 H 4~ H 5 FRP-H.I. Task required by Week I/Lesson 9 (In developaent) procedure.

7ol 22

ATTA(38(ENT l2 ENERGENCY PROCEDORES TASK TRAINING HATR I X Task Task Cold License Training Comments Hot License Training Comments Number CM) d FW S stem ERA-0IH E10 d Flf Review. Emphasis on valve Prelicense Review Interlocks and permissives.

FW System (RO86201) Emphasis on Interlocks 4 HCO-LP 2.3 Reviews indications and Requa I lfI cat ion Training-1986 perml ss I ves. Loss of FW Induced LOCAs stradegies for loss of FW.

EOP Review (Handout) Bases 8 steps of FRP-H.I reviewed. RO Hot License Simulator Scenarios ExercIses Involving use of Prelicense Review Task required by procedure. ( In development) FRP-H. 1.

CLC-8-1-1 Simulator Scenarios involving use SRO Hot License Simulator ScenarIos SS1242H of FRP-H.I. (In development) 12 Locally tripping turbine EHC-LP-1.0, Section 2.5.1 CLC Systems Training. EHC-LP-3.0 COC Systems Training.

E lectrohydraul ic Control. Includes Hechanlcal Overspeed Eiectrohydraulic Control Includes Mechanical Overspeed Trip Hechanism and local trip. (In development) Trip Nechanism and local trip.

TSAA-LP-1.20, Section 2.7 Bases for FRP-S.I Included. EOP-LP-3.15 Specific steps and bases for Anticipated Transient without Trip. FRP-S I ~ S.2 FRP-S.I (In development)

EOP Review (Handout) Steps for FRP-S.I reviewed. Task Prelicense Review required by procedure.

CLC-2-4-1A, p.4 FRP-S.I reviewed. TdAA-LP-2.14 ATWS analysis Included for Antlclpated Transient without Trip failure of turbine to trip.

(In development)

CLC-8-1-1 Simulator Scenario In which RO Hot License Simulator Scenarios Exercises involving ATWS with turbine falls to trip. (In development) failure of turbine to trip.

SRO Hot License Simulator Scenarios (In development) 13 Local Operation of Swltchgear 6.9 KV-LP-I.O CLC Systems Training and OJT. 6.9KV-LP-3.0 COC Systems Training.

BKRs 6.9 KV Auxiliary 6.9KV Auxiliary 480V-LP-I.O> CLC Systems Training and OJT. 480V-LP-3.0 COC Systems Training.

480V Auxiliary 480V Auxiliary 120VAC-LP-I.O CLC Systems Training and OJT.

208/120 VAC Bof 22

ATTAOaIENT j2 EHERGENCY PROCEDURES TASK TRAINING HATR I X Task Task Cold License Training Comments Hot L I cense Training Comments Number 120V LPS-LP 1.0 CLC S stems Trainln and OJT 120V Un interrupt lb le Power DCP-LP-I.O CLC Systems Training and OJT.

DC Power SACP-LP-I 0 CLC System Training and OJT. 120V LP 3.0 COC Systems Training.

Standby AC Porer Emergency Diesel Generator. 208/120VAC (In development)

SEO-LP-I.O CLC Systems Training. IPS-LP-3. 0 COC Systems Training.

Safeguards Sequencer 120V UPS AOP&evler AOP-025, Loss of one 6.9 KV DCP-LP-3.0 COC Systems Training.

Requal I I lection Training-1986 Emergency Bus or one DC Emergency DC Power Bus. To be covered in Heck III. (In development)

Sequencer Opcratlons, Includes Load shedding PLIS"LP-3.0 COC Systems Training.

Prelicense Revler and reenergizing busses. Plant Light System PZR Heater Operations Prelicense Effects of scquencer Operations SEO-LP-3.0 COC Systems Tra lnlng.

Revlcr on PZR Heater. Safeguards Sequencer Includes Load Shedding and and reenerglzlng busses.

HCD-LP-I 10 EPPs-l, 2 6 3 Reviewed. EOP-LP-3.7 Specific steps and bases Loss ol All AC EPP~I, 002, 003 of EPPs-001, 002 6 003. Task (In development) required by procedure.

AOP-004: Control Room Revler of AOP~4. Malkthrough of AOP-LP-3,12 Steps of AOP-25, Inaccessible ACP 6 Power Supplies. Requires AOP-024x 025 '28, 029 Loss of One 6.9 KV Emergency Prelicense Review operation of swltchgear (To be developed) Bus or One DC Emergency Bus.

AOP~4, (R086210) Review of AOP~4. Requires local RO Hot License Simulator Scenarios Exercises Involving Loss of all AC.

i Requal flection Training - 1986 operation of srltchgear. (In development)

EOP-Revler Includes specific steps of SRO Hot License Simulator Scenarios Prelicense Revler speclf ic steps of EPPs-l, 2 6 3. (In development)

Task required by procedures.

CLC-3-3-2A, pp. 4-8 Simulator Review of EPP-I, 2 6 3. AOP-LP-3.0 Steps and bases of AOP~4.

AOP-004 Requires manual operations of sritchgear.

9 of 22

ATTACHMENT j2 EMERGENCT PROCEDURES TASK TRA I NING MATRI X Task Task Cold License Training Comments Hot License Training Comments Number SS7312H Simulator Scenario with:

SS7121H I) Loss of all AC, or SS7442H 2) Use of AOP-25 SS7342H-14 Check radiation NORMAL for RMS~I.O CLC Systems Training. RMS-LP-3.0 COC Systems Training. Operations RAB, SGs, Secondary and (yaIT Radiation Monitor Ing System Radiation Monitoring System and response to alarmS.

(To be developed)

RM-23, ll 8 80/Gen Atomics Rad Reviews operation and response AOP-LP-3.3 Steps for AOP~5. Response Monitor to alarms. AOP-005 (To be developed) for alarms specified.

Prelicense Review SA)q'P-I.O, pp. 1-19 CLC System Training. I ac I udes SAIS-LP-3.0 COC Systems Tra I ning. Includes Sampling System f Iowpath. Sampling System (In developrent) flowpaths.

CIS-LP-I.O CLC Systems Training. CIS-LP-3.0 COC Systems Training.

Containment Isolation System Lists valves receiving CIAS. Containment Isolation System List valves receiving CIAS.

LWPS-LP-I .0 CLC Systems Training. PASS LP-3 0 COC System Training. Operation of Liquid Waste Processing System, RCB Equipment Drain Subsystem Post Accident Sampling System PASS.

included. ( In development)

Post Accident Sampling System Continuing Training Lesson. LWPS-LP-3.0 COC System Training.

Continuing Training - 1985 Operation of PASS. Llquld Waste Processing System Week 2/Lesson 8 (To be developed)

AOP-LP-3.9 Steps for AOP&16, RCS APP&16, 023, 031 Leakage, including leak (To be 'developed) Identification stradegles.

CLC-1-1-18, p. 6 CLC Simulator/Site Differences RO Hot License Simulator Scenarios Exercises involving use of RMS.

including RMS. (To be developed)

SS7112H, p. 3 PLR Simulator/Std% Differences SRO Hot License Simulator Scenarios, Including RMS. (To be developed)

CLC-3-4-28, pp. 2-5 Review AOP-16, RCS Leakage, including Leak Identification stradegles.

10 of 22

ATTA(ta(ENT l2 ENERGENCY PROCEDURES TASK TRAINING HATR I X Task Task Cold License Training Connents Hot License Training Coeeents Nunber CLC 4-I-IA . 44 Reviers SGTR identification and use of RHS.

CLC-4-4-28 5lnulator Scenarios Inc ludln9 use CLC-7-5-2 of RMS.

CLC-8-I-2 CLC-9-1-1 CLC-9-1-2 CLC-9-2-2 CLC-5-5-2 CLC-6-3-2 CLC-7-2-1 CLC-7-2-2 CLC-8-2-2 SS7251H SS7232H SS7222H SS7211H SS7321H SS7322H SS7331H SS7332H SS7311H SS7442H SS7421H SGTR: Plant Response 15 Identify a Ruptured S/G Continuing Training - 1985 Prlnary and Secondary Response EOP LP-3.1 Spec I f I c steps and bases for Meek I/Lesson 6 to SGTR. Path-2) EPP 016 for Path-2 and EPP&16.

(In developnent) Task required by procedure Path-2/EPP-16 Specific steps and bases for AOP-LP-3.3 Steps and bases for AOP~5, RMS ~

Continuing Training - 1985 Path 2 Including Identi I Ication AORS Includes reponse to RMS alarm.

Meek I/Lesson 7 of ruptured SG. Task required (In developnent) by procedure.

SAI6'-LP-I ~ 0 CLC System Training. AOP-LP-3.9 Steps and bases for AOP-016, Sanpllng Systen AOP&16 ~ 023) 031 RCS I.eakage.

( In deva lopnent) 11 of 22

ATTA(3aIENT l2 EHERGENCy PROCEDURES TASK TRA I NING HATRIX Task Task Cold License Training Cceaents Hot License Training Coerwnts Nueber CLC-3-4-28 . 2 6 3 Revlers AOP-016 RCS Leaks e SOP-LP-3.0 COC S stees Trainln Including aethods of identification. Scapi lng Systen (In developaent)

CLC-4-I-IA Revle<<s SGTR Identification per RO Hot License Slaulator Scenarios Exercises <<Ith SGTRs.

Path-l. ( In deva 1opaent)

CLC 4-4-2 Exercises <<1th SGTR. SRO Hot License SInulator Scenarios CLC-7-5-2 (In developaent)

CLC-8-1-2 CLC-9-1-1 CLC-9-1-2 CLC-9-2-2 SS7251H SS7321H SS7322H SS7331H SS7332H SS7311H SS7442H 16 Requesting saaples froa SOP LP 1.0 CLC Systees Training. Includes SOP-LP 3.0 COC Systee Tra i ning. Includes Cheaistry Saepllng Systea I lo<<paths. Saepling Systen (In developuent) flo<<paths.

SG activity RCS CIS-LP-I.O CLC Systees Tra I ning. L I sts PASS-LP-3.0 COC Systeas Training.

Contalnoent H Contalnaent Isolation Systea valves receiving CIAS. Post AccIdent Saepllng Systeu RCS Boron (In developnent)

Contalnaent Suep LWPS LP 1.0 CLC Systeas Training. CIS-LP-3.0 COC Systen Training.

Liquid Waste Processing Systea Includes RCB Equi pnent Drains Contalneent Isolation Systen Lists valves receiving DIAS.

Subsystea.

GP-LP-1.5, p. 22 Relates that saapling Is done by LWPS-LP-3.0 COC Systees Tralnlng.

cheelstry. Liquid Waste Processing Systea Includes RCB Equlpuent Drains (To be developed) Subsystea.

HCD-LP-2. 7 SRO Hitigatlng Core Daaage HCD-LP-2. 7 SRO Hit lgatlng Core Daaage Post Accident Pri nary Training. Describes changes In Post Accident Prluary Training. Describes changes Radlochealstry RCS chenlstry and personnel Radlocheelstry In RCS cheuistry including hazards. Personnel hazards.

12 of 22

ATTAI3eIENT l2 EHERGENCT PROCEDURES TASK TRAINING HATRIX Task Task Cold License Training Comments Hot License Training Comments Number Post Accident Sam lln S stem Cont I nuln l Train n Lesson. RT LP 3.14 RO Rx Theor Trainln . Includes Continuing Training - 1985 Includes operation of PASS. S/D Reactivity Considerations SDH Calculations.

Week 2/Lesson 8 RO Hot License Simulator Scenarios Simulator Exercises Involving ITo be developed) use of Sampling System.

T6M-LP-).7, Section 2.5 Inc ludes SDM Ca I cu let lons. SRO Hot License Simulator Scenarios Normal Transient Analysis (To be developed)

CLC-7-2-1, pp. 9 6 10 ExercIses ulth failed fuel.

SS7411H Relates that chemistry does sampling.

CLC-4-4-28 Exercises involving uses of CLC-7-5-2 sampling systems.

CLC-8-1-2 CLC 9-1 I CLC-9-1-2 CLC-9-2-2 CLC-5-5-2 CLC-6-3-2 CLC-7-2-1 CLC-7-2-2 CLC-8-2-2 SS7251H SS7232H SS7222H SS7211H SS732IH SS7322H SS7311H SS7442H SS7421H 17 Non itor ing Conditions PZR-I.P-I .0 CLC Systems Training. 16C PZR-LP-3.0 COC System Training. 16C Indicative of PZR PORV Pressurizer included. Pressurizer Included.

Leakage RCS-LP-I.O CLC System Training. PZR and PRT RCS-LP-3.0 COC System Training. PZR Reactor Coolant System 16C included. Reactor Coolant System and PRT 16C Included.

13 of 22

ATTACQIENT l2 EHERGENCV PROCE(XSES TASK TRAINING HATR I X Task Task Cold License Training Coaaents Hot License Tralnlng Gonne nts Nuaber FF-LP-I.I Sect 2.12.2 Isenthal Ic Process discussed FF-LP-3.2 Section 2.5.2 Isentha I Ic Process discussed F I u1 d F low: F lul d Hechan les with exaaples using PZR PORVs Fluid Flow: Fluid Hechanlcs with exaaple using PZR PORVs.

In Pueps and Pipes leakage. In Puup and Pipes CLC-3-3-1A Review of AOP-019, Hal function of AOP-LP-3.10 Steps and bases for AOP-019, of RCS Pressure Control. Includes AOP-017, 019 Halfunctlon of RCS Pressure Indication of PORT leakage. (To be developed) Control. Includes Indlcatlons of PORV Leakage.

CLC-3-4-28 Review of AOP&16, RCS Leakage. AOP-LP-3.9 Steps and bases for AOP-016, AOP-016, 023, 031 RCS Leakage.

CLC-4-5-2 Exercises Involving leaking or RO Hot License Siuulator Scenar los Exercises involving leaking or CLC-5-2-2 open PZR PORV. (In developwent) open PZR PORV.

CLC-7-2-2 CLC-8-1-2 SRO Hot License Slsulator Scenarios SS7332H (In developwent) 18 Establish Auxiliary Spray CVCS-LP-I.O CLC Systees Training. Flowpaths CVCS-LP-3.0 COC Systeas Training. F lowpaths Cheul eel Vol uwe Control Systea Included. Cheuical Voluce Control Systeu I nc I u dad.

(In developaent)

PZR-LP-1. 0 CLC Systees Training. Aux I I I sry PZR-LP-3.0 COC Systeas Training. Aux Spray Pressurizer Spray Included. Pressurizer Included.

EPP&22 Specific steps and bases for Continuing Training - 1985 EPP&22. Task required by EOP-LP-3. 6 Specific steps and bases for Meek 2/Lesson 5 procedure. EPP~5, 006, 007 EPPs-22. Task required (In developuent) by procedure.

EPPs-005,006 d 007 Specific steps and bases for Continuing Training - 1985 EPPs-005, 006 d 007. Natural EOP-LP-3.8 Specific steps and bases for Meek 2/Lesson 6 circulation cooldown requires EPPES, 006, 007 EPPs-005, 006 4 007. N.C.

auxiliary spray, (In developuent) cooldown requires auxiliary spray, GP-LP-1.7 Steps include use of auxiliary GP-LP-3.7 Steps include use of auxiliary Noraal Plant Cooldown spray. Norcal Plant Cooldown spray.

14 of 22

1 ATTACHMENT J2 EMERGENCY PROCEDURES TASK TRAINING MATRI X Task Task Cold License Training Coon>>nts Hot License Training Coca>>nts Nueber CLC-2-3 Exercises Involvin use of CLC-9-2-1 auxiliary spray.

SS7121H SS7151H CLC-9-1-2 Exercises requiring use of SS7311H EPP-22.

19 Local tripping of Rx Trip RODCS-LP-I.O, Section 2.4.6 CLC Systeas Training. RODCS-LP-3. 0 COC Systeas Training.

Bkrs and MG sets Rod Control Systeo Rod Control Systea (In developuent)

EOP-Review (Handout) Steps and bases for FRP-S.I. EOP-LP-3. 15 Specific steps and bases Pre-license Review Task required by procedure FRP-S I, S.2 for FRP-S.I. Task required by procedure.

CLC-2-4-IA Review of FRP-S.I. RO Hot License Slaulator Scenarios Exercises using FRP-S.I.

(In develops>>nt)

CLC-2-5-28 Exercises Involving use of SRO Hot License Slaulator Scenarios CLC-4-2-18 FRP-S.I. (In develops>>nt)

CLC-4-3 IB/4-3 2 CLC-6-2 CLC-8-1-1 Verification of C alT CVS-LP-I.O CLC Systems Training. Response CVS-LP-3.0 COC Systeas Training. Response I sol at I on

'o Contains>>nt Ventilation Systeu to DIAS Included. Contalnaent Ventilation Systea DIAS Included.

CAPES-LP-I .0 CLC Systeos Tra I ning. Response CIS-LP-3.0 COC Systeas Training. List of Contalnuent Atoosphere Purge and to CIAS Included. valves receiving CIAS included.

Exhaust C IS-I.P-I .0 CLC Systeos Training. List of EOP-LP-3. 12 Specific steps and bases of Contains>>nt Isolation Systea valves receiving DIAS included. FRP-I.I, 1.2, 1.3 FRP-I.3. Task required by procedure.

Contalna>>nt Ventilation Systeo Includes operations and Plant Nods. RO Hot License Slaulator Scenarios Exercises with Sl actuation.

Prelicense Review (In developaent) (See Task 4'I).

EOP-Rev I ex Specific steps for FRP-I.3 SRO Hot License Slaulator Scenarios Prelicense Review discussed. Task required by (In develops>>nt) procedure.

15 of 22

ATTA(3a(ENT l2 EMERGENCY PROCEDURES TASK TRAINING MATRI X Task Task Cold License Training Coeednts Hot License Training Coeecnts Nueber CLC-3-5-IA Sl Dceonstrntion. Each trainee walks through each role for Sl actuation. (See Task ll for exercises with Sl actuation).

21 Establ lshing Blowdown froe SGBS-LP-I .0 CLC Systees Training. SGBS-LP-3.0 COC Systees Training.

S/Gs. 8/G B lowdown Systee S/G Blordown Systee SG-LP-I.O CLC Systees Training. SG-LP-3.0 COC Systees Training.

Stean Generator Stead Generators EPPs-017, 018, 019 Steps and bases of EPP418 reviered. EOP-LP-3.11 Specific steps nnd bases for i

Continuing Tra ning-1985 BD used to depressurize ruptured FRY.I, H.2, H.3, H.4 4 H.5 FRP-H.5. Task required by Mack I/Lesson 8 S/G. procedure.

EOP-Review (Handout) Steps for FRY.5, Reponse to S/G Prelicense Revier High Level. Task required by procedure.

22 Try to Identify 8 Isolate lenk CLC-3-4-28, pp. 2 d 3 Rcvldw of AOP 16'CS Ldakage, and EOP-LP-3.5 Specific steps and bases for discussion ot edthods of Identifying EPPs-20 4 21 tor EPP-20. Task required leakage (In developednt) by procedure.

RMS-HO- I . 0 CLC Systces Training. RMS-LP-3.0 COC Systees Training.

Radiation Honltorlng Systee RMS used In leak Identltication; (In developeent)

RM-23, 11 6 80/Gen Atoelc Rnd Operation ot RMS rdvldred. Haik AOP-LP-3.9 Steps for AOP-16, RCS Leakage.

Monitors through Included. AOPs&16, 023, 031 Leak identification strategies Prelicense Revier (To be developed) included.

EPP-20 d 21 Specific Steps of EPPs-20. AOP-LP-3.3 Steps tor AOP~5 ~ RHSr Cont inuing Train 1ng-1985 Task required by procedure. AOP-005 (To be developed) Response tor alares specified.

t iteck 2/Lesson 4 CLC-7-5-2 Sleulator Scenarios in which RO Hot License Sleuiator Scenarios Exercises requiring use ot CLC-8-1-2 EPP-20 iep leeentcd. (In developeent) EPP-20.

CLC-9-2-2 SS7322H SRO Hot License Sleulator Scenarios 557331M (In developeent) 16 of 22

ATTA(38IENT l2 'ENERGENCT PROCE(XSIES TASK TRAINING HATRIX Task Task Cold License Training Coaaents Hot License Training Cccuxants Nu88er Ninlalze secondhr SGTR: Radial Ical Conse uences Includes nechanl sos of radionucl Id@ EOP-LP-3.2 S eclfic ste s and bases for coatee I n at I on Continuing Training - 1985 transport and actions to minlelze. Path-2/EPP-16 (In developuent) Path-2. Task requIred by Week I/Lesson 3 procedure.

RM-23, ll 6 80/Gen Atoalcs Rad AOP-LP-3.3 Steps revle<<ed for AOP-005.

Monitor AOP~5 AOP-005 Includes actions that Prelicense Revle<< minimize contaalnatlon HSSS-LP-I.O CLC Systees Training. HSSS-LP-3.0 CLC Systeas Training.

Hain Stean Systea Secondary Systees effected by Nein Stean Systea Secondary Systees potentially contaalnatlon. Kno<<ledge of effected by contaulnation.

flo<<paths aids operator In taking Kno<<ledge of flo<<paths aids action to accoapllsh task. operator In taking action to acccepllsh task.

SDS-LP-I.O SDS-LP-3.0 Stean Duup Systen Stean Duep Systeu CFW-LP-I .0 CFW-LP-3.0 (28) and FW Systeas (28) and F'W Systees HSR LP-I.O HSR LP 3.0 HSR d FW HTRS NSR and FW HTRS HOES-LP-I.O HOES-LP-3.0 Main Condenser Evacuation Systea Main Condenser Evacuation Systea NTSS-LP-I.D HTSS-LP-3.0 Hain Turbine Sealing Stean and Hain Turbine Sealing Stean and Exhaust Exhaust CPDS LP I.O CPDS-LP-3.0 Condensate Pollshln9 6 Condensate Pol l shing 8 Denineral Izing Dealneralizlng Systea Systea Path-2/EPP-016 Continuing Training - 1985 Specific steps and bases for RO Hot License Siaulator Scenarios Exercises <<Ith SGTRs.

Week I/Lesson 7 Path-2. Task required by procedure. ( In developoent)

EOP Update Actions added to procedures SRO Hot License Siaulator Scenarios Requallficatlon Training-1986 discussed. Included In Week III. ( In developeent) 17 of 22

ATTAOaIENT l2 EHERGENCT PROCEDURES TASK TRAINING HATR I X Task Task Cold License Training Contents Hot License Training Coeaents Nuuber CLC-4-4-2 Exercises Involvin SGTRs. RWO al Cards Ste s to:

CLC-7-5-2 CLC-9-1-1 Involves a SGTR with the I) OC 05.84H Perforaance 111.15 I) Isolate Hain Stean to Auxiliary CLC-8-1-2 associated HSIV stuck open. Path-2 2) OC 08.80H Perforfssnce 111.5 Stean CLC-9-1-1 specifies actions that einlulzes 2) Place ChD Polishing Systea In CLC-9-1-2 secondary contaulnatlon for that service CLC-9-2-2 situation. Soee of the actions are SS7251H applicable for SGTRs In general.

SS7321H AO Oual Card Steps to:

SS7322H I) Isolate Hain Stean to Auxiliary SS7331H Steaa SS7332H 2) Isolate Hotwell spillover to SS7311H CST SS7442H 3) Place CVPETS In service 24 Evaluate Plant Status GP-LP-I.O, Sections 2.24 8 2.25 Procedures Training on Conduct of PP-LP-3.0 RO Procedures Training. 0 af-),

Conduct of Operations Operations. Continual evaluation of 0M~I, 009 Conduct of Operations, discusses plant status and use of redundant Continual evaluation of plant instruuentation ls enphaslzed. status and euphaslzes use of redundant Instruaent.

CLC-1-1-2, pp. 2-5 Conduct of Operations Reviewed. ADOP-LP-2.0, SRO Advanced Operating Procedures SRO Duties and Responsibilities Training. Conduct of Operations Cover sheet for siaulator Exercise Evaluates shift Conduct of revle<<ed.

Guides Operation for each exercise.

HCD-LP-I. I Hit lgatlng Cora Dauage Course CO-LP-2.) Hitlgatlng Core Daaage Course Post Accident Cooling describes: Post Accident Cooling describes:

I) plant response to accidents I) plant response to accidents

2) strategies for assessing dauage 2) strategies for assessing de<<age
3) strategies for recovery 3) strategies for recovery
4) equlpuent required to lapleeent 4) equip<<ant required to lapleuent recovery strategIes recovery strategies HCO-LP-1.2 HCD-LP-2.2 Snail Bkr LOCA <<1th no IaISI Seal l Bkr LOCA <<1th no HISI HCD-LP-1. 3 HCD-LP 2.3 Loss of FW Induced LOCAs Loss of FW Induced LOCA HCO-LP-1. 4 HCO-LP-2. 4 Vita I Process Instruuentat ion Vital Process Instruuentation 18 of 22

ATTACfaIENT l2 EHERGENCY PROCEDURES TASK TRA I NING HATRI X Task Task Cold License Training Coceents Hot License Training Ccneents Nuober HCO LP-1.5 HCO-LP-2 5 Accident Response of Incore Accident Response of Incore Instruuentatlon Instrunentatlon HCO-LP-I.6 HCO-LP-2.6 Accident Response of Excore A<<cldent Response of Excore Instrunentatlon Instruuentatlon HCO-LP-1.7 HCO-LP-2.7 Post Accident Priaary Radlocheulstry Post Accident Pr leery Radiocheulstry HCO-LP- I . 8 HCO LP-2.8 Radloioglca I Aspects of Core Dauage Radiological Aspects of Core Danage HCD-LP- I . 9 HCD-LP 2 9 Loss of AII AC Po>>er Loss of All AC Po>>er HCO-LP-I . 10 Class 9 Events HCO LP I 11 Instrunent Oualif Ication and Accident Response EOP&20 8 021 Continuing Training - 1985 Steps and bases for EPP-20. EOP-LP-3.5 Specific steps and bases for Meek 2/Lesson 4 Task required by procedure. EPPs&20, 021 EPP-020. Task required by procedure.

CLC-7-5-2 8lnulator Scenarios requiring use RO Hot License Sluulator Scenarios Exercises Involving EPP-020.

CLC-8 1-2 of EPP-20. (Note: A lnost a I I (In developnent) (Note: Alnost all sieuator CLC-9-2-2 sloulator exercises requIre use exercises require use of task.)

$ $ 7322H of task). SRO Hot License Slnulator Scenarios

$ $ 7331H ( In developnent) 25 Evaluate Plant Equi puent CLC Systens Training Operations of all systeo covered In COC Systens Training Operations of all systens, Continuing Training - 1985 CLC Training. Revle>>s and updates Including the Operating Pre I I cense Rev le>> Tra I ning covered In Continuing Training, Procedures, covered in COC Requa I i f I cation Training-1986 Prelicense Revle>> and Requalif ication Training.

Training.

19 of 22

t

'1

,C

ATTACISIENT d2 EMERGENCY PROCEDURES TASK TRAINING MATRIX Task Task Cold License Training Coonents Hot License Training Coooents Nuober HCO-LP-I.I Hltl atln Core Dana e Course MCO-LP 2.1 Hlti atln Core Dana e Course Post Accident Cooling describesl Post Accident Cooling descrlbesl I) plant response to accidents I) plant response to accidents

2) strategies for assessing daoago 2) strategies fol assessing danago
3) strategies for recovery 3) stl'atogios for l'ecovel y
4) equlpoont required to inpleoont 4) equlpeent required to lnpleoent recovery strategies recovery strategies MCO-LP-1. 2 HCO-LP-2. 2 Seal I Bkr LOCA with no ISISI Seal I Bkr LOCA xlth no HISI HCO-LP-I . 3 HCO-LP-2. 3 Loss of FW Induced LOCAs Loss of FM Induced LOCA MCO-LP 1.4 MCO-LP-2. 4 Vital Process Instrueentat ion Vital Process I nstruoentat ion HCO-LP- I . 5 MCO-LP-2.5, Accident Response of Incore Accident Response of Incore Instruoentatlon Instruwentat ion HCO-LP-I . 6 HCD-LP-2. 6 Accident Response of Excore Accident Response of Excore Instruoentatlon .Instruoentatlon HCO-LP-1.7 HCO-LP-2. 7 Post Accident Prlnary Radlocheslstry Post Accident Pr leery Radiocheolstry HCO-LP-1.8 HCO-LP-2. 8 Radiological Aspects of Core Danage Radiological Aspects of Core Daoage HCO-LP-1.9 HCO-LP 2.9 Loss of All AC Power Loss of All AC Poxer HCO-LP-1. 10 Class 9 Events MCO-LP-1. 11 Instrunent Oval lf lcatlon and Accident Response 20 of 22

ATTA(3CIENT l2 EMERGENCY PROCE(WAS TASK TRAINING HATR I X Task Task Cold License Training Cocrrents Hot License Training Cocracnts Nucbcr EPP~ 6 021 Ste s and bases of EPP-20.

Continuing Training - 1985 Task required by procedure.

'Week 2/Lesson 4 SS7114H Sirrufator Scenarios Involving EOP-LP-3.5 Specific steps and bases for SS7121H sultiple failures of IWR, CCW, etc. EPP&20, 021 EPP-20. Task required by procedure.

Operators are required to evaluate (ln developccnt) equlprrent status and Initiate recovery <<1th available systecs.

CLC-7-5-2 Slsulstor Scenarios In <<hlch SRO Hot License Slrsulator Scenarios CLC-8-1-2 EPP-20 Is required. (Note: Afcost (In developcent)

CLC-9-2-2 all slsvlstor exercises require task.)

26 Start additional plant CLC Systcsrs Training Each accident requires operation COC Systcrrrs Training Each accident requires s unique equlpcent to assist In of s unique sct of systccs. Any set of systecs be put Into recovery systcs that aright be required ls operation. Any systcrs that eight taught In systecs training. be required is taught In COC Systecs Training Including associated OPs and AOPs, HCO-LP-1. I Hit i gating Core Oacage Course HCO-LP-2. I Mitigating Core Oacage Course Post Accident Cooling describes: Post Accident Cooling descrlbesr I) plant response to accidents I) plant response to accidents

2) strategies for assessing dacage 2) strategies fol'ssessing dscage
3) strategies for recovery 3) strategies for recovery
4) eqvlpcent required to lsrplcccnt 4) equlpcent required to Isplecent recovery strategies recovery strategies MCO-LP-I 2 HCO-LP-2 2 Seal I Bkr LOCA <<Ith no ICISI Seel I Bkr LOCA <<1th no ISISI HCO-LP-1. 3 HCO-LP-2. 3 loss of FW Induced LOCAs loss of FW Induced LOCA MCO-LP- I, 4 HCO-LP-2. 4 Vital Process Instruccntstion Vital Process I nstrurrentat ion HCO-LP-I 5 HCO-LP-2. 5 Accident Response of Incore Accident Response of Incore Instrucentation Instruoentatlon 21 of 22

ATTACWENT l2 ENERGENCY PROCEDURES TASK TRAINING HATR I X Task Tas'k Cold License Training Coooents Hot License Training Conments Nunber HCD-LP-1.6 HCO-LP-2.6 Accident Response of Excore Accident Response of Excore Instrusentatfon Instrunentatlon HCO-LP-1. 7 NCO-LP-2. 7 Post Accident Prlnary Radiochenlstry Post Accident Prinary Radlochexl stry HCD-LP-1. 8 HCD-LP-2. 8 Radiological Aspects of Cote Danage Radiological Aspects of Core Danage HCO-LP-I.9 HCO-LP-2.9 Loss of All AC Power Loss of All AC Power HCO-LP-1.10 Class 9 Events HCD-LP-1. I I Instrunent Oval I f I cation and Accident Response EPP-20 Specific steps of EPP-20.

Continuing Training Tasks required by procedure.

Meek 2/Lesson 4 SS7114H Six(viator Scenarios Involving EOP-LP-3.5 Specific steps and bases for SS712'IH aultlple failures of 18R, CCII, EPP-20 6 '21 EPP-20. Tasks required for t etc. Operators are required to ( In developnent) procedure.

evaluate plant status and initiate recovery with available systeas. RO Hot License Sinulator Scenerios Exercises requiring use of (In developnent) EPP-20. (Host sinulator scenarios CLC-7-52 Sinulator scenarios In which require task).

EPP-20 Inple((ented. (Host six(ulator scenarios require task).

CLC-8-1-2 SRO Hot LIcense Sinulator Scenarios CLC-9-2-2 (In developnent)

SS7322H SS7331H 22 of 22

ATTACHMENT 3 ADDITIONAL COLD LICENSE TRAINING Task Comments Locally Dumping steam Manual operation of S/G PORVs will be using S/G PORVs described and procedure reviewed. A walkthough of operations will be conducted.

Local operations on the S/G PORV have been incorporated into the applicable nonlicense Qualification Card.

, Minimize Secondary , Actions that are being incorporated in the Contamination revised EOPs will be described. Manual actions that .require local operations have been incorporated into the applicable non-licensed Qualification Cards.

Local Operation of Electrical plant response to SI and LOSP Switchgear BKRs will be discussed including requirement to monitor conditions and manipulate switchgear

l

\

V tl "I 8 I

~1

't:

4~

W P

I II P

II 4

b

ATTACHMENT4.

SCENARIOS

-'IMULATOR

1. CLCL-7-2-2: Load Rejection/ATWS/RCS Depressurization
2. CLCL-7-5-2: S/G Tube Leak/Rupture/ATWS/S/G =PORV Failed Open
3. SS7421H: Inadvertent SI/SW Malfunctions/LOCA without CSIPs

.g 't A

g t

II la P

II K

\

II t

iW

11/10/83 SHNPP SIMULATOR EXERCI IDE EXERCISE: Load Rej ecti on/ATWS/RCS FILE NO. CLC-7-2-2 TIME: 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Depressur ization conpletion of this exercise, the student will be able to:

OMECTIVES: .Upon limits.

0 I t 12 tl 10 I 2 01

2. Take appropriate actions on load rejection without steam dumps to stabilize plant in a safe condition.
3. Identify an ATWS event and take actions to prevent core damage and radioactive releases to the environment.
4. Identify a failed open PZR PORV and take corrective actions to stop RCS depressurization.

RELATED LER's, UER's, POER's, etc:

a em P , - Breakers failed open (UV part of mechanical latch)

INITIAL CONDITIONS: IC-7 (BOL) . Present Previous resent power ours PMR TEE 571 Tav 586 875 BoNn 839 174 D Rod Hgt 208 0 Ilppp..

INSTRUCTOR GUIDE:

charging flow to increase.

I 20 1002. I'I-122A I ll CSIP failure requires placing "C" pump in service.

External load breakers opening with no auto dumps should cause reactor first out (Lo-Lo S/G Lvl). ATWS causes RCS pressure to increase. When spray valves open, fail PCY-444B open. (Note: Do not trip R remotely until PORV opened). RCS will become saturated and remain saturated until block valve closed. Allow block valve to close after ISC and maintenance investigates. (Upon completion of exercise, reset for shift turnover per CLC-7-2-1).

SHIFT TURNOVER to or feed INFORMATION'crease power pump maintenance. Feed pump tested and running.

MALFUNCTIONS OVERRIDES REMOTE OPS T-O All Auto Reactor Tr p T- PZR PORV Iso Vl v Functions (Disabled) 8000C (Open)

T-0 Auto Steam Dump Con- T-50 FI-122 A Charging troller ( Inhibited) 'eader Flow (Low)

T-0 Manual Reactor Trips T-90 Charging Pump "A" (Disabled) (Stop)

T-120 External Load Breakers T-VAR PCV-444B Pressurizer 52-8 5 52-9 (Open) Relief Valve (Open Fail when sprays open)

L A C arg ng F ow - Transmitter failure Char ging Pump "A" .- Motor bearing seized External Load Breakers - Phase differential relay PCV-4448 - Controller failure/valve jammed on backseat Block Valve - Breaker tripped (overcur rent relay failed)

ATWS - Trip breaker binding/improper lubrication EXPECTED RESPONSE: AS PER SERIAL RELATED CHECKOFF REQUIREMENTS: 5B, SD, 17, 18, 19, 8, 10, 16, 20, 21, 23, 24

\

lg J~i tb l

v (I0 l~

SINJLATOR EXERCISE PERFORNHCE/OBSERVATION RECORD Course Group Oata Instructors Gradings: S = Satisfactory U Unsatisfactory I. Exercise A. Initial Conditions/Scenario - exercise guide B. Shift Assignments R S/U p Manipulations Per. Su Per. Su .

SF

2. SRO
3. RO BOP
5. STA I I. Evaluation SRO RO BOP STA A. General
1. Supervisory ability--
a. Effective supervision of others
b. Effective direction of other
2. Operator communications passes along information accurately and promptly
3. Annunciator response immediately responds uses alarm procedure
4. Use of procedures pulls procedure and utilizes
5. Systematic and logical approach to pr obl ems
6. a. Attentive to instrumentation and controls
b. Compares redundant channels
c. Compares meter to recorder
7.

Alertness aware of plant status at all times B. Shift Turnover

1. Oral turnover

'2. Hourly logs 3~ Review control. board 4~ Test annunciator lights

I

-(fl I

l.

Rev. 1 11/10/83 FILE NO: CLC-7-2-2 C. Exercise Performance SF SRO RO BOP

1. Power Escalation 50% to 100%
a. a ntains avg ref
b. Turbine Load Limits C ~ Generator Loading (MVARs)
d. S/G Level Control
e. MSR Operation
f. Maintains CAOC go Anticipates Xenon Transients
h. Uses Curves Secondary Calorimetric at 90%
2. Char in Flow Indicator Failure(low)

Imme ate Act ons (1) Identifies Charging Flow Low (2) Identifies Charging Pump Running (3) Verifies PZR Level Increasing (4) Takes Manual Control of FCV-122 Subsequent Actions (1) Stabilizes Plant (2) Maintains RZR Programmed Level (3) Investigates Cause

3. Char in Pum "A'ri mme >a e c ons (1) Acknowledge Annunciators (2) Starts "B" Pump Subsequent Actions (1) Stabilizes Plant With PZR Level In Band (2) Refers to Tech Specs (3 ) Investigates Cause (4) Initiates Request to Place "C" Pump in Service
4. Generator Breakers 0 n a ~ ent cat on (1) Generator Output OCBs Open (2) Rapid Load Decrease to Unit Auxiliary Loads (3) Increased S/G Pressure (4) Inward Rod Motion
b. Immediate Actions (1) Verifies Automatic Actions (2) Observes Failure of Steam Dumps (3) Verifies S/G PORVs Open (4) Refers to AOP-15 (5) Places Steam Dumps in Pressure Control c~ Subsequent Actions (1) Stablilizes Plant '

(2) Investigates Cause

Rev. 1 11/10/83 File No. CLC-7 C. Exercise Performance (continued) SRD RD BOP ST (3) Transfers Aux Loads (4) Identifies ATNS

5. ATMS
a. Immediate Actions (1) Attempts To manually Trip Rx (2) Drives Rods In (3) Sends Personnel To (a) Trip MG Sets (b) Trip R Trip Breakers

.(c) Trip M3 Set Supply Breakers (4) Emergency Borate (5) Refers to FPP-1, FPP-2, or FRP-S.1

b. Subsequent Actions (1) Investigate Cause (2) Initiates

'I PEP (Alert)

6. Reactor Tri a ~ mme ate Actions (1) Verifies R Trip (2) Verifies Turbine Trip (3) Checks Power to AC Emergency Buses (4) Checks SI Actuated (5) Refers to FPP-1 or FPP-2
b. Subsequent Actions (1) Verifies Plant Parameters Stablilizing at No-load Values (a) T (b) S/PLevel (c) PZR Pressure and Level (2) Conducts "Dead-Bus" Transfer to S/U Transformers (3) Verifies Source Range Energized (4) Secures Unnecessary Equipment (5) Stabilizes Plant at No-load Conditions
7. PZR PORV Failure a ~

(1) PZR Pressure Decreasing (2) Relief Line Temp Increase/Alarm PORV Indicates

'3)

Open (4) PRT Parameters Increasing (5) PZR Sprays Indicate Open b ~ Immediate Actions (1) Attemps To Close Block PORV (2) Energizes Heaters (3) Refers to AOP-19 (4) Observes SI Initiates

I C

J

Rev. 1 11/10/83 File No. CLC-7-2-2 C. Exercise Performance (continued) SRD RD BOP STA

c. Subsequent Actions (1) Investigates Failure of Block Val ve (2) C1oses after IAC Repair
8. Safet Injection
a. e ers to -1 or FPP-2
b. Performs Imaediate Actions
c. Stops RCPs (1400 psig)
d. Verifies Plant Recovery
e. Identifies Cause
f. Terminates SI Mhen Criteria Met
9. Natural Circulation
a. ent cat on (1) No RCPs Running (2) Heat Sink Available
b. Subsequent Actions (1) Refer To EPP-5 (2) S/G Press < 1110 psig (3) ,RCS 40'F (4) RCS h T < 60'F
10. Added Malfunctions a.

b.

c~

d.

Rev. 0 4/12/84 FILE NO. CLC-7-5-2 C. Exercise Performance (continued) SF SRO RO BOP

5. S/G Tube Leak

( 1) Increased Charging Flow (2) Leak Rate OST Performed (3) RMS increase R-19 (4) Performs Leak Isolation or Identifies Source (5) Checks all Instrumentation

b. Immediate Actions

( 1) Determines Appropriate S/G (2) Checks Tech Specs (3) Commences Rx S/D (4) Shifts Condenser Exhaust

-(5) Refers to AOP-16 (6) Observes Blowdown Isolated 6 ATWS

a. Immediate Actions (1) Attempts to Manually Trip Rx (2) Drives Rods In (3) Sends Personnel to Trip Rx Breakers (4) Emergency Borate (5) Refers to FRP-S.1
b. Subsequent Actions (1) Investi gates

~li Cause (2) Initiates PEP (Alert) 7.

a. Immed>ate Actions (1) Verifies Rx Trip (2) Veri fi es Turbine Tri p (3) Checks Power to AC Emergency Buses (4) Checks SI actuated (5) Refers to FPP-1 or FPP-2
b. Subsequent Actions

( 1) Verifies Plant Parameters Stabilizing at No-load values (a)

(b) S/G level (c) PZR Pressure and Level (2) Verifies Transfer to SU Transformers (3) Verifies Source Range Energized (4) Secures. Unnecessary Equipment (5) Stabilizes Plant at No-load Conditions

I I

'\

'1 1

t>)

h'

Rev. 0 4/12/84 F ILE NO. CLC-7-5-2 C. Exerci se. Performance (continued) SF SRO RO BOP

c. Initiates PEP (unusual event)
8. Safety Injection/S/G PORV Failed en
a. Comp etes Immediate Actions o FPP-1 or FPP-2 (1) Identifies RHR Pump A Tripped (2) Restarts RHR Pump A
b. Identifies SGTR as Cause
c. Identifies Ruptured S/G
d. Isolates Ruptured S/G
e. Identifies S/G PORV Failed Open
f. Begins RCS Depressurization and .

Cooldown

g. Maintains Ruptured S/G Level Between 10% and 50%
h. Implements FPP-17 (1) Resets SI/Phase A (2) Cooldowns to 200'F at

< 100'F/hour (3) Depressurizes to Minimize RCS Subcooling at 40'F (4) Maintains PZR Level (5) Terminates SI (6) Restores LP and Charging (7) Isolates Accumulator

9. Intermediate Range Undercom ensated
a. Ident> ies Undercompensat>on
b. Manually Energizes Sources Ranges
10. Added Nalfunctions a 0 b.

l I llII

~ P

}2 44

0. iaalator Exercise Comments:

NTS/AI-26

C I

f 0

P I' ll II

.I <* 'hl r k

'4

'k, I

E. . xerc3se Critique:

. ~ SF - S/U BOP - S/U SRO - S/U STA - S/U RO - S/U Overall Group Eval. - S/U F. Student Comnents/Sfaalator Improvement:

Instructor' Signature HTS/AI-26 14 Rev. I

C

~ ~

t V~

l X;~

jt ~

e n I

~

g SHNPP SIMULATOR EXERCIS UIDE EXERCISE: Inadvertent SI/SW Malfunctions LESSON CODE: SS7421H LOCA W/0 CSIPs OBJECTIVES: Upon completion of this exercise, the student will be able to:

1. Perform the immediate actions required of operators following a Rx trip and SI.

Use the EOP network inclusive of the Flow Paths, End Path Procedures and Foldouts to direct operator actions.

3. Complete the appropriate attachments of OMM-004 following an activation of the ESFAS.
4. Identify a need to and make notifications required by the PEP.
5. Identify a stuck control rod and make required adjustments in shutdown margin.
6. Use AOP-001 to correct for a stuck control rod.

I

7. Use available MCB indications plus requested information to identify a lealC.

from the CCW to ESW system.

8. Use OWPs to place the protective cabinets in the correct alignment as required by Tech Specs following an instrument failure.
9. Detect and take corrective action for a failure of the steam dumps to control temperature.
10. Use EPP-001 to mitigate the consequences of a loss of both CSIPs in conjunction with a small break LOCA.

INITIAL CONDITIONS: IC 43 ( ) Present Previous Present conditions for: )100 Hrs ~100 PWR 588'F, Tav same 527ppm Bar30 "D" at 192 steps Rod Hgt.

SHIFT TURNOVER INFORMATION: Presently on line within one day of exceeding CPELs Nuclear on-line record. No surveillances scheduled. No testing allowed. Anticipate no changes CSIP under clearance for bearing replacement.

"C" CSIP will be available in six hours, two hours into action statement.

INSTRUCTOR GUIDE: Reset to IC 43, reboot RMS, ERF IS and conduct shift turnover. With lamp test complete override the Vacuum pump trip alarms to off and the operating vacuum pump red light to "on". Fail the operating vacuum

'pump. When requested, report the motor operating but' drastic drop in noise level (coupling sheared). With stability restored insert the inadvertent SI.

After restoration have the SF complete an OMM-004. With this report ongoing insert the CCW-ESW leak. With trouble shooting ongoing and temperature restored to 557 fail P-12. Allow both conditions to run their course and be corrected. With all systems restored to normal fail the operating CSIP. Give time for immediate action and fail the seal stack on any RCP (insert ~ 100 gpm leak to provide the leakage of the seal failure). If EPP-001 not addressed the instructor should prod in that direction before the situation degrades too far.

P~

'1 l t 1

r, 4

I. S aM

MALFUNCTIONS OVERRIDES REMOTE OPS.

T-0 CRF3A untripable for P-8 T-0 CRF3A untripable for K-14 T-15 CND4A(B) to active T-O CND 94 (99) to low T-0 CSIP racking T-30 SIS 1 to activate T-0 CND 104 to low status T-75 CCW 3 to 30 gpm T-0 CNE 28 (29) D to "hi" T-90 MSS9 to fail .

T-120 CVC 5 for operating unit TVAR RCS14A(B)(C) to 60 gpm TVAR RCS15A(B) (C)

TVAR RCS16A(B) (C)

SUPPLEMENTAL INFORMATION:

Inadvertent SI to ensure completion of OMM-004 prior to Exam.

2. Vacuum Pump coupling break occurred at HBR.
3. Loss of both CSIPs to use EPP-001 for this condition.

EXPECTED RESPONSE: AS PER SERIAL RELATED CHECKOFF SUCCESSFUL COMPLETION OF THIS EXERCISE FULFILLS THE FOLLOWING NRC AND INPO REQUIREMENTS: 5C, 11, 17, 19, 24

er I-I t

htg Cia

~ 'P S J

~ 4~

. ~

SIMULATOR EXERCISE PERFORMANCE/OBSERVATION RECORG Cour se Group Oate Instructors Gradfngs: S Satisfactory O'nsatisfactory I. Exercf se A. Initial Condftfons/Scenario - exercise guide B. Shfft Assignments x S U Per. U ~ Per. S~

1. SF
2. SRO
3. RO
4. BOP
5. STA II. Evaluation SF SRQ RO BOP ST A. General
1. Supervisory ability-
a. Effective supervision of others
b. Effective direction of others
2. Operator coamunfcatfons passes along information accurately and promptly
3. Annunciator response-fmmedfately responds uses alarm procedure
4. Use of procedures pulls procedure and utilizes
5. Sytematfc and logical approach to problems
6. a. Attentive to fnstrumentatfon and controls
b. Compares'redundant channels
c. Compares meter to recorder
7. Alertness aware of plant status at all times B. Shift Turnover
1. Oral turnover
2. Hour ly logs
3. Review control board
4. Test annunciator lights

~g I~

I

-l

'lP

)gal T

~\

~ ~+

Rev. 0 LESSON COOE: SS7421H C. Exercise Performance SF SRO RO BOP Loss of Condenser Vacuum

a. Notes change in efficiency,'reports same and'nvestigates
b. Notes change in condenser vacuum and performs immediate actions-of AOP-012
c. Refers to AOP-012 for auto and immediate action verification
d. Performs follow-up action of AOP-012
e. Request sufficient information of A.O. to diagnose problem
f. Initiates corrective maintenance
g. Makes notifications required
2. Inadvertent SI
a. Recognizes condition and takes appropriate immediate actions
b. Uses EOP path 1 for action verification
c. Recognizes SI termination criteria
d. Address foldout A and B of EOP network
e. Terminates SI IAW EPP-004
f. Initiates investigation
g. Performs required administrative duties
h. Address PEP and make notifications
i. Performs required portions of OMM-004
3. Stuck Rods
a. Recognizes mispositioned control rods
b. Recognizes SI flow sufficient to meet emergency boration requirements
c. Following SI realignment verifies sufficient SOM Address AOP-001 for corrective action following SI termination e Initiates corrective action 4, Steam Ou Failure
a. Notes SG-PORVs operating with condenser available
b. Investigates and finds steam dump mal function
c. Investigates cause and corrects
d. Initiates corrective action,
5. CCW Leak
a. Interprets indications and recognizes a loss of CCW
b. Perform immediate action of AOP-014
c. Refers to AOP-014 for auto and immediate action verification
d. Performs follow-up action of AOP-014

~.

1

~ I~

Rev. 0 LESSON CODE: SS7421H C. Exercise Performance (continued) SF SRO RO BOP

e. Trouble shoots and isolates leak to source
f. Performs system realignment to isolate leak
g. Address potential environmental concerns
6. Loss of second CSIP
a. Recognizes severity of failure
b. Immediately takes action to reduce RCS inventory loss
c. Takes action to recover any CSIP
d. Addresses EPP-001 as the only procedure that remotely covers the situation P
7. RCP seal failure LOCA
a. Perform immediate action of AOP-016
b. Addresses AOP-016 for verification
c. Recognizes impact of excessive leakage W/0 CSIPs
d. Initiates rapid cooldowns to allow depressurization to reduce leakage
e. Classifies event and makes notifi-cations as required by the PEP
f. Properly injects accumulators
g. Request assistance from plant staff
h. Places RHR in service when allowable
8. Added Mal functions

'a ~

b.

c~

~e h

~ ~

@Ca h '

~ ~

'1 ~

h

.t 'p I

0. Siaolator Exercise Coaments:

NTS/AI-26

e, e

~ a )

(

~ I ah y g t~ 4~

~/ '

E~ Exercise Critique: SF-S/U BOP-S/U SRO - S/U STA-S/U W

RO - S/U Overall Group Evan -S/U F~ Student Cosiients/SiauI ator I aproveaent:

Instructor 's Signatur e S IMP E RFORM Page 3 of 3 Rev. 1

P 4 ~ ~

C .I

~

~ a I k

t 4"

tif e

P4

Rev. 0 4/12/84 SHNPP SIMULATOR EXERCIS IDE EXERCISE: S/G Tube Leak/Rupture/ATNS/ FILE RQ. CLC-7-5-2 TINE: A bra S/G PORV Failed Open OBJECTIVES:

open P

Upon completion of this

/P k to stabi1 ize the pl ant, k, k / i /<<P/

exercise, the student will be able to:

and minimize radioactive rel eases to the environment per FPP-17.

2. Take proper actions to put the reactor in a safe shutdown condition following an ATWS event.

RELATED LER's, UER's, POER's, etc: Ginna - January 25, 1982--S/G tube rupture; tu e ea ; - LER-81-026 tube leak; HBR - LER-81-022 tube leak.

INITIAL CONDITIONS IC-11 (MOL) Present Previous Present Power 3 1/2 hrs. 5% PWR 75%

5579'F Tav 578'F 380 ppm Boron 450 ppm

~p.

INSTRUCTOR GUIDE:

ower, fail CCW e eak during subsequent P

pump.

P actuation. An ATWS event will occur.

//P<<

pwr increase.

103 on "D" Rod

. p Hgt. 194 on "D"

/PP Fail N-42 after 90% calorimetric, and insert S/G tube Increase tube leak severity to cause SI

. k SHIFT TURNOVER INFORMATION:

sve p ant condst1ons. ant at 5% power following trip of "B" condensate pump ..

(BKR malfunction). Repairs are completed. Synchronize to grid and increase power to 100%.

MALFUNCTIONS OVERRIDES REMOTE OPS T-0 All Auto R Trip T-0 PZR "A"

heaters Gr-A off Functions (Disabled) T-0 RHR pump (stop)

T-0 Manual R Trips T-30 "A" CCW pump (stop)

(Disable5)

T-0 IR Channel 35 (Undercompensated)

T-90 PR Channel 42 (Instr.

Power Fuses Blown)

T-130 Rather Than C-Loop, Leak in (A-Loop)

T-130 Generator Tube Leak (24 GPM Increase to 600 GPM)

T-VAR Power Oper. Rel. Valve (Failed Open)

SUPPLEMEN AL IN ORMATION:

pump - se>ze motor bearing PZR heaters Gr-A breaker tripped at control cabinet - due to overcurrent (heater grounds)

ATWS - BKR failure TR-412 bT pen - stuck pen "A" RHR pump - electrical circuit breaker closing mechanism failure N Instrument power fuses blown EXPECTED RESPONSE: AS PER SERIAL RELATED CHECKOFF RE(}UIREMENTS: 2, 3, 5A, 7, 8, 14, 16, 19, 21, 23, 24, 25, 26, 31

I ~ I

SINLATOR EXERCISE PERFORMANCE/OBSERVATION RECORD Course Group Date Instructors Gradings: S = Satisfactory U = Unsatisfactory I. Exercise A. Initial Conditions/Scenario - exercise guide B. Shift Assignments R S/U p Manipulations Per. Su Per. Su SF

2. SRO
3. RO 4~ BOP
5. STA I I. Evaluation SRO RO BOP STA A. General
1. Supervisory ability--
a. Effective supervision of others
b. Effective direction of other
2. Operator communications passes along information accurately and promptly
3. Annunciator response--immediately responds uses alarm procedure 4, Use of procedures pulls procedure and utilizes
5. Systematic and logical approach to problems
6. a. Attentive to instrumentation and controls
b. Compares redundant channels
c. Compares meter to recorder
7. Alertness aware of plant status at all times B. Shift Turnover
1. Oral turnover
2. Hourly logs
3. Review control board 4, Test annunciat'or lights Rev. 0

0 ~s e c p

C lp

Rev. 0 4/12/84 FILE NO. CLC-7-5-2 C. Exercise Performance SF SRO RO BOP

1. Reactor Critical with Reactor Power < 3'X a ~ eri ies, nitia on itions
b. Maintains Primary and Secondary (1) S/G Level.

(2) R Power < 3'3)

T ve/T ef c~ Generator Start-up (1) Voltage Control (2) Synchronizing

2. Power Escalation Cl 0

,/Tp

b. Turbine Load Limits c ~ Generator Loading (MVARs)
d. S/G Level Control
e. MSR Operation
f. Maintains CAOC go Anticipates Xenon Transients
h. Secondary Calorimetric at 90'X 1 ~ Uses Curves J ~ Identifies bT pen failure
3. Com onent Coolin Water Pum Failure a ~ dent>>cation (1) Acknowledges Annuciators (2) Checks Flow Indicators b.' Immediate Actions (1) Starts Backup Pump (2) Verifies flow (3) Refers to AOP-14

~ Subsequent Actions (1) Investigates Cause (2) Checks Tech Specs (3) Informs ISC (4) Fills Out Work Request (5) Aligns C Pump as Backup

4. Power Range NI Failure a e Immediate Actions (1) Stabilizes Plant (2) Refers to Tech Specs
b. Subsequent Actions (1) Rod Stop Bypassed (2) Comparator Channels Oefeated (3) Fuses Removed (4) OP-OT aT Bistables Tripped (5) Mrites Clearance (6) Refers to AOP 8 OWP

0 \

l ~

j I

5 1

ra ~

4, h

NTS(Al-Z6 13 Rev.

0 ~

~

+Jk Jg'

E. xercfse Crftfque: SF - S/U BOP - S/U SRO - S/U STA - S/U RO - S/U Overall Group Eval. - S/U F. Student Comnents/Sfaalator Improvement:

Instructor's Signature NTS/AI-26 14 Rev.

C- C.R

~ e.-g